Document Details
Name of Department/Committee : CHD 01
Document Number : CHD 01 ( 26713)
Document Title [English] : Potassium Iodate - Specification (First Revision)
Document Title [Hindi] : पोटैशियम आयोडेट — विशिष्टि (पहला पुनरीक्षण)
Document Type : Revision
Language : English
Priority : 2
ICS Code : 71.060.50
Date of Project Approval : 30-08-2024
Standards to be Revised :
Sl.No. Is No & Year
1 IS 13057: 1991
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 13057: 1991


Classification Details
Group : Chemicals, Plastics and their Products including packaging and Environment
Sub Group : Chemicals
Sub Sub Group : General Industrial Chemiclas
Aspects : Product Specification
Risk : None
Certification : Voluntary Certification
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Chemicals and Fertilizers - Department of Chemicals and Petrochemicals (DCPC)
Sustainable development Goals :
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

::Cross Referenced Indian Standard::
Sl. No. Is No & Year IS Title
1 IS 1070: 2023 Reagent Grade Water Specification (Fourth Revision)
2 IS 2088: 2023 METHODS FOR DETERMINATION OF ARSENIC (THIRD REVISION)
3 IS 3025 : Part 2: 2019 Methods of Sampling and Test (Physical and Chemical) for Water and Wastewater: Part 2 Determination of Selected Elements by Inductively Coupled Plasma Optical Emission Spectrometry (ICP - OES) (First Revision)
4 IS 3025 : Part 65: 2022 Methods of Sampling and Test Physical and Chemical for Water and Wastewater Part 65 Application of Inductively Coupled Plasma Mass Spectrometry ( ICP-MS ) Determination of selected elements including Uranium Isotopes (first revision)
5 IS 4905: 2015 Random sampling and randomization procedures (First Revision)

Sl.No. Synosis Points
1 This standard prescribes requirements and methods of sampling and test for potassium iodate. In this first revision, instrumental test methods for the determination of chloride, sulphate, lead, arsenic and iron have been added as alternate test methods. In addition to this, editorial corrections have been made wherever required. Also, Reference clause and Packing & Marking clause have been updated.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 09-10-2024 09-02-2025 09-03-2025 09-07-2025 SAGAR SINGH 09-10-2024