Document Details
Name of Department/Committee : MHD 08
Document Number : MHD 08 ( 28027)
Document Title [English] : Dentistry Screw Loosening Test Using Cyclic Torsional Loading for Implant BodyImplant Abutment Connection of Endosseous Dental Implants
Document Title [Hindi] : दंत चिकित्सा — एंडोओसियस दंत इम्प्लांट के इम्प्लांट बॉडी/इम्प्लांट एबटमेंट कनेक्शन के लिए चक्रीय टॉर्शनल लोडिंग का उपयोग करके स्क्रू ढीला होने का परीक्षण
Document Type : New
Language : English
Priority : 3
ICS Code : 11.060.15
Date of Project Approval : 08-05-2025
Standards to be Superseded :


Classification Details
Group : Medical and Hospital Equipments
Sub Group : Dentistry instruments/equipment and accessories
Sub Sub Group : Filling and restorative materials
Aspects : Methods of tests
Risk : Low
Certification : Voluntary Certification
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Health and Family Welfare - Department of Health and Family Welfare
Sustainable development Goals :
Degree of Equivalence : Identical under dual numbering
Identical/Equivalent Standards : ISO 18130:2016
Organization Type: ISO

Sl.No. Synosis Points
1 This Technical Report provides guidelines for a method to determine the extent of screw loosening of the metallic implant body/implant abutment joint of endosseous dental implants, such as two-part implants or multi-part implants under cyclic torsional loading. This test is most appropriate for evaluating new types of joints fixed using screw(s) and metallic connecting parts. This Technical Report provides a protocol for torsional cyclic torque on an implant body/implant abutment joint, but its intended use is for prefabricated implant bodies, implant abutments and, if appropriate, implant connecting parts that are made of metallic materials
2 It is not applicable to ensure the in vivo performance of endosseous dental implants and is not derived from observations of clinical failures. NOTE This Technical Report is not intended for use with temporary abutments.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 08-05-2025 08-10-2025 23-12-2025 08-05-2026 Ms. HARSHADA GANESH KADAM 08-05-2025