Document Details
Name of Department/Committee : TXD 23
Document Number : TXD 23 ( 27764)
Document Title [English] : TEXTILES HIGH DENSITY POLYETHYLENE HDPEPOLYPROPYLENE PP WOVEN SACKS FOR PACKAGING FERTILIZERS - SPECIFICATION (SEVENTH REVISION)
Document Title [Hindi] : वस्त्रादि — उर्वरकों की भराई के लिए उच्च घनत्व पोलीइथाइलीन ( एच. डी. पी. ई. ) / पोलीप्रोपाइलीन ( पी. पी. ) के बोरे — विशिष्टि ( सातवां पुनरीक्षण )
Document Type : Revision
Language : English
Priority : 3
ICS Code : 55.080; 65.080
Date of Project Approval : 27-02-2025
Standards to be Revised :
Sl.No. Is No & Year
1 IS 9755: 2021
2 IS 9755: 2021
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 9755: 2021


Classification Details
Group : Textile, Textile Products and Machinery
Sub Group : Cotton, wool and man made textile Products
Sub Sub Group : Made up textile items
Aspects : Product Specification
Risk : Medium
Certification : Mandatory Certification
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Chemicals and Fertilizers - Department of Chemicals and Petrochemicals (DCPC)
Sustainable development Goals :
  • INDUSTRY, INNOVATION AND INFRASTRUCTURE
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 This revision of the standard specifies the constructional and performance requirements of HDPE/PP woven sacks for packaging of fertilisers with nominal filling capacity of 40 kg, 45 kg and 50 kg.
2 This revision of the standard addresses the sustainability aspects by incorporating the recommended sustainable practices in manufacturing of HDPE/PP wove sacks.
3 This revision of the standard specified the modified test methods for determination of ‘Sack Dimensions’, ‘Ends and Picks per Decimeter’, ‘Fabric Mass’, and ‘Mass of Sack’.
4 This revision of the standard incorporates the recommendation for promoting the use of defective or rejected or waste HDPE/PP woven fabric and sacks as a packaging material.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 20-03-2025 20-08-2025 04-11-2025 19-03-2026 Mr. Amit Kumar Pandey 20-03-2025