S No Group Number Task Date of creation Time Frame No of Members
1. ETD 28 : WG02 To study and prepare report on floating solar PV plant standardization and prepare working drafts for the Floatovolatic systems. 04-04-2024 04-11-2024 8
2. ETD 28 : WG03 To prepare and maintain standard for the Systems, Tests, and Support Structure 11-12-2024 31-03-2026 6
3. ETD 28 : WG04 To prepare and maintain standards for the Modules, non concentrating 11-12-2024 31-03-2026 7
4. ETD 28 : WG05 To prepare and maintain standards for the Concentrator modules 11-12-2024 31-03-2026 4
5. ETD 28 : WG06 To prepare and maintain standards for the Renewable energy off grid systems, including access to electricity, rural electrification and hybrid 11-12-2024 31-03-2025 4
6. ETD 28 : WG07 To prepare and maintain standards for the Recycling of PV module - Sustainability in the area of Solar PV 11-12-2024 25-03-2025 7
7. ETD 28 : WG08 . 16-05-2025 16-05-2026 7
8. ETD 28 : WG9 . 16-05-2025 16-05-2026 4