Document Details
Name of Department/Committee : CHD 36
Document Number : CHD 36 ( 28455)
Document Title [English] : Water Quality — Sampling Part 26 Guideline on the validation of the storage time of water samples
Document Title [Hindi] : जल की गुणवत्ता — नमूने लेने भाग 26 जल के नमूनों का भंडारण समय के सत्यापन पर मार्गदर्शन
Document Type : New
Language : English
Priority : 2
ICS Code : 13.060.45
Date of Project Approval : 27-07-2025
Standards to be Superseded :


Classification Details
Group : Chemicals, Plastics and their Products including packaging and Environment
Sub Group : Environment management
Sub Sub Group : Methods of Sampling and test of water and wastewater
Aspects : Code of Practice
Risk : None
Certification : Not Certifiable
Short Commom Man's Title : Guideline on the validation of the storage time of water samples
ITCHS Code :
Ministry :
  • Ministry of Environment, Forest and Climate Change
Sustainable development Goals :
Degree of Equivalence : Identical under dual numbering
Identical/Equivalent Standards : ISO/TS 5667-25 : 2022
Organization Type: ISO

Sl.No. Synosis Points
1 The Indian Standard IS 17614 has been published in several parts under the general title ‘Water Quality — Sampling’. This part of IS 17614 specifies guideline on the validation of the storage time of water samples, test plans and different operating methodologies of these test plans to define and verify the acceptable length of stability of a substance in a sample under specified conditions of preservation (temperature, matrix, light, addition of a stabilizer, where appropriate, type of preservation etc.) before starting analytical protocols (chemicals and physico-chemicals analysis).
2 It is necessary to have an analytical method with performances that have already been characterized (repeatability, intermediate precision, trueness, accuracy and uncertainty) in order to perform the stability study and implement its test plans. The other parts of this series are:

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 27-07-2025 27-11-2025 27-12-2025 27-04-2026 Ms. SHUBHANJALI UMRAO 27-07-2025