Document Details
Name of Department/Committee : MED 03
Document Number : MED 03 ( 26440)
Document Title [English] : AIR FILTERS FOR GENERAL VENTILATION PART 2 MEASUREMENT OF FRACTIONAL EFFICIENCY AND AIRFLOW RESISTANCE First Revision
Document Title [Hindi] : सामान्य संवातन के लिए एयर फिल्टर भाग 2 भिन्नात्मक दक्षता और वायु प्रवाह प्रतिरोधिता का मापन ( पहला पुनरीक्षण )
Document Type : Revision
Language : English
Priority : 1
ICS Code : 91.140.30
Date of Project Approval : 24-06-2024
Standards to be Revised :
Sl.No. Is No & Year
1 IS 17570 : Part 2: 2021
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 17570 : Part 2: 2021


Classification Details
Group : Electrical Appliances and Accessories
Sub Group : Cooling and refrigeration Equipment
Sub Sub Group : Refrigeration equipment
Aspects : Methods of tests
Risk : None
Certification : Not Certifiable
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Commerce and Industry - Department for Promotion of Industry and Internal Trade (DPIIT)
Sustainable development Goals :
Degree of Equivalence : Identical under dual numbering
Identical/Equivalent Standards : ISO 16890-2:2022
Organization Type: ISO

::Cross Referenced Indian Standard::
Sl. No. Is No & Year IS Title
1 IS 14615 : Part 1: 2018 Measurement of fluid flow by means of pressure differential devices inserted in circular crossSection conduits running full: Part 1 : general principles and requirements (First Revision)
2 IS 16753 : Part 1: 2022 High Efficiency Filters and Filter Media for removing Particles from Air Part 1 Classification Performance Testing and Marking First revision

::Cross Referenced International Standard(s) & Standard(s) Of National SDO(s) ::
Sl. No. Prefix Number Part Section Year
1 ISO 21501 1 - -

Sl.No. Synosis Points
1 This document specifies the aerosol production, the test equipment and the test methods used for measuring fractional efficiency and air flow resistance of air filters for general ventilation.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 28-08-2024 28-11-2024 28-12-2024 28-02-2025 Ms. NEHA THAKUR 28-08-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 24-06-2024 -------
2 P-Draft Waived 28-08-2024 -------
3 WC Draft 28-08-2024 Duration : 30 Days
Submitted for HOD approval
-------
4 WC Draft 05-09-2024 WC rejected by HOD
Remarks: Please correct the document
-------
5 WC Draft 19-09-2024 Duration : 30 Days
Submitted for HOD approval
Remarks : Dear Sir PFA modified document as discussed
-------
6 WC Draft 19-09-2024 WC approved by HOD
MEDC   -------
7 Skipped to Finalization 06-01-2025 Stage-Changed -------
8 Finalization 02-12-2024 ------ -------
9 Final Draft 06-01-2025 Submited for HOD approval
-------
10 Final Draft draft accepted by HOD and sent to Publication 06-01-2025 Final Draft approved by HOD -------
11 Accepted by Publication 08-01-2025 Final Draft accepted by Publication
Remarks: Accepted by Publication
-------
12 Skipped to Pdf Stage 16-01-2025 Proof to Technial Department Stage-Skipped -------
13 Pdf sent by Publication to Technical Department 17-01-2025 1. Please find enclosed the PDF attached. 2. Department to take following actions: A. Provide DC approval in the relevant tab of the portal. B. Confirm the correctness of the document. C. Give recommendation for proceeding to gazette details. -------