Document Details
Name of Department/Committee : LITD 11
Document Number : LITD 11 ( 28617)
Document Title [English] : Optical fibres Optical fibres: Part 1 measurement methods and test procedures: Sec 34 fibre curl first Revision
Document Title [Hindi] : प्रकाशिक तंतु भाग 1 मापन विधियाँ और परिक्षण प्रक्रियाएँ अनुभाग 34 तन्तु कर्ल (पहला पुनरीक्षण)
Document Type : Revision
Language : English
Priority : 3
ICS Code : 33.180.10
Date of Project Approval : 18-08-2025
Standards to be Revised :
Sl.No. Is No & Year
1 IS/IEC 60793 : Part 1 : Sec 34: 2006
Standards to be Superseded :
Sl.No. Is No & Year
1 IS/IEC 60793 : Part 1 : Sec 34: 2006


Classification Details
Group : Electronic and Telecom equipments, components and devices
Sub Group : Electronic components and devices
Sub Sub Group : Fibre optics & Accessories
Aspects : Methods of tests
Risk : None
Certification : Not Certifiable
Short Commom Man's Title : Optical Fibres Part 1 Measurement Method and Test Procedures Section 34 Fibre Curl
ITCHS Code : NA
Ministry :
  • Ministry of Communications - Department of Telecommunications (DOT)
Sustainable development Goals :
Degree of Equivalence : Identical under single numbering
Identical/Equivalent Standards : IEC 60793-1-34: 2021
Organization Type: IEC

Sl.No. Synosis Points
1 This Indian Standard (Part 1/Sec 44) which is identical with IEC 60793-1-44 : 2011 ‘Optical fibres — Part 1-44: Measurement methods and test procedures — Cut-off wavelength’ issued by the International Electrotechnical Commission (IEC) was adopted by the Bureau of Indian Standards on the recommendation of the Fibre Optics, Fibres, Cables and Devices Sectional Committee and approval of the Electronics and Information Technology Division Council
2 This part of IEC 60793 establishes uniform requirements for measuring the cut-off wavelength of single-mode optical fibre, thereby assisting in the inspection of fibres and cables for commercial purposes.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 28-08-2025 28-01-2026 12-04-2026 27-08-2026 Mr. PRIYANSHU SHARMA 28-08-2025