Document Details
Name of Department/Committee : FAD 08
Document Number : FAD 08 ( 27606)
Document Title [English] : Acacia (arabic) gum, food grade - Specification (second revision)
Document Title [Hindi] : एकैशिया (अरेबिक) गम, खाद्य ग्रेड — विशिष्टि (दूसरा पुनरीक्षण)
Document Type : Revision
Language : English
Priority : 3
ICS Code : 67.220.20
Date of Project Approval : 13-12-2024
Standards to be Revised :
Sl.No. Is No & Year
1 IS 6795: 2007
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 6795: 2007


Classification Details
Group : Food, Food Products and food processing equipments
Sub Group : Food Additives and Food Ingredients
Sub Sub Group : Synthetic Colours, Artificial Sweeteners &Method of Test
Aspects : Product Specification
Risk : Medium
Certification : Voluntary Certification
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Food Processing Industries
Sustainable development Goals :
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

::Cross Referenced Indian Standard::
Sl. No. Is No & Year IS Title
1 IS 1070: 2023 Reagent Grade Water Specification (Fourth Revision)
2 IS 1699: 2024 Food colours - Methods of sampling and test (third revision)
3 IS 2491: 2024 Food Hygiene — General Principles — Code of Practice (Fourth Revision)
4 IS 16067 : Part 3: 2023 Microbiology of the food chain Horizontal method for the enumeration of beta glucuronidase positive Escherichia coli Part 3: Detection and most probable number technique using 5-bromo-4-chloro-3- indolyl--D-glucuronide
5 IS 5887 : Part 3: 1999 Methods for detection of bacteria responsible for food poisoning: Part 3 general guidance on methods for the detection of salmonella (Second Revision)
6 IS 7238: 2025 Tragacanth gum, food grade - Specification (second revision)

Sl.No. Synosis Points
1 This standard prescribes requirements and methods of sampling and test for acacia (arabic) gum, food grade.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 19-02-2025 19-07-2025 04-10-2025 19-02-2026 Mr. KULDEEP 19-02-2025