Document Details |
|||||
| Name of Department/Committee : | CED 47 | ||||
|---|---|---|---|---|---|
| Document Number : | CED 47 ( 28402) | ||||
| Document Title [English] : | Planning and Design of Ports and Harbours Code of Practice Part 5 Layout Functional and Environmental Requirements First Revision | ||||
| Document Title [Hindi] : | पत्तनों और पोताश्रयों की योजना और रूप — रीति संहिता भाग 5 अभिन्यास, कार्यात्मक और पर्यावरणीय अपेक्षाएँ (पहला पुनरीक्षण ) | ||||
| Document Type : | Revision | ||||
| Language : | English | ||||
| Priority : | 3 | ||||
| ICS Code : | 93.140 | ||||
| Date of Project Approval : | 12-07-2025 | ||||
| Standards to be Revised : |
|
||||
| Standards to be Superseded : | |||||
Classification Details |
|
| Group : | Civil Engineering Design and Construction |
| Sub Group : | Ports harbours and offshore installations |
| Sub Sub Group : | Ports, Harbours and Offshore Installations |
| Aspects : | Code of Practice |
| Risk : | Low |
| Certification : | None |
| Short Commom Man's Title : | |
| ITCHS Code : | |
| Ministry : |
|
| Sustainable development Goals : | |
| Degree of Equivalence : | Indigenous |
| Identical/Equivalent Standards : | |
| Organization Type: | |
| Sl.No. | Synosis Points | |
| 1 | This standard outline some of the desirable technical characteristics of ideal ports and harbours and is intended to provide some guidelines to the planners and designers who may be required to select a specific site, with in the general locality specified, and develop a new or an existing port and harbour. | |
| 2 | This standard (Part V) lays down functional requirements for the planning and developing of commercial ports and harbours and gives a general recommendation for the layout, functional and environmental requirements: a) Site investigation; b) Navigation Channel; c) Navigation studies (shipping manoeuvrability study, passing ship analysis); d) Harbour basin; e) Piers and wharves; f) Storage areas and sheds and storage of hazardous/obnoxious cargo; g) Open storage area; h) Other functional and operational buildings; j) Roads and port railways; k) fire protection measures; m) EIA and EMP for Port Projects; n) Dredging & Reclamation including disposal (Reuse of dredge material); p) Tranquility of port; and q) Material Handling system (Semi mechanised or fully mechanised, optimum handling facility). | |
Timeline Details |
|||||||
|
|
|||||||
|
|||||||
|
|||||||