Document Details
Name of Department/Committee : CED 47
Document Number : CED 47 ( 28189)
Document Title [English] : Planning and Design of Ports and Harbours Code of Practice Part 4 General Design Considerations
Document Title [Hindi] : पत्तनों और पोताश्रयों की योजना और रूप — रीति संहिता भाग 4 सामान्‍य रूप रेखा के लिए विचार
Document Type : Revision
Language : English
Priority : 3
ICS Code : 93.140
Date of Project Approval : 05-05-2025
Standards to be Revised :
Sl.No. Is No & Year
1 IS 4651 : Part 4: 2023
Standards to be Superseded :


Classification Details
Group : Civil Engineering Design and Construction
Sub Group : Ports harbours and offshore installations
Sub Sub Group : Ports, Harbours and Offshore Installations
Aspects : Code of Practice
Risk : Low
Certification : None
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Ports, Shipping and Waterways
  • Ministry of Housing and Urban Affairs
Sustainable development Goals :
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 This standard (Part 4) deals with general design considerations for Port and Harbour structures.
2 The fifth revision of this standard has been taken up to incorporate further modifications necessary in the light of comments received from the users of this Standard. The following significant changes have been made in this revision: 1) In terminology extreme load and normal load clauses modified. 2) Partial load factors for shrinkage, creep and temperature have been included. 3) Partial load factors for quick release mooring hook (QRMH) force operational and QRMH force extreme has been modified. 4) Clause on Disposition of Fenders has been modified. 5) In Deck Elevation, Minimum Deck Top Level clause has been included. 6) Water level rise due to tsunami and the method of calculation of hydrostatic force due to tsunami of vertical face structure has been modified in Annex B.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 17-06-2025 17-11-2025 01-02-2026 16-06-2026 Mr. ASHOK SARAN 17-06-2025