RECOMMENDATIONS FOR LIGHTING VENTILATION AND OTHER FACILITIES INSIDE DAMS
08-03-2024
93.160
2.
WRD 1(23881)
HYDROMETRY ACOUSTIC DOPPLER PROFILER METHOD AND APPLICATION FOR MEASUREMENT OF FLOW IN OPEN CHANNELS
20-12-2023
17.120.20
3.
WRD 1(23843)
Methods for Measurement of Suspended Sediment in Open Channels
17-01-2024
17.120.20
4.
WRD 1(23721)
FLOW MEASUREMENT STRUCTURES RECTANGULAR TRAPEZOIDAL AND U-SHAPED FLUMES
20-12-2023
17.120.20
5.
WRD 24(23488)
GUIDELINES FOR ENVIRONMENTAL IMPACT ASSESSMENT AND ENVIRONMENTAL MANAGEMENT PLAN EIA EMP FOR RIVER VALLEY AND HYDRO-ELECTRIC PROJECTS
03-11-2023
93.160
6.
WRD 6(22645)
RECOMMENDATIONS FOR WATERSHED MANAGEMENT RELATING TO SOIL CONSERVATION PART 1 AGRONOMIC ASPECTS First Revision of IS 6748 Part 1
20-11-2023
93.160
7.
WRD 6(22547)
PROFORMA FOR REPORTING PROGRESS DURING CONSTRUCTION FOR RIVER VALLEY PROJECTS PART 3 FLOOD CONTROL First Revision of IS 13218 Part 3
30-12-2023
93.160
8.
WRD 22(22125)
CONSTRUCTION AND MAINTENANCE OF RIVER EMBANKMENTS LEVEES GUIDELINES Second Revision of IS 11532
16-05-2023
93.140
9.
WRD 22(22124)
SAFETY OF BARRAGE AND WEIR STRUCTURES — GUIDELINES (First Revision of IS 12892)
16-05-2023
93.160
10.
WRD 22(22122)
PLANNING AND DESIGN OF REVETMENT – GUIDELINES (First Revision of IS 14262)
16-05-2023
93.160
11.
WRD 1(22080)
Measurement of fluid flow by means of pressure differential devices inserted in circular cross -: Sec conduits running full: Part 2 orifice plates
13-06-2023
17.120.20
12.
WRD 1(22064)
Measurement of Fluid Flow by Means of Pressure Differential Devices Inserted In Circular Cross Section Conduits Running Full Part 4 Venturi Tubes
31-05-2023
17.120.20
13.
WRD 1(22063)
Measurement of Fluid Flow by Means of Pressure Differential Devices Inserted In Circular Cross Section Conduits Running Full Part 1 : General Principles And Requirements
31-05-2023
17.120.10
14.
WRD 1(22021)
VERTICAL STAFF GAUGES-FUNCTIONAL REQUIREMENTS
27-04-2023
17.120.01
15.
WRD 3(21909)
HYDROMETRY GEOPHYSICAL LOGGING OF BOREHOLES FOR HYDROGEOLOGICAL PURPOSES CONSIDERATIONS AND GUIDELINES FOR MAKING MEASUREMENTS
21-05-2023
93.020
16.
WRD 15(21609)
GUIDELINES FOR PLANNING LAYOUT AND DESIGN OF CAVITIES IN UNDERGROUND HYDROELECTRIC POWER STATIONS
03-03-2023
93.160
17.
WRD 1(21458)
HYDROMETRIC DETERMINATIONS FLOW MEASUREMENTS IN OPEN CHANNELS USING STRUCTURES GUIDELINES FOR SELECTION OF STRUCTURE
08-02-2023
17.120.20
18.
WRD 8(21401)
GLOSSARY OF TERMS RELATING TO RIVER VALLERY PROJECTS PART 19 GROUTING
07-03-2023
93.160
19.
WRD 5(21364)
SYMBOLS AND ABBREVATIONS FOR USE IN GEOLOGICAL MAPS SECTIONS AND SUBSURFACE EXPLORATORY LOGS PART 1 ABBREVATIONS
04-02-2023
93.160, 07.060
20.
WRD 10(21163)
OPERATION OF RESERVOIRS GUIDELINES
06-01-2023
93.160
21.
WRD 1(20512)
HYDROMETRY FUNCTIONAL REQUIREMENTS AND CHARACTERISTICS OF SUSPENDED- SEDIMENT SAMPLERS
13-12-2022
17.120.20
22.
WRD 1(20496)
HYDROMETRY VOCABULARY AND SYMBOLS
13-12-2022
01.040.17
23.
WRD 1(20347)
Measurement of Fluid Flow in Closed Conduits Velocity Area Method Using Pitot Static Tube
24-10-2022
17.120.10
24.
WRD 1(20332)
HHydrometry - Calibration of current - Meters in straight open tanks
24-10-2022
17.120.20
25.
WRD 5(19982)
GEOLOGICAL EXPLORATION FOR RESERVOIR SITES GUIDELINES (FIRST REVISION)
27-11-2022
93.160
26.
WRD 14(18185)
CODE OF PRACTICE FOR DESIGN OF TUNNELS CONVEYING WATER PART 4 STRUCTURAL DESIGN OF CONCRETE LINING IN ROCK
19-12-2022
93.160
27.
WRD 3(17098)
Guidelines for Aquifer Mapping
16-02-2023
93.160
28.
WRD 23(16777)
Proforma for analysis of unit rate of shuttering formwork for concrete items first revision of IS 10421
16-09-2022
93.160
29.
WRD 23(16776)
Guidelines for estimating unit rate of items of works in construction of rubble masonry for river valley projects First Revision of IS 14835
N/A
93.160
30.
WRD 23(16774)
Proforma for analysis of unit rate of dewatering first revision of IS 14590
22-07-2022
93.160
31.
WRD 23(16773)
Proforma for analysis of unit rate of shotcreting guniting used in river valley projects first revision of IS 13419
14-05-2022
93.160
32.
WRD 23(16772)
Proforma for analysis of unit rate of grouting first revision of IS 13418
22-07-2022
93.160
33.
WRD 23(16771)
Proforma for analysis of unit rate of construction of embankment by mechanical means Second revision of IS 11638
14-05-2022
93.160
34.
WRD 23(16770)
Proforma for analysis of unit rate of rock excavation by mechanical means including blasting for open excavation Second Revision of IS 10777
14-05-2022
93.160
35.
WRD 24(10945)
Guidelines for the preparation of catchment area treatment plan