Document Details
Name of Department/Committee : LITD 08
Document Number : LITD 08 ( 28342)
Document Title [English] : Nuclear power plants - Instrumentation important to safety - Radiation monitoring for accident and post - Accident conditions: Part 1 general requirements (Second Revision)
Document Title [Hindi] : आण्विक शक्ति संयंत्र – सुरक्षा के लिए महत्त्वपूर्ण यंत्रीकरण - दुर्घटना और दुर्घटना के बाद की अवस्थाओं के लिए विकिरण मॉनीटरिंग भाग 1 सामान्य अपेक्षाऐं ( दूसरा पुनरीक्षण)
Document Type : Revision
Language : English
Priority : 3
ICS Code : 27.120.20
Date of Project Approval : 22-04-2025
Standards to be Revised :
Sl.No. Is No & Year
1 IS 14481 : Part 1: 2018
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 14481 : Part 1: 2018


Classification Details
Group : Electronic and Telecom equipments, components and devices
Sub Group : Electronic equipments and systems
Sub Sub Group : Electron tubes and accessories
Aspects : Safety Standard
Risk : None
Certification : None
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Electronics and Information Technology
Sustainable development Goals :
Degree of Equivalence : Identical under dual numbering
Identical/Equivalent Standards : IEC 60951-1: 2022
Organization Type: IEC

Sl.No. Synosis Points
1 The purpose of this document is to lay down general requirements and give examples of acceptable methods for equipment for continuous monitoring of radioactivity within the facility during and after design basis accidents (DBA), design extension conditions (DEC), including severe accident (SA) in nuclear facilities.
2 This part of IEC 60951 provides general guidance on the design principles and performance criteria for equipment to measure radiation and fluid (gaseous effluents or liquids) radioactivity levels at nuclear facilities during and after design basis accidents (DBA) and design extension conditions (DEC), including severe accident (SA). This document is limited to equipment for continuous monitoring of radioactivity in design basis accidents (DBA), design extension conditions (DEC), including severe accident (SA) and post-accident conditions.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 10-07-2025 10-12-2025 25-02-2026 10-07-2026 Mr. PRIYANSHU SHARMA 10-07-2025