Programme of work


BUREAU OF INDIAN STANDARDS


Civil Engineering Department

Programme of Work




CED43 : Soil And Foundation Engineering


  • Scope : Formulation of indian standards in the field of soil and soil engineering covering: i) Sub-surface exploration (other than river valley projects); ii) Soil sampling and testing including stabilzed soils; iii) Soil classification for engineering purposes; iv) Load bearing capacities of soils; and v) Ground improvement techniques. Standardization in the field of foundation engineering in particular design requirements and construction practices for various types of foundations and special load tests on foundations
  • Liaison :
    ISO/TC 182 - Geotechnics - Observer (O)

Published Standards

SI. No.
IS No.
Title
Reaffirmation Details
No. of Amendments
Degree of Equivalence
1.
IS 10042:1981
Reviewed In : 2021
Code of practice for site investigations for foundation in gravel - Boulder deposit
December, 2021
-
Indigenous
2.
IS 10074:2025
Compaction Mould Assembly for Light and Heavy Compaction Test of Soil � Specification (First Revision)
-
Indigenous
3.
IS 10077:2025
Equipment for Determination of Shrinkage Factors of Soils - Specification (First Revision)
-
Indigenous
4.
IS 10108:1982
Reviewed In : 2025
Decision taken to Reaffirm and Archive
Code of practice for sampling of soils by thin wall sampler with stationary piston
May, 2025
-
Indigenous
5.
IS 10270:1982
Reviewed In : 2023
Decision taken to Reaffirm and Archive
Guidelines for design and construction of prestressed rock anchors
November, 2023
2
Indigenous
6.
IS 10379:1982
Reviewed In : 2025
Decision taken to Reaffirm and Archive
Code of practice for field control of moisture and compaction of soils for embankment and subgrade
May, 2025
-
7.
IS 10442:2025
Earth-Augers Spiral Type - Specification (First Revision)
-
Indigenous
8.
IS 10589:1983
Reviewed In : 2025
Decision taken to Reaffirm and Archive
Specification for equipment for subsurface sounding of soils
May, 2025
1
Indigenous
9.
IS 1080:1985
Reviewed In : 2021
Code of practice for design and construction of shallow foundations in soils (Other Than Raft, Ring And Shell) (Second Revision)
December, 2021
-
Indigenous
10.
IS 10837:2025
Moulds and accessories for determination of density index (relative density) of cohesionless soils ? Specification (First Revision)
-
11.
IS 11089:1984
Reviewed In : 2021
Code of practice for design and construction of ring foundation
December, 2021
1
Indigenous
12.
IS 11196:2025
Equipment for Determination of Liquid Limit of Soils by Cone Penetration Method - Specification (First Revision)
-
Indigenous
13.
IS 11196:1985
Reviewed In : 2025
Specification for equipment for determination of liquid limit of soils cone penetration met - Hod
May, 2025
1
Indigenous
14.
IS 11209:2025
Determination of Permeability of Soils - Mould Assembly - Specification (First Revision)
-
Indigenous
15.
IS 11229:2025
Shear Box for Testing of Soils - Specification (First Revision)
-
Indigenous
16.
IS 11233:1985
Reviewed In : 2021
Code of practice for design and construction of radar antenna, microwave and TV tower foundations
December, 2021
-
17.
IS 11550:1985
Reviewed In : 2021
Code of practice for field instrumentation of swelling pressure in expansive soils
December, 2021
-
Indigenous
18.
IS 11593:2025
Shear Box (Large) for Testing of Soils ? Specification (First Revision)
-
19.
IS 11594:2025
Mild Steel Thin Walled Sampling Tubes and Sampler Heads ? Specification (First Revision)
-
Indigenous
20.
IS 11629:1986
Reviewed In : 2021
Code of practice for installation and operation of single point hydraulic over - Flow setting gauge
December, 2021
-
Indigenous
21.
IS 12023:1987
Reviewed In : 2025
Decision taken to Reaffirm and Archive
Code of Practice for Field Monitoring of Movement of Structures Using Tape Extensometer
May, 2025
-
22.
IS 12070:1987
Reviewed In : 2025
Decision taken to Reaffirm and Archive
Code of practice for design and construction of shallow foundations on rocks
May, 2025
2
Indigenous
23.
IS 12175:2025
Rapid Moisture Meter for Rapid Determination of Water Content of Soil � Specification ( First Revision )
-
Indigenous
24.
IS 12208:1987
Reviewed In : 2025
Decision taken to Reaffirm and Archive
Method for measurement of earth pressure by hydraulic pressure cell
May, 2025
-
Indigenous
25.
IS 12287:2025
Consolidometer for determination of consolidation properties of soil ? Specification (First Revision)
-
Indigenous
26.
IS 12979:2025
Mould for determination of linear shrinkage of soil � Specification (First Revision)
-
Indigenous
27.
IS 13094:2021
Selection of ground improvement techniques for foundation in weak soils - Guidelines (first revision)
-
Indigenous
28.
IS 13301:1992
Reviewed In : 2021
Vibration isolation for machine foundations - Guidelines
December, 2021
-
29.
IS 13468:2025
Apparatus for Determination of Dry Density of Soil by Core Cutter Method - Specification (First Revision)
-
30.
IS 14593:1998
Reviewed In : 2023
Decision taken to Reaffirm and Archive
Design and construction of bored cast-in-situ piles founded on rocks - Guidelines
November, 2023
1
31.
IS 14893:2021
Low strain non-destructive integrity testing of piles - Guidelines (first revision)
-
Indigenous
32.
IS 1498:1970
Reviewed In : 2021
Classification and identification of soils for general engineering purposes (First Revision)
December, 2021
2
Not Equivalent
33.
IS 15284 (Part 1):2003
Reviewed In : 2023
Design and construction for ground improvement - Guidelines: Part 1 stone columns
June, 2023
-
Indigenous
34.
IS 15284 (Part 2):2004
Reviewed In : 2025
Design and construction for ground improvement - Guidelines: Part 2 preconsolidation using vertical drains
May, 2025
-
Indigenous
35.
IS 1888:1982
Reviewed In : 2021
Method of load test on soils (Second Revision)
December, 2021
-
Indigenous
36.
IS 1892:2021
Subsurface investigation for foundations — Code of practice (second revision)
-
Indigenous
37.
IS 1904:2021
General requirements for design and construction of foundations in soils — Code of practice (fourth revision)
-
Indigenous
38.
IS 19117:2025
Design and construction of combined piled raft foundations - Code of practice
-
Indigenous
39.
IS 2131:2025
Standard Penetration Test of Soil - Method of Test
-
40.
IS 2132:1986
Reviewed In : 2021
Code of Practice for Thin-Walled Tube Sampling of Soils (Second Revision)
December, 2021
-
41.
IS 2720 (Part 1):1983
Reviewed In : 2025
Methods of test for soils: Part 1 preparation of dry soil samples for various tests (Second Revision)
May, 2025
-
Indigenous
42.
IS 2720 (Part 2):1973
Reviewed In : 2025
Methods of test for soils: Part 2 determination of water content (Second Revision)
May, 2025
1
Not Equivalent
43.
IS 2720 (Part 3/Sec 1):1980
Reviewed In : 2021
Methods of Test for Soils: Part 3 Determination of Specific Gravity: Section 1 Fine Grained Soils (First Revision)
December, 2021
-
44.
IS 2720 (Part 3/Sec 2):1980
Reviewed In : 2021
Methods of Test for Soils: Part 3 Determination of Specific Gravity: Section 2 Fine, Medium and Coarse Grained Soils (First Revision)
December, 2021
-
45.
IS 2720 (Part 4):1985
Reviewed In : 2025
Decision taken to Reaffirm and Archive
Methods of test for soils: Part 4 grain size analysis (Second Revision)
May, 2025
-
Not Equivalent
46.
IS 2720 (Part 5):1985
Reviewed In : 2025
Decision taken to Reaffirm and Archive
Methods of test for soils: Part 5 determination of liquid and plastic limit (Second Revision)
May, 2025
-
Not Equivalent
47.
IS 2720 (Part 6):1972
Reviewed In : 2021
Methods of test for soils: Part 6 determination of shrinkage factors (First Revision)
December, 2021
1
Indigenous
48.
IS 2720 (Part 7):1980
Reviewed In : 2021
Methods of test for soils: Part 7 determination of water content - Dry density relation using light compaction (Second Revision)
December, 2021
2
Indigenous
49.
IS 2720 (Part 8):1983
Reviewed In : 2025
Decision taken to Reaffirm and Archive
Methods of test for soils: Part 8 determination of water content - Dry density relation using heavy compaction (Second Revision)
May, 2025
-
Indigenous
50.
IS 2720 (Part 9):1992
Reviewed In : 2021
Methods of test for soils: Part 9 determination of dry density - Moisture content relation by constant mass of soil method (First Revision)
December, 2021
-
Indigenous
51.
IS 2720 (Part 10):1991
Reviewed In : 2025
Decision taken to Reaffirm and Archive
Methods of test for soils: Part 10 determination of unconfined compressive strength (Second Revision)
May, 2025
-
Not Equivalent
52.
IS 2720 (Part 11):1993
Reviewed In : 2021
Methods of test for soils: Part 11 determination of the shear strength parameters of a specimen tested in unconsolidated undrained triaxial compression without the measurement of pore water pressure (First Revision)
December, 2021
-
Not Equivalent
53.
IS 2720 (Part 12):1981
Reviewed In : 2021
Methods of test for soils: Part 12 determination of shear strength parameters of soil from consolidated undrained triaxial compression test with measurement of pore water pressure (First Revision)
December, 2021
-
Not Equivalent
54.
IS 2720 (Part 13):1986
Reviewed In : 2021
Methods of test for soils: Part 13 Direct shear test
December, 2021
1
55.
IS 2720 (Part 14):1983
Reviewed In : 2025
Decision taken to Reaffirm and Archive
Methods of test for soils: Part 14 determination of density index (Relative Density) of cohesionless soils (First Revision)
May, 2025
-
Indigenous
56.
IS 2720 (Part 15):1965
Reviewed In : 2021
Methods of test for soils: Part 15 determination of consolidation properties (First Revision)
December, 2021
-
Indigenous
57.
IS 2720 (Part 16):1987
Reviewed In : 2021
Methods of test for soils: Part 16 laboratory determination of cbr (Second Revision)
December, 2021
-
Indigenous
58.
IS 2720 (Part 17):1986
Reviewed In : 2021
Methods of test for soils: Part 17 laboratory determination of permeability (First Revision)
December, 2021
-
Not Equivalent
59.
IS 2720 (Part 18):1992
Reviewed In : 2021
Methods of test for soils: Part 18 determination of field moisture equivalent (First Revision)
December, 2021
-
Indigenous
60.
IS 2720 (Part 19):1992
Reviewed In : 2021
Methods of test for soils: Part 19 determination of centrifuge moisture equivalent (First Revision)
December, 2021
-
Indigenous
61.
IS 2720 (Part 20):1992
Reviewed In : 2021
Methods of test for soils: Part 20 determination of linear shrinkage (First Revision)
December, 2021
-
Indigenous
62.
IS 2720 (Part 21):1977
Reviewed In : 2025
Decision taken to Reaffirm and Archive
Methods of test for soils: Part 21 determination of total soluble solids (First Revision)
May, 2025
1
Indigenous
63.
IS 2720 (Part 22):1972
Reviewed In : 2025
Decision taken to Reaffirm and Archive
Methods of test for soils: Part 22 determination of organic matter (First Revision)
May, 2025
1
Indigenous
64.
IS 2720 (Part 23):1976
Reviewed In : 2025
Decision taken to Reaffirm and Archive
Methods of test for soils: Part 23 Determination of calcium carbonate
May, 2025
-
65.
IS 2720 (Part 24):1976
Reviewed In : 2025
Decision taken to Reaffirm and Archive
Methods of test for soils: Part 24 determination of cation exchange capacity (First Revision)
May, 2025
1
Not Equivalent
66.
IS 2720 (Part 25):1982
Reviewed In : 2025
Decision taken to Reaffirm and Archive
Methods of test for soils: Part 25 determination silica sesquioxide ratio (First Revision)
May, 2025
-
Indigenous
67.
IS 2720 (Part 26):1987
Reviewed In : 2021
Method of test for soils: Part 26 determination of pH value (Second Revision)
December, 2021
-
Not Equivalent
68.
IS 2720 (Part 27):1977
Reviewed In : 2025
Decision taken to Reaffirm and Archive
Methods of test for soils: Part 27 determination of total soluble sulphates (First Revision)
May, 2025
-
Not Equivalent
69.
IS 2720 (Part 28):1974
Reviewed In : 2025
Decision taken to Reaffirm and Archive
Methods of test for soils: Part 28 determination of dry density of soils, in - Place, by the sand replacement method (First Revision)
May, 2025
1
Not Equivalent
70.
IS 2720 (Part 29):1975
Reviewed In : 2025
Decision taken to Reaffirm and Archive
Methods of test for soils: Part 29 determination of dry density of soils in - Place by the core - Cutter method (First Revision)
May, 2025
-
Not Equivalent
71.
IS 2720 (Part 30):1980
Reviewed In : 2021
Methods of test for soils: Part 30 Laboratory vane shear test
December, 2021
1
72.
IS 2720 (Part 31):1990
Reviewed In : 2025
Decision taken to Reaffirm and Archive
Methods of Test for soils: Part 31 Field Determination of California Bearing Ratio (First Revision)
May, 2025
-
73.
IS 2720 (Part 33):1971
Reviewed In : 2025
Decision taken to Reaffirm and Archive
Methods of test for soils: Part 33 Determination of the density in place by the ring and water replacement method
May, 2025
1
74.
IS 2720 (Part 34):1972
Reviewed In : 2025
Decision taken to Reaffirm and Archive
Methods of test for soils: Part 34 Determination of density of soil in-place by rubber-balloon method
May, 2025
1
75.
IS 2720 (Part 35):1974
Reviewed In : 2025
Decision taken to Reaffirm and Archive
Methods of test for soils: Part 35 Measurement of negative pore water pressure
May, 2025
-
76.
IS 2720 (Part 36):1987
Reviewed In : 2021
Methods of Test for Soils: Part 36 Laboratory Determination of Permeability of Granular Soils (Constant Head) (First Revision)
December, 2021
-
77.
IS 2720 (Part 37):1976
Reviewed In : 2021
Methods of test for soils: Part 37 Determination of sand equivalent values of soils and fine aggregates
December, 2021
-
78.
IS 2720 (Part 38):1976
Reviewed In : 2021
Methods of test for soils: Part 38 Compaction control test (Hilf method)
December, 2021
-
79.
IS 2720 (Part 39/Sec 1):1977
Reviewed In : 2021
Methods of test for soils: Part 39 Direct shear test for soils containing gravel, Section 1 Laboratory test
December, 2021
2
80.
IS 2720 (Part 39/Sec 2):1979
Reviewed In : 2021
Methods of test for soils: Part 39 Direct shear test for soils containing gravel, Section 2 In-situ shear test
December, 2021
-
81.
IS 2720 (Part 40):1977
Reviewed In : 2021
Methods of test for soils: Part 40 determination of free swell index of soils
December, 2021
-
Indigenous
82.
IS 2720 (Part 41):1977
Reviewed In : 2021
Methods of test for soils: Part 41 measurement of swelling pressure of soils
December, 2021
-
Indigenous
83.
IS 2809:1972
Reviewed In : 2025
Decision taken to Reaffirm and Archive
Glossary of terms and symbols relating to soil engineering (First Revision)
May, 2025
-
Indigenous
84.
IS 2810:1979
Reviewed In : 2021
Glossary of terms relating to soil dynamics (First Revision)
December, 2021
-
Indigenous
85.
IS 2911 (Part 1/Sec 1):2010
Reviewed In : 2025
Decision taken to Reaffirm and Archive
Design and construction of pile foundations - Code of practice: Part 1 concrete piles: Sec 1 driven cast in-situ concrete piles (Second Revision)
May, 2025
-
Indigenous
86.
IS 2911 (Part 1/Sec 2):2010
Reviewed In : 2025
Decision taken to Reaffirm and Archive
Design and construction of pile foundations - Code of practice: Part 1 concrete piles: Sec 2 bored cast in-situ concrete piles (Second Revision)
May, 2025
-
Indigenous
87.
IS 2911 (Part 1/Sec 3):2010
Reviewed In : 2025
Decision taken to Reaffirm and Archive
Design and Construction of Pile Foundations — Code Of Practice Part 1 Concrete Piles: Section 3 Driven Precast Concrete Piles (Second Revision)
May, 2025
-
88.
IS 2911 (Part 1/Sec 4):2010
Reviewed In : 2025
Decision taken to Reaffirm and Archive
Design and construction of pile foundations - Code of practice: Part 1 concrete piles: Sec 4 precast concrete piles in prebored holes (First Revision)
May, 2025
-
Indigenous
89.
IS 2911 (Part 2):2021
Design and construction of pile foundation - Code of practice: Part 2 Timber piles (second revision)
-
Indigenous
90.
IS 2911 (Part 3):2021
Design and construction of pile foundations - Code of practice: Part 3 Under-reamed piles (second revision)
-
Indigenous
91.
IS 2911 (Part 4):2013
Reviewed In : 2023
Decision taken to Reaffirm and Archive
Design and construction of pile foundations - Code of practice: Part 4 load test on piles (Second Revision)
November, 2023
-
Not Equivalent
92.
IS 2950 (Part 1):1981
Reviewed In : 2023
Decision taken to Reaffirm and Archive
Code of practice for design and construction of raft foundations: Part 1 design (Second Revision)
November, 2023
1
Indigenous
93.
IS 2974 (Part 1):1982
Reviewed In : 2023
Code of practice for design and construction of machine foundations: Part 1 foundation for reciprocating type machines (Second Revision)
November, 2023
1
Indigenous
94.
IS 2974 (Part 2):1980
Reviewed In : 2023
Code of pracrrIce for design and construction of machine foundations: Part 2 foundations for impact type machines (Hammer Foundations) (First Revision)
November, 2023
1
Indigenous
95.
IS 2974 (Part 3):1992
Reviewed In : 2025
Code of practice for design and construction of machine foundations: Part 3 Foundations for rotary type machines (Medium and high frequency)
May, 2025
-
96.
IS 2974 (Part 4):1979
Reviewed In : 2025
Code of practice for design and construction of machine foundations: Part 4 foundations for rotary type machines of low frequency
May, 2025
1
Indigenous
97.
IS 2974 (Part 5):1987
Reviewed In : 2023
Code of practice for design and construction of machine foundations: Part 5 foundations for impact machines other than hammer (Forging and stamping press, pig breaker, drop crusher and jolter) (First Revision)
November, 2023
-
Indigenous
98.
SP 36-1:1987
Compendium of Indian Standards on Soil Engineering: Part-1 LaboratoryTesting of Soils for civil Engineering Purposes
-
99.
SP 36-2:1988
Compendium of Indian Standards on Soil Engineering: Part-2 Field Testing of Soils For Civil Engineering Purposes
-
100.
IS 4091:1979
Reviewed In : 2025
Code of practice for design and construction of foundations for transmission line towers and poles (First Revision)
May, 2025
-
Indigenous
101.
IS 4332 (Part 1):1967
Reviewed In : 2025
Decision taken to Reaffirm and Archive
Methods of test for stabilized soils: Part 1 Method of sampling and preparation of stabilized soils for testing
May, 2025
1
102.
IS 4332 (Part 2):1967
Reviewed In : 2025
Decision taken to Reaffirm and Archive
Methods of test for stabilized soils: Part 2 Determination of moisture content of stabilized soil mixtures
May, 2025
1
Indigenous
103.
IS 4332 (Part 3):1967
Reviewed In : 2025
Decision taken to Reaffirm and Archive
Methods of test for stabilized soils: Part 3 Test for determination of moisture content-dry density relation for stablized soil mixtures
May, 2025
1
104.
IS 4332 (Part 4):1968
Reviewed In : 2025
Decision taken to Reaffirm and Archive
Methods of test for stabilized soils: Part 4 Wetting and drying, and freezing and thawing tests for compacted soil-cement mixtures
May, 2025
1
105.
IS 4332 (Part 5):1970
Reviewed In : 2025
Decision taken to Reaffirm and Archive
Methods of test for stabilizd soils: Part 5 Determination of unconfined compressive strength of stablized soils
May, 2025
-
106.
IS 4332 (Part 6):1972
Reviewed In : 2025
Decision taken to Reaffirm and Archive
Methods of test for stabilized soils: Part 6 Flexural strength of soil-cement using simple beam with third-point loading
May, 2025
1
107.
IS 4332 (Part 7):1973
Reviewed In : 2025
Decision taken to Reaffirm and Archive
Methods of test for stabilized soils: Part 7 Determination of cement content of cement stabilized soils
May, 2025
1
108.
IS 4332 (Part 8):1969
Reviewed In : 2025
Decision taken to Reaffirm and Archive
Methods of test for stablized soils: Part 8 Determination of lime content of lime stablized soils
May, 2025
1
109.
IS 4332 (Part 9):1970
Reviewed In : 2025
Decision taken to Reaffirm and Archive
Methods of test for stabilized soils: Part 9 Determination of the bituminous stabilizer content of bitumen and tar stabilized soils
May, 2025
1
110.
IS 4332 (Part 10):1969
Reviewed In : 2025
Decision taken to Reaffirm and Archive
Methods of test for stabilized soils: Part 10 Test for soil-bituminous mixtures
May, 2025
1
111.
IS 4434:1978
Reviewed In : 2021
Code Of Practice For In-situ Vane Shear Test For Soils
December, 2021
-
112.
IS 4968 (Part 1):1976
Reviewed In : 2021
Method for subsurface sounding for soils: Part 1 dynamic method using 50 mm cone without bentonite slurry (First Revision)
December, 2021
2
Not Equivalent
113.
IS 4968 (Part 2):1976
Reviewed In : 2021
Method for subsurface sounding for soils: Part 2 dynamic method using cone and bentonite slurry (First Revision)
December, 2021
2
Not Equivalent
114.
IS 4968 (Part 3):1976
Reviewed In : 2021
Method for subsurface sounding for soils: Part 3 Static cone penetration test
December, 2021
-
115.
IS 5249:1992
Reviewed In : 2025
Decision taken to Reaffirm and Archive
Determination of dynamic properties of soil - Method of test (Second Revision)
May, 2025
1
Indigenous
116.
IS 6403:1981
Reviewed In : 2021
Code of practice for determination of bearing capacity of shallow foundations
December, 2021
2
117.
IS 8009 (Part 1):1976
Reviewed In : 2023
Decision taken to Reaffirm and Archive
Code of practice for calculation of settlements of foundations: Part 1 shallow foundations subjected to symmetrical static vertical loads
November, 2023
3
Indigenous
118.
IS 8009 (Part 2):1980
Reviewed In : 2025
Decision taken to Reaffirm and Archive
Code of practice for calculation of settlement of foundations: Part 2 deep foundations subjected to symmetrical static vertical loading z
May, 2025
1
Indigenous
119.
IS 8763:1978
Reviewed In : 2021
Guide for undistrubed sampling of sands
December, 2021
-
120.
IS 9198:2025
Compaction Rammers for Soil Testing � Specification (First Revision)
-
Indigenous
121.
IS 9214:1979
Reviewed In : 2021
Method of determination of modulus of subgrade reaction (K - Value) of soils in field
December, 2021
1
Indigenous
122.
IS 9259:2025
Casagrande Apparatus for Determination of Liquid Limit of Soils by Impact Method - Specification (First Revision)
-
Indigenous
123.
IS 9456:1980
Reviewed In : 2023
Decision taken to Reaffirm and Archive
Code of practice for design and construction of conical and hyperbolic paraboloidal types of shell foundations
November, 2023
1
Indigenous
124.
IS 9556:1980
Reviewed In : 2023
Decision taken to Reaffirm and Archive
Code of practice for design and construction of diaphragm walls
November, 2023
1
Indigenous
125.
IS 9640:2025
Split spoon sampler for standard penetration test of soil ? Specification (First Revision)
-
Indigenous
126.
IS 9669:2025
CBR Mould and Its Accessories - Specification (First Revision)
-
Indigenous
127.
IS 9716:1981
Reviewed In : 2021
Guide for lateral dynamic load test on piles
November, 2021
-
Indigenous
128.
IS 9759:1981
Reviewed In : 2021
Guidelines for dewatering during construction
November, 2021
1
Indigenous

Standards Under Develpoment

Projects Approved

SI. No.
Doc No
TITLE
No Records Found

Preliminary Draft Standards

SI. No.
Doc No
TITLE
No Records Found

Drafts Standards in WC Stage

SI. No.
Doc No
TITLE
No Records Found

Draft Standards Completed WC Stage

SI. No.
Doc No
TITLE
1
CED 43 (24470)
Revision of: IS 15284:2003
Design and Construction for Ground Improvement Code of Practice Part 1 Stone Columns
2
CED 43 (24471)
Revision of: IS 15284:2004
Design and Construction for Ground Improvement - Code of Practice Part 2 Preconsolidation Using Vertical Drains
3
CED 43 (26407)
Revision of: IS 2720:1983
Soils Methods of Test Part 1 Preparation of Dry Soil Samples for Various Tests
4
CED 43 (26408)
Revision of: IS 2720:1973
Soils Methods of Test Part 2 Determination of Water Content
5
CED 43 (26411)
Revision of: IS 4091:1979
Design and Construction of Foundations for Transmission Line Towers and Poles Code of Practice Second revision of IS 4091
6
CED 43 (26416)
Revision of: IS 11233:1985
Design and Construction of Foundations for Radar and Satellite Tracking Antennas and Microwave Mobile and Television Towers Code of Practice First Revision

Finalized Draft Indian Standard

SI. No.
Doc No
TITLE
No Records Found

Finalized Draft Indian Standards under Print

SI. No.
Doc No
TITLE
1
CED 43 (26424)

Revision of: IS 2974:1982
Design and Construction of Machine Foundations Code of Practice Part 1 General Provisions Third Revision
2
CED 43 (26425)

Revision of: IS 2974:1980
Design and Construction of Machine Foundations Code of Practice Part 2 Block Foundations Second Revision
3
CED 43 (26426)

Revision of: IS 2974:1992
Design and Construction of Machine Foundations Code of Practice Part 3 Frame Foundations First Revision
4
CED 43 (26427)

Revision of: IS 2974:1979
Design and Construction of Machine Foundations Code of Practice Part 4 Foundations for Hammers and Presses Second Revision


Aspect Wise Report

 
 Product:   18
 Code of Practices :    39
 Methods of Test :   58
 Terminology :   2
 Dimensions :   0
 System Standard :   0
 Safety Standard :   0
 Others :    10
 Service Specification :    0
 Process Specification :    0
 Unclassified :    0
 


Annexure-I :List of Indian Standards Withdrawn/Superseded

SI. No.
IS No.
Title
1.
IS 3955:1967
Reviewed In : 2005
Code of practice for design and construction of well foundations


Annexure-II :List of Indian Product Standards

SI. No.
IS No. & Year
Title
1.
IS 10074:2025
Compaction Mould Assembly for Light and Heavy Compaction Test of Soil Specification First Revision
2.
IS 10077:2025
Equipment for Determination of Shrinkage Factors of Soils - Specification First Revision
3.
IS 10442:2025
Earth-Augers Spiral Type - Specification First Revision
4.
IS 10589:1983
Reviewed In : 2025
Decision taken to Reaffirm and Archive
Specification for equipment for subsurface sounding of soils
5.
IS 10837:2025
Moulds and accessories for determination of density index relative density of cohesionless soils Specification First Revision
6.
IS 11196:2025
Equipment for Determination of Liquid Limit of Soils by Cone Penetration Method - Specification First Revision
7.
IS 11209:2025
Determination of Permeability of Soils - Mould Assembly - Specification First Revision
8.
IS 11229:2025
Shear Box for Testing of Soils - Specification First Revision
9.
IS 11593:2025
Shear Box Large for Testing of Soils Specification First Revision
10.
IS 11594:2025
Mild Steel Thin Walled Sampling Tubes and Sampler Heads Specification First Revision
11.
IS 12175:2025
Rapid Moisture Meter for Rapid Determination of Water Content of Soil Specification First Revision
12.
IS 12287:2025
Consolidometer for determination of consolidation properties of soil Specification First Revision
13.
IS 12979:2025
Mould for determination of linear shrinkage of soil Specification First Revision
14.
IS 13468:2025
Apparatus for Determination of Dry Density of Soil by Core Cutter Method - Specification First Revision
15.
IS 9198:2025
Compaction Rammers for Soil Testing Specification First Revision
16.
IS 9259:2025
Casagrande Apparatus for Determination of Liquid Limit of Soils by Impact Method - Specification First Revision
17.
IS 9640:2025
Split spoon sampler for standard penetration test of soil Specification First Revision
18.
IS 9669:2025
CBR Mould and Its Accessories - Specification First Revision