Document Details
Name of Department/Committee : CHD 06
Document Number : CHD 06 ( 25353)
IS Number (Technical Department) : IS 16260 : 2019
Document Title [English] : GAS ANALYSIS — PREPARATION OF CALIBRATION GAS MIXTURES — PART 1: GRAVIMETRIC METHOD FOR CLASS I MIXTURES Amendment No. 1
Document Title [Hindi] : गैस विश्लेषण — अंशशोधन गैस मिश्रणों की तैयारी — भाग 1: वर्ग 1 मिश्रणों के लिए ग्राविमैट्रिक विधि संशोधन संख्या 1
Document Type : Amendment
Amendment No : 1
Language : English
Priority : 3
ICS Code :
Date of Project Approval : 09-06-2023
Standards to be Superseded :

Sl.No. Synosis Points
1 This Amendment No. 1 is identical with Amendment No. 1 of ISO 6142-1:2015, ‘Gas Analysis – Preparation of Calibration Gas Mixtures Part 1: Gravimetric Method for Class I Mixtures’ issued in 2020 by International Organization for Standardization (ISO).

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 23-04-2024 23-07-2024 23-08-2024 23-10-2024 Ms. BUNTY MUDI 23-04-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 09-06-2023 -------
2 P-Draft Waived 23-04-2024 -------
3 WC Draft 23-04-2024 Duration : 60 Days
Submitted for HOD approval
Remarks : In the 25th meeting of CHD 06 the committee decided to identically adopt the amendment no 1 to the ISO 6142-1 : 2015 and send into wide circulation for a period of 60 days
-------
4 WC Draft 29-04-2024 WC rejected by HOD
Remarks: Please put up with corrections as discussed.
-------
5 WC Draft 29-04-2024 Duration : 60 Days
Submitted for HOD approval
Remarks : Corrections done as suggested
-------
6 WC Draft 29-04-2024 WC rejected by HOD
Remarks: Please put up with corrections as discussed.
-------
7 WC Draft 29-04-2024 Duration : 60 Days
Submitted for HOD approval
Remarks : Corrections done as suggested
-------
8 WC Draft 30-04-2024 WC approved by HOD
CHDC   -------