Indian Standard Details

    Print

IS Number : IS/IEC 60947-3 : 2012
IEC 60947-3 : 2012
Reviewed In : 2018
IS Title [Eng-Hn] : Low - Voltage switchgear and controlgear: Part 3 switches, disconnectors, switch disconnectors and fuse - Combination units (First Revision)
No of Revision : 1
No of Amendments : 0
Technical Department : Electrotechnical Department
Technical Committee : ETD 7 ( Low Voltage Switchgear And Controlgear )
Language : English

Group : Electrical Switchgear and Other Electrical Products/Accessories
Sub Group: Switchgear, Metering and Accessories
Sub Sub Group : Circuit breakers, switches and disconnectors
Aspects: Product Specification
Certification:
Ministry :
Short Commom Man's Title:
Itchs:
Degree of Equivalence: Identical under single numbering
Identical/Equivalent Standards:IEC 60947-3 : 2020
Organisation :

Indian Standards Refered In IS IS/IEC 60947 : PART 3 : 2012 :
SNo IS Number Title Technical Committee
1
IS 1885 : Part 17 : 1979 Electrotechnical vocabulary: Part 17 switchgear and control gear (First Revision) ETD 1
2
IS/IEC 60695 : Part 2 : Sec 11 : 2014 Fire Hazard Testing Part 2-11 Glowing / Hot-Wire Based Test Methods Glow-Wire Flammability Test Method for End-Products ( GWEPT ) LITD 1
3
IS/IEC 60947 : PART 1 : 2020 LOW-VOLTAGE SWITCHGEAR AND CONTROLGEAR PART 1 GENERAL RULES ETD 7
4
IS 14700 : Part 4 : Sec 2 : 2018 Electromagnetic compatibility (EMC): Part 4 testing and measurement techniques: Sec 2 electrostatic discharge immunity test (Second Revision) LITD 9
5
IS 14700 : Part 4 : Sec 3 : 2018 Electromagnetic Compatibility (EMC) Part 4 Testing and Measurement Techniques Section 24 Test methods for protective devices for HEMP conducted disturbance ( First Revision ) LITD 9
6
IS 14700 : Part 4 : Sec 4 : 2018 Electromagnetic compatibility (EMC): Part 4 testing and measurement techniques: Sec 4 electrical fast transient / burst immunity test (Second Revision) LITD 9
7
IS 14700 : Part 4 : Sec 5 : 2019 Electromagnetic compatibility (EMC): Part 4 testing and measurement techniques: Sec 5 surge immunity test (First Revision) LITD 9
8
IS 14700 : Part 4 : Sec 6 : 2016 Electromagnetic compatibility (EMC): Part 4 testing and measurement techniques: Sec 6 immunity to conducted disturbances, induced by radio - Frequency fields LITD 9
9
IS 16828 : 2018 High - Current Test Techniques - Definitions and Requirements for Test Currents and Measuring Systems ETD 19
10
IS 2500 : Part 1 : 2000 Sampling procedures for inspection by attributes: Part 1 sampling schemes indexed by acceptance quality limit (AQL) for lot - By - Lot inspection (Third Revision) MSD 3
11
IS/CISPR 32 : 2015 Electromagnetic Compatibility of Multimedia Equipment Emission Requirements LITD 9
12
IS/IEC 60269 : Part 1 : 2014 Low-Voltage Fuses Part 1 General Requirements ETD 39
13
IS/IEC 60269 : Part 2 : 2016 Low-Voltage Fuses Part 2 Supplementary Requirements for Fuses for Use by Authorized Persons ( Fuses Mainly for Industrial Application ) — Examples of Standardized Systems of Fuses A to K ETD 39
14
IS/IEC 60269 : Part 2 : 2016 Low-Voltage Fuses Part 2 Supplementary Requirements for Fuses for Use by Authorized Persons ( Fuses Mainly for Industrial Application ) — Examples of Standardized Systems of Fuses A to K ETD 39
15
IS/IEC 60269 : Part 3 : 2010 Low-Voltage Fuses Part 3 Supplementary Requirements for Fuses for Use by Unskilled Persons ( Fuses Mainly for Household and Similar Applications ) — Examples of Standardized Systems of Fuses A to F ETD 39
16
IS/IEC/TR 60269 : Part 5 : 2014 Low-Voltage Fuses Part 5 Guidance for the Application of Low-Voltage Fuses ETD 39
17
IS/IEC 60269 : Part 6 : 2010 Low-Voltage Fuses Part 6 Supplementary Requirements for Fuse-Links for the Protection of Solar Photovoltaic Energy Systems ETD 39
International Standards Refered In IS/IEC 60947 : PART 3 : 2012 Standard contains no Cross Referenced International Standard.
IS/IEC 60947 : PART 3 : 2012 is Refered in following Indian Standards :
SNo IS Number Title Technical Committee
1 IS/IEC 61241 : PART 0 : 2004 Electrical apoparatus for use in the presence of compustible dust : Part 0 General requirements ETD 22
2 IS 10027 : 2018 Composite units of air - Break switches and rewirable type fuses for voltages not exceeding 650 v a.c. - Specification (Second Revision) ETD 7
3 IS 732 : 2019 Code of practice for electrical wiring installations (Fourth Revision) ETD 20
4 IS 17017 : Part 1 : 2018 Electric Vehicle Conductive Charging System Part 1 General Requirements ETD 51
5 IS 17017 : Part 1 : 2018 Electric Vehicle Conductive Charging System Part 1 General Requirements ETD 51
6 IS 17017 : Part 2 : Sec 2 : 2020 Electric Vehicle Conductive Charging System Part 2 Plugs, Socket – Outlets, Vehicle Connectors and Vehicle Inlets Section 2 Dimensional compatibility and interchangeability requirements for a.c. pin and contact-tube accessories ETD 51
7 IS 16997 : 2018 Requirements for Low-Voltage Special Electrical Installations or Locations Solar Photovoltaic ( PV ) Power Supply Systems ETD 20
8 IS 17017 : Part 2 : Sec 1 : 2020 Electric Vehicle Conductive Charging System Part 2 Plugs, Socket-Outlets, Vehicle Connectors, and Vehicle Inlets Section 1 General requirements ETD 51
9 IS 17017 : Part 2 : Sec 3 : 2020 Electric Vehicle Conductive Charging System Part 2 Plugs, Socket — Outlets, Vehicle Connectors and Vehicle Inlets Section 3 Dimensional compatibility and interchangeability requirements for d.c. and a.c./d.c. pin and contact-tube vehicle couplers ETD 51
10 IS/IEC/TS 62738 : 2018 Ground-Mounted Photovoltaic Power Plants — Design Guidelines and Recommendations ETD 28
11 IS/IEC 62548 : 2016 Photovoltaic PV Arrays Design Requirements ETD 28
12 IS 4105 : 1988 Styrene (Vinyl Benzene) PCD 9
13 IS 4175 : 1981 Correcting Fluid CHD 14
14 IS 5339 : 2021 Skin Powder for Infants PCD 19
15 IS/IEC 60947 : Part 6 : Sec 1 : 2013 Low-Voltage Switchgear and Controlgear Part 6 Multiple Function Equipment Section 1 Transfer switching equipment ETD 7
16 IS/IEC 60947 : Part 6 : Sec 1 : 2013 Low-Voltage Switchgear and Controlgear Part 6 Multiple Function Equipment Section 1 Transfer switching equipment ETD 7
17 IS 11563 : 2022 TECHNICAL SUPPLY CONDITIONS FOR DYNAMIC COMPRESSORS MED 22
18 IS 4287 : 2022 STARCH - GLOSSARY( THIRD REVISION OF IS 4287) FAD 16
19 IS/ISO 5116 : Part 2 : 2021 Improving transparency in financial and business reporting Harmonization topics - Part 2: Guidelines for data point modelling SSD 3