S No Group Number Task Date of creation Time Frame No of Members
1. EED 01 : WG01 To formulate Indian Standards on: • Framework and Implementation of Sustainability with a specific reference to supply chains and the MSME sector. • Framework and Implementation of Sustainability for other sectors, if required 28-06-2024 02-01-2026 13
2. EED 02 : WG01 To review the comments on the document and provide P-draft for the revision of the IS 11304: 1985 & IS 12185 : 1987 30-07-2025 31-10-2025 2
3. EED 02 : WG02 To review the comments on the document and provide P-draft for the revision of the IS 12112 : 1987 10-07-2025 31-10-2025 2
4. EED 02 : WG03 To review the comments on the document and provide P-draft for the revision of the IS 9078 : 1979 30-07-2025 31-10-2025 3
5. EED 02 : WG04 To review the received NWIPs i) Code of Practice for Control of Air Pollution from Plastic Waste to ULSD Production Industries. ii) Guidelines for Continuous Emission Monitoring System for Plastic Waste to ULSD Production. iii) Code of Practice for Control of Air Pollution from Plastic Waste Pyrolysis; and provide P-draft for the Standards 30-07-2025 31-10-2025 5
6. EED 02 : WG05 : To review the received NWIP- Methodology for Carrying Capacity Assessment of Ambient Air - Assimilative Method and provide P-draft for the Standards. 30-07-2025 31-10-2025 7
7. EED 02 : WG06 To review the received NWIP- Guidelines for Preparing of Air Quality Management Plan and provide P-draft for the Standards. 30-07-2025 31-10-2025 6
8. EED 02 : WG07 To review the received NWIP- Code of Practice for Control of Air Pollution from Coal Based Thermal Power Plants and provide P-draft for the Standards. 30-07-2025 31-10-2025 5
9. EED 04 : WG01 1. To study, examine and deliberate thoroughly on the existing literature, documents, data, information etc., available on the subject along with exploring the availability of the work being done by any organization/stakeholder in this reference. 2. To suggest the plan of action for development of the Indian Standard on the subject. 3. To provide a draft after following the decided plan of action for wide circulation. 4. Address the comments received on wide circulation, if any, and further till the document is published. 5. To monitor the BIS floated R&D associated with this subject. 03-05-2023 04-12-2026 4
10. EED 05 : P5 : WG1 Preparation of a working draft on ‘Plastic Waste Processors – Service Requirements and Guidelines’ 14-11-2023 24-12-2025 4
11. EED 06 : WG02 1. To study, examine and deliberate thoroughly on the existing literature, documents, data, information etc., available on the subject along with exploring the availability of the work being done by any organization/stakeholder in this reference. 2. To suggest the plan of action for development of the Indian Standard on the subject. 3. To provide a draft after following the decided plan of action for wide circulation. 4. Address the comments received on wide circulation, if any, and further till the document is published. 04-07-2023 30-11-2027 8
12. EED 06 : WG03 1. To study, examine and deliberate thoroughly on the existing literature, documents, data, information etc., available on the subject along with exploring the availability of the work being done by any organization/stakeholder in this reference. 2. To suggest the plan of action for development of the Indian Standard on the subject. 3. To provide a draft after following the decided plan of action for wide circulation. 4. Address the comments received on wide circulation, if any, and further till the document is published. 03-03-2024 03-12-2027 4
13. EED 06 : WG04 To Study and Develop Indigenous Indian Standard on Measurement of Diameter and Girth at Breast Height  of a Tree 20-06-2025 20-06-2026 3
14. EED 07 : WG01 To review and national adoption of the following ISO standards, 1. ISO 21929-1:2011 Sustainability in building construction — Sustainability indicators, Part 1: Framework for the development of indicators and a core set of indicators for buildings 2. ISO 21928-2:2023 Sustainability in buildings and civil engineering works — Sustainability indicators, Part 2: Framework for the development of indicators for civil engineering works 25-08-2025 28-02-2026 7
15. EED 07 : WG02 • To review the New Work Item Proposal related to Green Office – Requirements and Guidelines, • To provide a P-draft for developing an Indian Standard on the subject • To review and provide recommendations on the comments to be received on the Wide Circulation document. 25-08-2025 27-02-2026 9
16. EED 08 : WG01 1. To review and revise IS 10447 Guidelines for utilization and disposal of solid waste from integrated steel plants 2. To provide a draft, after thorough revision of the subject based on the available national/ international literature, standards, research papers etc., for wide circulation 3. Address the comments received on wide circulation, if any, and further till the document is published 28-11-2024 30-11-2025 6
17. EED 08 : WG02 1. Development of Indian Standards on Management of domestic hazardous waste and sanitary waste- Guidelines 2. To provide a draft, after thorough revision of the subject based on the available national/ international literature, standards, research papers etc., for wide circulation 3. Address the comments received on wide circulation, if any, and further till the document is published 14-08-2025 14-02-2026 4
18. EED 08 : WG03 1. Development of Indian Standards on Treatment and disposal of sewage sludge- Guidelines 2. To provide a draft, after thorough revision of the subject based on the available national/ international literature, standards, research papers etc., for wide circulation 3. Address the comments received on wide circulation, if any, and further till the document is published 14-08-2025 14-02-2026 3
19. EED 08 : WG04 1. Development of Indian Standards on Waste audits including data collection templates for bulk waste generators - Guidelines 2. To provide a draft, after thorough revision of the subject based on the available national/ international literature, standards, research papers etc., for wide circulation 3. Address the comments received on wide circulation, if any, and further till the document is published 14-08-2025 14-02-2026 2
20. EED 08 : WG05 1. Development of Indian Standards on Waste management guidelines for Hilly areas 2. To provide a draft, after thorough revision of the subject based on the available national/ international literature, standards, research papers etc., for wide circulation 3. Address the comments received on wide circulation, if any, and further till the document is published 14-08-2025 14-02-2026 5
21. EED 08 : WG06 1. Development of Indian Standards on Waste management guidelines for coastal zones 2. To provide a draft, after thorough revision of the subject based on the available national/ international literature, standards, research papers etc., for wide circulation 3. Address the comments received on wide circulation, if any, and further till the document is published 14-08-2025 14-02-2026 4
22. EED 08 : WG07 1. Development of Indian Standards on “Standard for Waste processing units” 2. To provide a draft, after thorough revision of the subject based on the available national/ international literature, standards, research papers etc., for wide circulation 3. Address the comments received on wide circulation, if any, and further till the document is published 14-08-2025 14-02-2026 2
23. EED 09 : WG01 The proposed standard will address the transformation of the construction sector and related branches towards a circular economy. It will embrace the different observations of action (raw materials, construction products, and construction works) in the sector, as well as the difference in service lifetime for different construction products and construction works. 08-08-2025 08-02-2026 4
24. EED 10 : WG01 To identify relevant organisation and experts, and advise the committee on co-option of such organisations and experts to sectional committee, and panels & working group under the committee. 27-08-2025 27-01-2026 4