
BUREAU OF INDIAN STANDARDS
Programme of Work
WRD13 : Canals And Cross Drainage Works
- Scope : Standardization of criteria for planning, location, design, construction, inspection, maintenance and other related aspects for canals and cross drainage works.
-
Liaison :
IS 10430:2000 Reviewed In : 2024 |
Criteria for design of lined canals and guidance for selection of type of lining (First Revision)
|
September, 2024
|
1
|
Indigenous
|
|
IS 10646:1991 Reviewed In : 2024 Reaffirmed but not taken up for revision |
Canal linings - Cementconcrete tiles - Specification (First Revision)
|
September, 2024
|
3
|
Indigenous
|
|
IS 11570:1985 Reviewed In : 2024 |
Criteriafor hydraulic design of irrigation intake structures
|
March, 2024
|
1
|
Indigenous
|
|
IS 11809:1994 Reviewed In : 2024 Reaffirmed but not taken up for revision |
Lining for canals by stone masonry - Code of practice (First Revision)
|
September, 2024
|
2
|
Indigenous
|
|
IS 12331:1988 Reviewed In : 2022 |
General requirements for canal outlets
|
August, 2022
|
1
|
Indigenous
|
|
IS 12379:1988 Reviewed In : 2022 |
Code of practice for lining of water - Courses and field channels
|
August, 2022
|
2
|
Indigenous
|
|
IS 13143:1991 Reviewed In : 2024 |
Jointsin concreteliningofcanals - Sealing compound - Specification
|
March, 2024
|
-
|
Indigenous
|
|
IS 16238:2017 Reviewed In : 2022 |
Planning of parallel canals - Guidelines
|
April, 2022
|
-
|
Indigenous
|
|
IS 16472:2016 Reviewed In : 2021 |
Design and construction of water courses - Guidelines
|
February, 2021
|
-
|
Indigenous
|
|
IS 3872:2002 Reviewed In : 2022 |
Lining of canals with burnt clay tiles - Code of practice (First Revision)
|
August, 2022
|
1
|
Indigenous
|
|
IS 3873:1993 Reviewed In : 2024 |
Laying .cement concrete/stone slab lining on canals - Code of practice (Second Revision)
|
September, 2024
|
1
|
Indigenous
|
|
IS 4410 (Part 5):2023 |
GLOSSARY OF TERMS RELATING TO RIVER VALLEY PROJECTS PART 5 CANALS (Second Revision)
|
-
|
Indigenous
|
||
IS 4410 (Part 15/Sec 1):2023 |
GLOSSARY OF TERMS RELATING TO RIVER VALLEY PROJECTS PART 15 CANAL STRUCTURES Section 1 General Terms
|
-
|
Indigenous
|
||
IS 4410 (Part 15/Sec 2):2023 |
GLOSSARY OF TERMS RELATING TO RIVER VALLEY PROJECTS PART 15 CANAL STRUCTURES Section 2 Transitions
|
-
|
Indigenous
|
||
IS 4410 (Part 15/Sec 3):1977 Reviewed In : 2025 Reaffirmed but not taken up for revision |
Glossary of terms relating to river valley projects: Part 15 canal structures: Sec 3 flume.
|
March, 2025
|
-
|
Indigenous
|
|
IS 4410 (Part 15/Sec 4):1977 Reviewed In : 2025 |
Glossary of terms relating to river valley projects: Part 15 canal structures: Sec 4 regulating works
|
March, 2025
|
-
|
Indigenous
|
|
IS 4410 (Part 15/Sec 5):2023 |
GLOSSARY OF TERMS RELATING TO RIVER VALLEY PROJECTS PART 15 CANAL STRUCTURES Section 5 Cross-Drainage Works
|
-
|
Indigenous
|
||
IS 4515:2002 Reviewed In : 2022 |
Stone pitched lining for canals - Code of practice (Second Revision)
|
August, 2022
|
-
|
Indigenous
|
|
IS 4558:1995 Reviewed In : 2021 |
Under - Drainage of lined canals - Code of practice (Second Revision)
|
February, 2021
|
1
|
Indigenous
|
|
IS 4701:1982 Reviewed In : 2024 |
Code of practice for earthwork on canals (First Revision
|
September, 2024
|
-
|
Indigenous
|
|
IS 4839 (Part 1):1992 Reviewed In : 2022 |
Maintenance of canals code of practice: Part 1 unlined canals (Second Revision)
|
August, 2022
|
1
|
Indigenous
|
|
IS 4839 (Part 2):1992 Reviewed In : 2021 |
Maintenance of canals - Codb of practice: Part 2 lined canals (Second Revision)
|
February, 2021
|
1
|
Indigenous
|
|
IS 4839 (Part 3):1992 Reviewed In : 2022 |
Code of practice for maintenance of canals: Part 3 canal structures, drains, outlets, jungle, clearance, plantation and regulation f second revision)
|
August, 2022
|
1
|
Indigenous
|
|
IS 5256:1992 Reviewed In : 2022 |
Sealing expansion joints in concrete lining of canals - Code of practice (First Revision)
|
August, 2022
|
-
|
Indigenous
|
|
IS 5690:1982 Reviewed In : 2024 Reaffirmed but not taken up for revision |
Guide for laying combination lining for existing unlined canals (First Revision)
|
September, 2024
|
1
|
Indigenous
|
|
IS 5968:1987 Reviewed In : 2022 |
Guide for planning and layout of canal system for krrlGatlOn (First Revision)
|
August, 2022
|
-
|
Indigenous
|
|
IS 6004:1980 Reviewed In : 2024 Reaffirmed but not taken up for revision |
Criteria for hydraulic design of sediment ejector for irrigation and power channels (First Revision)
|
September, 2024
|
-
|
Indigenous
|
|
IS 6522:1972 Reviewed In : 2024 Reaffirmed but not taken up for revision |
Criteria for design of silt vanes for sediment control in offtaking canals
|
September, 2024
|
-
|
Indigenous
|
|
IS 6531:2021 |
Canal head regulators criteria for design Second Revision
|
-
|
Indigenous
|
||
IS 6936:1992 Reviewed In : 2022 |
Guide for location, selection and hydraulic design of canal escapes (First Revision)
|
August, 2022
|
-
|
Indigenous
|
|
IS 7112:2002 Reviewed In : 2022 |
Criteria for design of cross -: Sec for unlined canals in alluvial soil (First Revision)
|
August, 2022
|
-
|
Indigenous
|
|
IS 7113:2003 Reviewed In : 2022 |
Soil - Cement lining for canals - Code of practice (First Revision)
|
August, 2022
|
1
|
Indigenous
|
|
IS 7114:1973 Reviewed In : 2024 Reaffirmed but not taken up for revision |
Criteria for hydraulic destgn of cross regulators for canals
|
September, 2024
|
-
|
Indigenous
|
|
IS 7331:1981 Reviewed In : 2022 |
Code of practice for inspbction and maintenance of cross drainage works (First Revision)
|
August, 2022
|
-
|
Indigenous
|
|
IS 7495:1974 Reviewed In : 2024 Reaffirmed but not taken up for revision |
Criteria for hydraulic design of silt selective head regulator for sediment control in offtaking canals
|
August, 2024
|
-
|
Indigenous
|
|
IS 7784 (Part 1):2013 Reviewed In : 2024 |
Design of cross drainage works - Code of practice: Part 1 general features (Second Revision)
|
September, 2024
|
-
|
Indigenous
|
|
IS 7784 (Part 2/Sec 1):1995 Reviewed In : 2025 Reaffirmed but not taken up for revision |
Design of cross drainage works code of practice: Part 2 specific requirements: Sec 1 aqueducts (First Revision J
|
March, 2025
|
-
|
Indigenous
|
|
IS 7784 (Part 2/Sec 2):2000 Reviewed In : 2024 |
Code of practice for design of cross drainage works: Part 2 specific requirements: Sec 2 superpassages (First Revision)
|
September, 2024
|
1
|
Indigenous
|
|
IS 7784 (Part 2/Sec 3):1996 Reviewed In : 2021 |
Code of practice for design of cross drainage works: Part 2 specific requirements: Sec 3 canal slrphons (First Revision)
|
February, 2021
|
-
|
Indigenous
|
|
IS 7784 (Part 2/Sec 4):1999 Reviewed In : 2024 Reaffirmed but not taken up for revision |
Design of cross drainage works - Code of practice: Part 2 specific requirements: Sec 4 level crossings (First Revision)
|
August, 2024
|
-
|
Indigenous
|
|
IS 7784 (Part 2/Sec 5):2000 Reviewed In : 2024 |
Code of practice for design of cross drainage works part2 specific requirements: Sec 5 syphon aqueducts (First Revision)
|
September, 2024
|
1
|
Indigenous
|
|
IS 7871:1975 Reviewed In : 2024 |
Criteria for hydraulic design of groyne walls (Curved Wing) for sediment distribution at offtake points in a canal
|
March, 2024
|
-
|
Indigenous
|
|
IS 7873:1975 Reviewed In : 2024 Decision taken to Reaffirm and Archive |
Code of practice for limb concrete lining for canals
|
March, 2024
|
1
|
Indigenous
|
|
IS 7880:1975 Reviewed In : 2024 Reaffirmed but not taken up for revision |
Criteria for hydraulic design qf skimming platform for sediment control in offtaking canal
|
September, 2024
|
-
|
Indigenous
|
|
IS 7986:1976 Reviewed In : 2024 Reaffirmed but not taken up for revision |
Code of practice for canal outlets
|
September, 2024
|
1
|
Indigenous
|
|
IS 8835:1978 Reviewed In : 2024 Reaffirmed but not taken up for revision |
Guidelines for planning and design of surface drains
|
September, 2024
|
-
|
Indigenous
|
|
IS 9097:1979 Reviewed In : 2024 |
Guide for laying lining of canals with hot bitumen or bituminous felts
|
March, 2024
|
-
|
Indigenous
|
|
IS 9447:2023 |
Assessment of Seepage Losses in Canals by Analytical method- Guidelines ( first revision)
|
-
|
Indigenous
|
||
IS 9451:2022 |
Guidelines for Lining of Canals in Expansive Soils Third Revision
|
-
|
Indigenous
|
||
IS 9452 (Part 1):1993 Reviewed In : 2024 |
Measurement of seepage losses from canals - Code of practice: Part 1 Ponding method
|
March, 2024
|
-
|
Indigenous
|
|
IS 9452 (Part 2):1980 Reviewed In : 2024 |
Code of practice for measurement of seepage losses from canals: Part 2 inflow - O - utflow method
|
March, 2024
|
-
|
Indigenous
|
|
IS 9452 (Part 3):1988 Reviewed In : 2024 |
Code of practice for measurement of seepage losses from canals: Part 3 seepage meter method
|
March, 2024
|
-
|
Indigenous
|
|
IS 9698:1995 Reviewed In : 2025 Reaffirmed but not taken up for revision |
Lining of canals with polyethylene film - Code of practice (First Revision)
|
March, 2025
|
1
|
Indigenous
|
|
IS 9913:2000 Reviewed In : 2024 |
Code of practice for construction of cross drainage works (First Revision)
|
September, 2024
|
1
|
Indigenous
|
No Records Found |
WRD 13 (24526)
Revision of: IS 4558:1995 |
UNDER-DRAINAGE OF LINED CANALS - CODE OF PRACTICE |
WRD 13 (24522) Revision of: IS 3873:1993 |
LAYING OF CEMENT CONCRETE AND STONE SLABS LINING IN CANALS CODE OF PRACTICE Third Revision of IS 3873 |
|
WRD 13 (24576) Revision of: IS 4701:1982 |
EARTHWORK ON CANALS CODE OF PRACTICE Second Revision of IS 4701 |
No Records Found |
No Records Found |
No Records Found |
|
IS 3860:1966 Reviewed In : 2003 |
Precast Cement Concreat Slabs for Cannal Lining |
|
IS 4745:1968 |
Code of Practice for Design of Cross-section of Lined Canals |
|
IS 4969:1968 |
Method of Test for Detemining Flexural Strength of Precast Cement Concrete Slabs for Canal Lining |
|
IS 5331:1969 |
Guide for Selection of Type of Lining for Canals |
IS 10646:1991 Reviewed In : 2024 Reaffirmed but not taken up for revision |
Canal linings - Cementconcrete tiles - Specification First Revision |
|
IS 13143:1991 Reviewed In : 2024 |
Jointsin concreteliningofcanals - Sealing compound - Specification |