S No Group Number Scope of work Date of creation Time Frame No of Members
1. WRD 14 : P2 standardization of methodologies, design principles, and best practices for the planning, construction 03-03-2025 24-07-2030 0
2. WRD 14 : P3 standardization of methods, materials, and best practices for the design, construction, operation, and maintenance of water conductor systems, such as penstocks, tunnels, canals, and pipelines, ensuring efficient and reliable water conveyance for hydroelectric power generation 03-03-2025 19-06-2030 0