| SNo |
IS Number |
Title |
Technical Committee |
|
1 |
IS 16242 : Part 1 : 2014 |
Uninterruptible power systems (UPS): Part 1 general and safety requirements for UPS |
ETD 31 |
|
2 |
IS/IEC 60068 : Part 2 : Sec 1 : 2007 |
Environmental Testing Part 2 Tests Section 1 Test A: Cold |
LITD 1 |
|
3 |
IS/IEC 60068 : Part 2 : Sec 2 : 2007 |
Environmental Testing Part 2: Tests - Test B Section 2: Dry Heat |
LITD 1 |
|
4 |
IS 9000 : Part 7 : Sec 1 : 2018 |
Basic environmental testing procedures for electronic and electrical items: Part 7 impact test: Sec 1 shock (Test Ea) (Second Revision) |
LITD 1 |
|
5 |
IS 16539 : Part 1 : Sec 1 : 2017 |
Semiconductor Converters Part 1 General Requirements and Line Commutated Converters Section 1 Specification of basic requirements |
ETD 31 |
|
6 |
IS 15382 : Part 1 : 2022 |
Insulation Coordination for Equipment Within Low-Voltage Systems Part 1 Principles Requirements and Tests |
ETD 19 |
|
7 |
IS 14700 : Part 3 : Sec 2 : 2020 |
Electromagnetic Compatibility (EMC) Part 3 Limits Section 2 Limits for harmonic current emissions ( equipment input current ? 16 A per phase ) ( Third Revision ) |
LITD 9 |
|
8 |
IS 16242 : Part 2 : 2020 |
Uninterruptible Power Systems UPS Part 2 Electromagnetic Compatibility EMC Requirements ( First Revision ) |
ETD 31 |
|
9 |
IS 9733 : 2024 |
Packaging — Complete, Filled Transport Packages — General Rules for the Compilation of Performance Test Schedules (Second Revision) |
TED 24 |