| 1. |
EED 01 : WG01 |
To formulate Indian Standards on:
• Framework and Implementation of Sustainability with a specific reference to supply chains and the MSME sector.
• Framework and Implementation of Sustainability for other sectors, if required |
28-06-2024 |
02-01-2026 |
13
|
| 2. |
EED 02 : WG01 |
To review the comments on the document and provide P-draft for the revision of the IS 11304: 1985 & IS 12185 : 1987 |
30-07-2025 |
31-10-2025 |
2
|
| 3. |
EED 02 : WG02 |
To review the comments on the document and provide P-draft for the revision of the IS 12112 : 1987 |
10-07-2025 |
31-10-2025 |
2
|
| 4. |
EED 02 : WG03 |
To review the comments on the document and provide P-draft for the revision of the IS 9078 : 1979 |
30-07-2025 |
31-10-2025 |
3
|
| 5. |
EED 02 : WG04 |
To review the received NWIPs i) Code of Practice for Control of Air Pollution from Plastic Waste to ULSD Production Industries. ii) Guidelines for Continuous Emission Monitoring System for Plastic Waste to ULSD Production. iii) Code of Practice for Control of Air Pollution from Plastic Waste Pyrolysis; and provide P-draft for the Standards |
30-07-2025 |
31-10-2025 |
5
|
| 6. |
EED 02 : WG05 |
: To review the received NWIP- Methodology for Carrying Capacity Assessment of Ambient Air - Assimilative Method and provide P-draft for the Standards. |
30-07-2025 |
31-10-2025 |
7
|
| 7. |
EED 02 : WG06 |
To review the received NWIP- Guidelines for Preparing of Air Quality Management Plan and provide P-draft for the Standards. |
30-07-2025 |
31-10-2025 |
6
|
| 8. |
EED 02 : WG07 |
To review the received NWIP- Code of Practice for Control of Air Pollution from Coal Based Thermal Power Plants and provide P-draft for the Standards. |
30-07-2025 |
31-10-2025 |
5
|
| 9. |
EED 04 : WG01 |
1. To study, examine and deliberate thoroughly on the existing literature, documents, data, information etc., available on the subject along with exploring the availability of the work being done by any organization/stakeholder in this reference.
2. To suggest the plan of action for development of the Indian Standard on the subject.
3. To provide a draft after following the decided plan of action for wide circulation.
4. Address the comments received on wide circulation, if any, and further till the document is published.
5. To monitor the BIS floated R&D associated with this subject. |
03-05-2023 |
04-12-2026 |
4
|
| 10. |
EED 05 : P5 : WG1 |
Preparation of a working draft on ‘Plastic Waste Processors – Service Requirements and Guidelines’ |
14-11-2023 |
24-12-2025 |
4
|
| 11. |
EED 06 : WG02 |
1. To study, examine and deliberate thoroughly on the existing literature, documents, data, information etc., available on the subject along with exploring the availability of the work being done by any organization/stakeholder in this reference.
2. To suggest the plan of action for development of the Indian Standard on the subject.
3. To provide a draft after following the decided plan of action for wide circulation.
4. Address the comments received on wide circulation, if any, and further till the document is published. |
04-07-2023 |
30-11-2027 |
8
|
| 12. |
EED 06 : WG03 |
1. To study, examine and deliberate thoroughly on the existing literature, documents, data, information etc., available on the subject along with exploring the availability of the work being done by any organization/stakeholder in this reference.
2. To suggest the plan of action for development of the Indian Standard on the subject.
3. To provide a draft after following the decided plan of action for wide circulation.
4. Address the comments received on wide circulation, if any, and further till the document is published. |
03-03-2024 |
03-12-2027 |
4
|
| 13. |
EED 06 : WG04 |
To Study and Develop Indigenous Indian Standard on Measurement of Diameter and Girth at Breast Height of a Tree |
20-06-2025 |
20-06-2026 |
3
|
| 14. |
EED 07 : WG01 |
To review and national adoption of the following ISO standards,
1. ISO 21929-1:2011 Sustainability in building construction — Sustainability indicators, Part 1: Framework for the development of indicators and a core set of indicators for buildings
2. ISO 21928-2:2023 Sustainability in buildings and civil engineering works — Sustainability indicators, Part 2: Framework for the development of indicators for civil engineering works |
25-08-2025 |
28-02-2026 |
7
|
| 15. |
EED 07 : WG02 |
• To review the New Work Item Proposal related to Green Office – Requirements and Guidelines,
• To provide a P-draft for developing an Indian Standard on the subject
• To review and provide recommendations on the comments to be received on the Wide Circulation document. |
25-08-2025 |
27-02-2026 |
9
|
| 16. |
EED 08 : WG01 |
1. To review and revise IS 10447 Guidelines for utilization and disposal of solid waste from integrated steel plants
2. To provide a draft, after thorough revision of the subject based on the available national/ international literature, standards, research papers etc., for wide circulation
3. Address the comments received on wide circulation, if any, and further till the document is published |
28-11-2024 |
30-11-2025 |
6
|
| 17. |
EED 08 : WG02 |
1. Development of Indian Standards on Management of domestic hazardous waste and sanitary waste- Guidelines
2. To provide a draft, after thorough revision of the subject based on the available national/ international literature, standards, research papers etc., for wide circulation
3. Address the comments received on wide circulation, if any, and further till the document is published |
14-08-2025 |
14-02-2026 |
4
|
| 18. |
EED 08 : WG03 |
1. Development of Indian Standards on Treatment and disposal of sewage sludge- Guidelines
2. To provide a draft, after thorough revision of the subject based on the available national/ international literature, standards, research papers etc., for wide circulation
3. Address the comments received on wide circulation, if any, and further till the document is published |
14-08-2025 |
14-02-2026 |
3
|
| 19. |
EED 08 : WG04 |
1. Development of Indian Standards on Waste audits including data collection templates for bulk waste generators - Guidelines
2. To provide a draft, after thorough revision of the subject based on the available national/ international literature, standards, research papers etc., for wide circulation
3. Address the comments received on wide circulation, if any, and further till the document is published |
14-08-2025 |
14-02-2026 |
2
|
| 20. |
EED 08 : WG05 |
1. Development of Indian Standards on Waste management guidelines for Hilly areas
2. To provide a draft, after thorough revision of the subject based on the available national/ international literature, standards, research papers etc., for wide circulation
3. Address the comments received on wide circulation, if any, and further till the document is published |
14-08-2025 |
14-02-2026 |
5
|
| 21. |
EED 08 : WG06 |
1. Development of Indian Standards on Waste management guidelines for coastal zones
2. To provide a draft, after thorough revision of the subject based on the available national/ international literature, standards, research papers etc., for wide circulation
3. Address the comments received on wide circulation, if any, and further till the document is published |
14-08-2025 |
14-02-2026 |
4
|
| 22. |
EED 08 : WG07 |
1. Development of Indian Standards on “Standard for Waste processing units”
2. To provide a draft, after thorough revision of the subject based on the available national/ international literature, standards, research papers etc., for wide circulation
3. Address the comments received on wide circulation, if any, and further till the document is published |
14-08-2025 |
14-02-2026 |
2
|
| 23. |
EED 09 : WG01 |
The proposed standard will address the transformation of the construction sector and related branches towards a circular economy. It will embrace the different observations of action (raw materials, construction products, and construction works) in the sector, as well as the difference in service lifetime for different construction products and construction works. |
08-08-2025 |
08-02-2026 |
4
|
| 24. |
EED 10 : WG01 |
To identify relevant organisation and experts, and advise the committee on co-option of such organisations and experts to sectional committee, and panels & working group under the committee. |
27-08-2025 |
27-01-2026 |
4
|