Document Details
Name of Department/Committee : LITD 02
Document Number : LITD 02 ( 26394)
Document Title [English] : Reliability Testing Compliance Tests for Constant Failure Rate and Constant Failure Intensity First Revision
Document Title [Hindi] : विश्वसनीयता परीक्षण – स्थिर विफलता दर और स्थिर विफलता तीव्रता के लिए अनुपालन परीक्षण (पहला पुनरीक्षण)
Document Type : Revision
Language : English
Priority : 3
ICS Code : ICS: 03.120.30;19.020;21.020
Date of Project Approval : 11-09-2023
Standards to be Revised :
Sl.No. Is No & Year
1 IS/IEC 61124 : 2012
Standards to be Superseded :
Sl.No. Is No & Year
1 IS/IEC 61124 : 2012


Classification Details
Group : Electronic and Telecom equipments, components and devices
Sub Group : Electronic components and devices
Sub Sub Group : Reliability and Dependability of Electronic Components
Aspects : Methods of tests
Risk : None
Certification : Not Certifiable
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Electronics and Information Technology
Sustainable development Goals :
Degree of Equivalence : Identical under single numbering
Identical/Equivalent Standards : IEC 61124 :2023
Organization Type: IEC

Sl.No. Synosis Points
1 A compliance test is an essential part of the reliability assurance system [7], [8], [9]. Reliability is affected by many random factors, so its prediction is not accurate. The direct way to check if the item meets its reliability specifications is to perform a compliance test. The tests described in this document can be applied to items that have a failure rate or failure intensity (denoted by λ) which can be considered as a constant. The procedures are based on the assumption that trials of the test are statistically independent. If it is necessary to test the constant failure rate and constant failure intensity assumption, the procedures given in IEC 60605-6 should be used.
2 This document gives a number of optimized test plans, the corresponding border lines and characteristics. In addition, the algorithms for designing test plans using a spreadsheet program are also given, together with guidance on how to choose test plans.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 21-08-2024 21-01-2025 05-04-2025 20-08-2025 DEVANSH DEOLEKAR 21-08-2024