| 1. |
CED 03 : WG01 |
Preparing The Draft For Stainless Steel Water Storage Tanks, CED 03: P2/WG1 |
16-10-2024 |
16-04-2025 |
2
|
| 2. |
CED 03 : WG01 |
Preparing The Draft for CED 03: P3/WG1 Draft for Grease Separators, |
16-10-2024 |
16-04-2025 |
2
|
| 3. |
CED 03 : WG01 |
Preparing The Draft for CED 03: P5/ WG03-Working Group for Revision of IS 3042, |
16-10-2024 |
16-04-2025 |
1
|
| 4. |
CED 03 : WG01 |
|
- |
- |
2
|
| 5. |
CED 03 : WG01 |
|
- |
- |
2
|
| 6. |
CED 03 : WG01 |
|
- |
- |
2
|
| 7. |
CED 03 : WG02 |
Revision of IS 13983 |
11-02-2025 |
31-12-2025 |
4
|
| 8. |
CED 03 : WG02 |
Preparing The Draft for CED 03: P5 /WG02-Working Group for Revision of IS 14845 and IS 14846, CED 3:5/WG2 Working Group |
16-10-2024 |
16-04-2025 |
3
|
| 9. |
CED 03 : WG02 |
Preparing The Draft for CED 03: P1/WG 2 -Working Group for Revision of IS 1726, |
16-10-2024 |
16-04-2025 |
3
|
| 10. |
CED 03 : WG02 |
|
- |
- |
3
|
| 11. |
CED 03 : WG02 |
|
- |
- |
3
|
| 12. |
CED 03 : WG03 |
|
- |
- |
2
|
| 13. |
CED 03 : WG03 |
|
- |
- |
5
|
| 14. |
CED 03 : WG04 |
Preparing The Draft for CED 03: P1/ WG04-WG for IS for FRP Manhole Cover and Frames, Gratings and Steps for Manholes, |
16-10-2024 |
16-04-2025 |
2
|
| 15. |
CED 03 : WG04 |
|
- |
- |
2
|
| 16. |
CED 03 : WG05 |
Preparing The Draft for CED 03: P1/WG05-WG for IS for Ductile Iron Manhole Cover and Frames, Gratings and Steps for Manholes, CED 3:1/WG 5 Working Group |
16-10-2024 |
16-04-2025 |
4
|
| 17. |
CED 03 : WG05 |
|
- |
- |
3
|