Document Details
Name of Department/Committee : TXD 32
Document Number : TXD 32 ( 28463)
Document Title [English] : Textiles Protective clothing Part 2 Assessment of material assemblies when exposed to source of radiant heat
Document Title [Hindi] : वस्त्रादि - सुरक्षा वस्त्र भाग 2 विकरण ऊष्मा के स्त्रोत से संपर्क पर वस्त्रादि सामग्री का आंकलन
Document Type : Revision
Language : English
Priority : 1
ICS Code : 13.340.10
Date of Project Approval : 30-06-2025
Standards to be Revised :
Sl.No. Is No & Year
1 IS 15758 : Part 2: 2007
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 15758 : Part 2: 2007


Classification Details
Group : Textile, Textile Products and Machinery
Sub Group : Cotton, wool and man made textile Products
Sub Sub Group : Cotton and man-made textiles
Aspects : Methods of tests
Risk : Low
Certification : Not Certifiable
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Textiles
Sustainable development Goals :
Degree of Equivalence : Identical under dual numbering
Identical/Equivalent Standards : ISO 6942:2022
Organization Type: ISO

Sl.No. Synosis Points
1 This document specifies two complementary methods (method A and method B) for determining the behaviour of materials for heat protective clothing subjected to heat radiation. These tests are carried out on representative single or multi-layer textiles or other materials intended for clothing for protection against heat. They are also applicable to assemblies, which correspond to the overall build up of a heat protective clothing assembly with or without underclothing, Method A serves for visual assessment of any changes in the material after the action of heat radiation. With method B the protective effect of the materials is determined. The materials may be tested either by both methods or only by one of them. The tests according to these two methods serve to classify materials; however, to be able to make a statement or prediction as to the suitability of a material for protective clothing additional criteria must be taken into account. Since the tests are carried out at room tempera

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 29-07-2025 29-10-2025 29-11-2025 29-01-2026 Mr. MAYUR KATIYAR 29-07-2025