SNo |
IS Number |
Title |
Technical Committee |
1 |
IS 504 : Part 1 To 12 : 2002 |
Chemical analysis of aluminium and its alloys parts 1 to 12 (Second Revision) |
MTD 34 |
2 |
IS 504 : Part 13 to 16 : 2003 |
Chemical analysis of aluminium and its alloys parts 13 to 16 (Second Revision) |
MTD 34 |
3 |
: |
|
|
4 |
IS 554 : 1999 |
Pipe threads where pressure - Tight joints are made on the threads - Dimensions, tolerances and designation (Fourth Revision) |
PGD 37 |
5 |
IS 617 : 1994 |
Cast aluminium and its alloys - Ingots and castings for general engineering purposes - Specification (Third Revision) |
MTD 7 |
6 |
IS 737 : 2008 |
Wrought aluminium and aluminium alloy sheet and strip for general engineering purposes - Specification (Fourth Revision) |
MTD 7 |
7 |
IS 1573 : 1986 |
Specification for electroplated coatings of zinc on iron and steel (Second Revision) |
MTD 24 |
8 |
IS 4736 : 1986 |
Specification for hot - Dip zinc coatings on mild steel tubes (Fist Revision) |
MTD 24 |
9 |
IS 4905 : 2015 |
Random sampling and randomization procedures (First Revision) |
MSD 3 |
10 |
IS 5382 : 2018 |
Rubber seals - Joint rings for water supply, drainage and sewerage pipelines - Specification for materials (Second Revision) |
PCD 13 |
11 |
IS 6418 : 1971 |
Specification for cast iron and malleable cast iron flanges for general engineering purposes |
MTD 6 |
12 |
IS 7634 : Part 2 : 2012 |
Plastics Pipes Selection, Handling, Storage and Installation for Potable Water Supplies - Code of Practice Part 2 Laying and jointing of polyethylene (PE) pipes |
CED 50 |
13 |
IS 8008 : Part 1 : 2003 |
Injection moulded/machined high density polyethylene (HDPE) fittings for potable water supplies - Specification: Part 1 general requirements for fittings (First Revision) |
CED 50 |
14 |
IS 8008 : Part 2 : 2003 |
Injection moulded/machined high density polyethylene (HDPE) fittings for potable water supplies - Specification: Part 2 specific requirements for 90° bend (First Revision) |
CED 50 |
15 |
IS 8008 : Part 3 : 2003 |
Injection Moulded/Machined High Density Polyethylene (HDPE) Fittings for Potable Water Supplies - - Part 3 : Specific Requirements for 90° TEES |
CED 50 |
16 |
IS 8008 : Part 4 : 2003 |
Injection moulded/machined high density polyethylene (HDPE) fittings for potable water supplies - Specification: Part 4 specific requirements for reducers (First Revision) |
CED 50 |
17 |
IS 8008 : Part 5 : 2003 |
Injection moulded/machined high density polyethylene (HDPE) fittings for potable water supplies - Specification: Part 5 specific requirements for ferrule reducers (First Revision) |
CED 50 |
18 |
IS 8008 : Part 6 : 2003 |
Injection moulded/machined high density polyethylene (HDPE) fittings for potable water supplies - Specification: Part 6 specific requirements for pipe ends (First Revision) |
CED 50 |
19 |
IS 8008 : Part 7 : 2003 |
Injection ivIoulded/machined high density polyethylene (HDPE) fittings for potable water supplies - Specification: Part 7 specific requirements for sandwich flanges (First Revision) |
CED 50 |
20 |
IS 8008 : Part 8 : 2003 |
Injection moulded/machined high density polyethylene (HDPE) fittings for potable water supplies - Specification: Part 8 specific requirements for reducing tees (First Revision) |
CED 50 |
21 |
IS 8360 : Part 1 : 1977 |
fabricated high density polyethylene (HDPE) fittings for potable water supplies: Part 1 General requirements |
CED 50 |
22 |
IS 8360 : Part 2 : 1977 |
fabricated high density polyethylene (MDPE) fittings for potable water supplies, Part 2 Specific requirements for 90 degree tees |
CED 50 |
23 |
IS 8360 : Part 3 : 1977 |
fabricated high density polyethylene (HDPE) fittings for potable water supplies, Part 3 Specifc requirements for 90 degree bends |
CED 50 |
24 |
IS 14151 : Part 1 : 1999 |
Irrigation Equipment - Sprinkler Pipes - Specification : Part 1 Polyethylene Pipes (First Revision) |
FAD 17 |