|
1 |
IS 10061 : 1991 |
Proforma for analysis of unit rate of excavation of tunnels by cyclic drilling and blasting (First Revision) |
Code of Practice |
------ |
|
2 |
IS 10062 : 1991 |
Proforma for analysis of unit rate of quarryinc rock by mechanical means (First Revision |
Code of Practice |
------ |
|
3 |
IS 10160 : 1982 |
Proforma for analysis of unit rate of earthwork used in construction of river valley projects |
Code of Practice |
------ |
|
4 |
IS 10386 : Part 8 : 1995 |
Safety code for construction, operation and maintenance of riveir valley projects: Part 8 open excavation |
Code of Practice |
------ |
|
5 |
IS 10386 : Part 6 : 1983 |
Safety code for construction, operation and maintenance of river valley projects: Part 6 construction |
Code of Practice |
------ |
|
6 |
IS 10421 : 1983 |
Proforma for analysis of unit rate of shuttering/formwork for concrete items |
Code of Practice |
------ |
|
7 |
IS 10751 : 1994 |
Planning and design of guide banks for alluvial rivers - Guidelines (First Revision) |
Code of Practice |
------ |
|
8 |
IS 10777 : 1994 |
Proforma for analysis of unit rate of rock excavation by mechanical means including blasting for open excavation (First Revision) |
Code of Practice |
------ |
|
9 |
IS 11228 : 1985 |
Recommendations for design of screw hoists for hydraulic gates |
Others |
------ |
|
10 |
IS 11293 : Part 2 : 1993 |
Guidelines for the design of grout curtains: Part 2 masonry and concrete gravity dams |
Code of Practice |
------ |
|
11 |
IS 11293 : Part 1 : 1985 |
Guidelines for the design of grout curtains: Part 1 earth and rockfill dams |
Code of Practice |
------ |
|
12 |
IS 11638 : 2000 |
Proforma for estimation of unit rate of construction of embankment by mechanical means (First Revision) |
Others |
------ |
|
13 |
IS 1192 : 2013 |
Hydrometry - Measurement of liquid flow in open channels using current - Meters or floats (Second Revision) |
Code of Practice |
------ |
|
14 |
IS 1193 : 1959 |
Methods for Measurements of Flow of Water in Open Channels Using Notches, Weirs and Flumes |
------ |
------ |
|
15 |
IS 12028 : 1987 |
Guidelines for Maintanance of River Embankments (Levees) |
------ |
------ |
|
16 |
IS 12182 : 1987 |
Guidelines for determination of effects of sedimentation in planning and performance of reservoirs |
Others |
------ |
|
17 |
IS 12752 : 2013 |
Hydrometric determinations - Flow measurements in open channels using structures - Guidelines for selection of structure (First Revision) |
Code of Practice |
------ |
|
18 |
IS 12804 : 1989 |
Criteria for estimation of aeration demand for spillway and outlet structures |
Code of Practice |
------ |
|
19 |
IS 12966 : Part 2 : 1990 |
Code of practice for galleries and other openings in dams: Part 2 structural design |
Code of Practice |
------ |
|
20 |
IS 13218 : Part 2 : 1991 |
Proforma for reporting progress during construction for river valley projects: Part 2 hydel works |
Code of Practice |
------ |
|
21 |
IS 13218 : Part 3 : 1992 |
Proforma for Reporting Progress During Construction for River Valley Projects: Part 3 Flood Control |
Others |
------ |
|
22 |
IS 13371 : 2014 |
Hydrometry - Calibration of current - Meters in straight open tanks (First Revision) |
Code of Practice |
------ |
|
23 |
IS 13418 : 1992 |
Proforma for analysis of unit rate of grouting used in river valley projects |
Code of Practice |
------ |
|
24 |
IS 13419 : 1992 |
Proforma for analysis of unit rate of shotcreting/guniting used in river ivalley projects |
Code of Practice |
------ |
|
25 |
IS 13969 : 1994 |
Sampling of Ground water - Guidelines |
Others |
------ |
|
26 |
IS 14177 : 1994 |
Guidelines for painting system for hydraulic gates and hoists |
Others |
------ |
|
27 |
IS 14344 : 1996 |
Design and construction of diaphragms for under - Seepage control - Code of practice |
Code of Practice |
------ |
|
28 |
IS 14476 : Part 1 to 9 : 1998 |
Test pumping of water wells - Code of practice |
Code of Practice |
------ |
|
29 |
IS 14574 : 1998 |
Measurement of liquid flow in open channels by weirs and flumes - End depth method for estlMation of flow in non - Rectangular channels with a free overfall (Approximate Method) |
Code of Practice |
------ |
|
30 |
IS 14590 : 1998 |
Proforma for analysis of unit rate of dewatering |
Code of Practice |
------ |
|
31 |
IS 14615 : Part 4 : 2018 |
Measurement of fluid flow by means of pressure differential devices inserted in circular crossSection conduits running full: Part 4 venturi tubes |
Code of Practice |
------ |
|
32 |
IS 14615 : Part 1 : 2018 |
Measurement of fluid flow by means of pressure differential devices inserted in circular crossSection conduits running full: Part 1 : general principles and requirements (First Revision) |
Code of Practice |
------ |
|
33 |
IS 14615 : Part 3 : 2018 |
Measurement of fluid flow by means of pressure differential devices inserted in circular crossSection conduits running full: Part 3 nozzles and venturi nozzles |
Code of Practice |
------ |
|
34 |
IS 14615 : Part 2 : 2018 |
Measurement of fluid flow by means of pressure differential devices inserted in circular cross -: Sec conduits running full: Part 2 orifice plates |
Code of Practice |
------ |
|
35 |
IS 14654 : 1999 |
Minimising evaporation losses from reservoirs - Guidelines |
Code of Practice |
------ |
|
36 |
IS 14673 : 2014 |
Hydrometry - Open channel flow measurement using triangular profile weirs (First Revision) |
Code of Practice |
------ |
|
37 |
IS 14869 : 2016 |
Flow measurement structures - Rectangular, trapezoidal and u - Shaped flumes (First Revision) |
Code of Practice |
------ |
|
38 |
IS 14973 : 2019 |
Measurement of fluid flow in closed conduits - Velocity area method using pitot static tube (First Revision) |
Code of Practice |
------ |
|
39 |
IS 15119 : Part 1 : 2002 |
Measurement of Liquid Flow in Open Channels - Part 1 : Establishment and Operation of a Gauging Station |
Code of Practice |
------ |
|
40 |
IS 15466 : 2004 |
Rubber seals for hydraulic gates - Specification |
Product Specification |
------ |
|
41 |
IS 15646 : Part 1 : 2006 |
Measurements of free surface flow in closed conduits : Part 1 Methods |
Code of Practice |
------ |
|
42 |
IS 15646 : Part 2 : 2006 |
Measurements of free surface flow in closed conduits : Part 2 Equipment |
Code of Practice |
------ |
|
43 |
IS 15755 : 2007 |
Hydrometry - Geophysical logging of boreholes for hydrogeological purposes - Considerations and guidelines for making measurements |
Others |
------ |
|
44 |
IS 15832 : 2008 |
Glossary of technical terms related to environmental impact |
Code of Practice |
------ |
|
45 |
IS 15845 : 2009 |
Environment management plan for hydropower/irrigation/flood control/ multipurpose river valley projects |
Code of Practice |
------ |
|
46 |
IS 16275 : 2014 |
Hydrometry - Acoustic Doppler Profiler - Method and Application for Measurement of Flow in Open Channels |
Code of Practice |
------ |
|
47 |
IS 2912 : 1999 |
Liquid flow measurement in open channels - Slope - Area method (First Revision) |
Code of Practice |
------ |
|
48 |
IS 2913 : 1964 |
Recommendation for determination of flow in tidal channels |
------ |
------ |
|
49 |
IS 2914 : 1964 |
Recommendations for Estimation of Discharges by Establishing Stage-discharge Relation in Open Channels |
------ |
------ |
|
50 |
IS 2915 : 1965 |
Instructions for Collection of Data for the Determination fof Error in Measurement of Flow by Velocity Area Methods |
------ |
------ |
|
51 |
IS 2952 : Part 2 : 1975 |
Recommendations for methods of measurement of liquid flow by means of orifice plates and nozzles: Part 2 Compressible fluids |
------ |
------ |
|
52 |
IS 2952 : Part 1 : 1964 |
Recommendation for Methods of Measurement of Fluid Flow by Means of Orifice Plates and Nozzles - Part I : Incompressible Fluids |
------ |
------ |
|
53 |
IS 3860 : 1966 |
Precast Cement Concreat Slabs for Cannal Lining |
------ |
------ |
|
54 |
IS 4080 : 1994 |
Vertical staff gauges - Functional requirements (First Revision) |
Dimensions |
------ |
|
55 |
IS 4186 : 1985 |
Guide for preparation of project report for river valley projects (First Revision) |
Code of Practice |
------ |
|
56 |
IS/ISO 4362 : 1992 |
Measurement of Liquid flow in Open Channels - Trapezoidal Profile Weirs |
------ |
------ |
|
57 |
IS 4410 : Part 6 : 1983 |
Glossary of terms relating to river valley projects: Part 6 reservoirs (First Revision |
Code of Practice |
------ |
|
58 |
IS 4410 : Part 11 : Sec 1 : 1972 |
Glossary of terms relating to river valley projects: Part 11 hydrology: Sec 1 general terms |
Terminology |
------ |
|
59 |
IS 4410 : Part 17 : 1977 |
Glossary of terms relating to river valley projects: Part 17 water requirements of crops |
Terminology |
------ |
|
60 |
IS 4410 : Part 5 : 1982 |
Glossary of terms relating to river valley projects: Part v canals (First Revision) |
Terminology |
------ |
|
61 |
IS 4410 : Part 15 : Sec 1 : 1973 |
Glossary of terms relating to river valley projects: Part 15 Canal structures Section 1 General terms |
Terminology |
------ |
|
62 |
IS 4410 : Part 15 : Sec 5 : 1992 |
Glossary of terms relating to river valley projects: Part 15 canal structures: Sec 5 cross - Drainage works (First Revision) |
Terminology |
------ |
|
63 |
IS 4410 : Part 15 : Sec 2 : 1973 |
Glossary of terms relating to river valley projects: Part 15 canal structures: Sec 2 transitions |
Terminology |
------ |
|
64 |
IS 4464 : 2020 |
Code of Practice for Presentation of Drilling Information and Core Description in Geotechnical Investigation ( Second Revision ) |
Code of Practice |
------ |
|
65 |
IS 4477 : Part 1 : 1967 |
Method of Measurement of Fluid Flow by Means of Venturi Meters - Part I : Liquids |
------ |
------ |
|
66 |
IS 4745 : 1968 |
Code of Practice for Design of Cross-section of Lined Canals |
------ |
------ |
|
67 |
IS 4851 : 1987 |
Proforma for estimating unit rate of concrete used in mechanized construction of river valley projects (Second Revision) |
Code of Practice |
------ |
|
68 |
IS 4852 : 1987 |
Proforma for estlMating unit rate of random rubble masonry used in construction of river valley projects (Second Revision) |
Code of Practice |
------ |
|
69 |
IS 4880 : Part 1 : 1987 |
Code of practice for design of tunnels conveying water: Part 1 general design (First Revision) |
Code of Practice |
------ |
|
70 |
IS 4969 : 1968 |
Method of Test for Detemining Flexural Strength of Precast Cement Concrete Slabs for Canal Lining |
------ |
------ |
|
71 |
IS 5331 : 1969 |
Guide for Selection of Type of Lining for Canals |
------ |
------ |
|
72 |
IS 6059 : 1971 |
Recommendations for liquid flow measurement in open channels by weirs and flumes - weirs of finite crest width for free discharge |
------ |
------ |
|
73 |
IS 6065 : Part 1 : 2001 |
Recommendations for the preparation of geological and geotechnical maps for river valley project: Part 1 Scales |
------ |
------ |
|
74 |
IS 6330 : 2012 |
Liquid flow measurement in open channels by weirs and flumes - End - Depth method for estimation of flow in rectangular channels with a free overfall (First Revision) |
Code of Practice |
------ |
|
75 |
IS 6531 : 1994 |
Canalhead regulators crtteria for design (First Revision) |
Code of Practice |
------ |
|
76 |
IS 6748 : Part 1 : 1973 |
Recommendations for watershed management relating to soil conservation: Part 1 agronomic aspects |
Others |
------ |
|
77 |
IS 6934 : 2014 |
Hydraulic design of high ogee overflow and orifice spillways - Recommendations (Second Revision) |
Others |
------ |
|
78 |
IS 7422 : Part 5 : 1992 |
Symbols and abbreviations for use in geological maps: Sections and sub - Surface exploratory logs: Part 5 line symbols for formation contacts and structural features |
Others |
------ |
|
79 |
IS 7422 : Part 2 : 1974 |
Symbols and abbreviations for use in geological maps: Section and subsurface exploratory logs: Part 2 igneous rocks |
Others |
------ |
|
80 |
IS 7422 : Part 4 : 1985 |
Symbols and abbreviations for use in geological maps: Sections and subsurface exploratory logs: Part 4 metamorphic rocks |
Others |
------ |
|
81 |
IS 7422 : Part 1 : 1974 |
Symbols and abbreviations for use in geological Maps: Section and subsurface exploratory logs: Part 1 abbreviations |
Others |
------ |
|
82 |
IS 7422 : Part 3 : 1974 |
Symbols and abbreviations for use in geological maps, Sections and subsurface exploratory logs: Part 3 sedimentary rocks |
Others |
------ |
|
83 |
IS 8237 : 1985 |
Code of practice for protection of slope for reservoir embankment (First Reoision) |
Code of Practice |
------ |
|
84 |
IS 9117 : 1979 |
Reccomendation for Liquid Flow Measurement in Open Channels by Weirs and Flumes - End Depth Method for Eastimation of Flow in non Rectangulars Channels with a Free Overall (Approximate Method) |
------ |
------ |
|
85 |
IS 9119 : 1979 |
Method of flow estimation by jet characteristics (Approximate Method) |
Methods of tests |
------ |
|
86 |
IS 9120 : 1979 |
Guidelines for planning, layout and design of cavities in underground hydroelectric power stations |
Others |
------ |
|
87 |
IS 9163 : Part 1 : 1979 |
Dilution Methods for Measurement of Steady Flow - Part I : Constant Rate Injection Method |
Code of Practice |
------ |
|
88 |
IS 9297 : 1979 |
Recommendations for lighting, ventilation and other facilities inside dams |
Others |
------ |
|
89 |
IS 9401 : Part 15 : Sec 1 : 1993 |
Method of measurement of works in river valley projects (Dams and appurtenant structures): Part 15 Investigation works Section 1 Drilling of bore holes |
------ |
------ |
|
90 |
IS 9401 : Part 19 : 2009 |
Method of measurement of works in river valley projects (Dams And Appurtenant Structures): Part 19 electro - Mechanical works |
Code of Practice |
------ |
|
91 |
IS 9401 : Part 15 : Sec 2 : 1992 |
Method of Measurement of Works in River Valley Projects (dams and appurtenant structures) - Part 15 : Investigation Works - Section 2 : Exploratory Drifting |
------ |
------ |
|
92 |
IS 9447 : 1980 |
Guidelines for assessment of seepage losses from canals by analytical method |
Others |
------ |
|
93 |
IS 9451 : 1994 |
Guidelines for lining of canals in expansive soils (Second Revision) |
Code of Practice |
------ |
|
94 |
IS 9922 : 2010 |
Measurement of Liquid Flow in Open Channels - General Guidelines for Selection of Method |
Code of Practice |
------ |