Document Details
Name of Department/Committee : CED 46
Document Number : CED 46 ( 26227)
Document Title [English] : National Building Code of India Part 8 Building Services Section 5 Installation of Lifts Escalators and Moving Walks 5B Escalators and Moving Walks
Document Title [Hindi] : भारत की राष्ट्रीय भवन निर्माण संहिता भाग 8 भवन निर्माण सेवाएँ अनुभाग 5 लिफ्ट, स्वचालित सीढियाँ तथा चलपथ की स्थापना 5B स्वचालित सीढियाँ तथा चलपथ
Document Type : Revision
Language : English
Priority : 3
ICS Code : 01.120: 91.040.01
Date of Project Approval : 16-04-2024
Standards to be Revised :
Sl.No. Is No & Year
1 SP 7: 2016
Standards to be Superseded :
Sl.No. Is No & Year
1 SP 7: 2016


Classification Details
Group : Civil Engineering Design and Construction
Sub Group : Construction practices, measurement and management
Sub Sub Group : NBC of India
Aspects : Others
Risk : High
Certification : Not Certifiable
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Housing and Urban Affairs
Sustainable development Goals :
  • SUSTAINABLE CITIES AND COMMUNITIES
  • INDUSTRY, INNOVATION AND INFRASTRUCTURE
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 The significant modifications made in this revision of the subsection include amongst others, the following key changes: a) The terminology has been updated and includes maintenance aspects and electrical safety system. b) The requirements of power supply including protection devices have been elaborated, in 6.5.3. c) Fire protection requirements for the installations have been elaborated, in 7. d) Technical requirements for outdoor escalators/moving walks and semi- outdoor escalators/moving walks have been included in 9.2 and 9.3. e) Inspection check list has been reviewed and revised, under 14.6.2. f) Annex A on typical escalator site checklist/inspection list has been considerably revised. g) Annex B on typical check list for functional tests on safety switches and devices has been revised.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 25-07-2024 25-12-2024 12-03-2025 27-07-2025 S ARUN KUMAR 25-07-2024