Document Details
Name of Department/Committee : LITD 11
Document Number : LITD 11 ( 28629)
Document Title [English] : Optical fibres: Part 1 measurement methods and test procedures: Sec 31 tensile strength First Revision
Document Title [Hindi] : प्रकाशित तंतु भाग -1 विधियाँ और परीक्षण प्रक्रियाएँ : अनुभाग 31 तनन सामर्थ्य (पहला पुनरीक्षण)
Document Type : Revision
Language : English
Priority : 3
ICS Code : 33.180.10
Date of Project Approval : 18-08-2025
Standards to be Revised :
Sl.No. Is No & Year
1 IS/IEC 60793 : Part 1 : Sec 31: 2010
Standards to be Superseded :
Sl.No. Is No & Year
1 IS/IEC 60793 : Part 1 : Sec 31: 2010


Classification Details
Group : Electronic and Telecom equipments, components and devices
Sub Group : Electronic components and devices
Sub Sub Group : Fibre optics & Accessories
Aspects : Methods of tests
Risk : None
Certification : Not Certifiable
Short Commom Man's Title : Optical fibres: Part 1 measurement methods and test procedures: Sec 31 tensile strength
ITCHS Code : NA
Ministry :
  • Ministry of Communications - Department of Telecommunications (DOT)
Sustainable development Goals :
Degree of Equivalence : Identical under single numbering
Identical/Equivalent Standards : IEC 60793-1-31:2019
Organization Type: IEC

Sl.No. Synosis Points
1 The formal decisions or agreements of IEC on technical matters express, as nearly as possible, an international consensus of opinion on the relevant subjects since each technical committee has representation from all interested IEC National Committees
2 This part of IEC 60793 provides values of the tensile strength under dynamic loading of optical fibre samples. The method tests individual lengths of uncabled and unbundled glass optical fibre. Sections of fibre are broken with controlled increasing stress or strain that is uniform over the entire fibre length and cross section. The stress or strain is increased at a nominally constant rate until breakage occurs.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 28-08-2025 28-01-2026 12-04-2026 27-08-2026 Mr. PRIYANSHU SHARMA 28-08-2025