Document Details
Name of Department/Committee : MHD 02
Document Number : MHD 02 ( 28424)
Document Title [English] : Implants for Surgery Measurements of Open-circuit Potential to Assess Corrosion Behaviour of Metallic Implantable Materials and Medical Devices Over Extended Time Periods
Document Title [Hindi] : सर्जरी के लिए प्रत्यारोपण — विस्तारित समय अवधि में धातु प्रत्यारोपण योग्य सामग्रियों और चिकित्सा उपकरणों के संक्षारण व्यवहार का आकलन करने के लिए ओपन-सर्किट क्षमता का मापन
Document Type : New
Language : English
Priority : 3
ICS Code : 11.040.40
Date of Project Approval : 25-07-2025
Standards to be Superseded :


Classification Details
Group : Medical and Hospital Equipments
Sub Group : Implants
Sub Sub Group : Orthopaedic Implants
Aspects : Methods of tests
Risk : Low
Certification : Voluntary Certification
Short Commom Man's Title : Measurements of Open-circuit Potential to Assess Corrosion Behaviour of Metallic Implantable Materia
ITCHS Code :
Ministry :
  • Ministry of Health and Family Welfare - Department of Health and Family Welfare
Sustainable development Goals :
  • GOOD HEALTH AND WELL BEING
Degree of Equivalence : Identical under dual numbering
Identical/Equivalent Standards : ISO 16429:2004
Organization Type: ISO

Sl.No. Synosis Points
1 This standard specifies a test method for measurements over extended time periods of the open-circuit potential of implant materials and surgically implantable devices immersed in a test environment related to body fluid, using a standard corrosion test cell to study the electrochemical corrosion properties of the devices.
2 This method of monitoring the open-circuit potential can also be combined with mechanical static or dynamic loading tests.
3 This standard is applicable in particular to metallic materials which form passive layers with protective properties against corrosion, as typical for surgical implant materials.
4 This test method is intended for the investigation of single metallic materials or alloys. It is not applicable to dissimilar material combinations, which require particular considerations in measuring and interpreting the results.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 25-07-2025 25-12-2025 12-03-2026 27-07-2026 Mr. VINIT VIDYADHAR BANSOD 25-07-2025