WC-draft/WRD

S No Document No. Document title Last date of comment Detail ICS No. Draft
1. WRD 9(24572) RECOMMENDATIONS FOR LIGHTING VENTILATION AND OTHER FACILITIES INSIDE DAMS 08-03-2024 93.160
2. WRD 1(23881) HYDROMETRY ACOUSTIC DOPPLER PROFILER METHOD AND APPLICATION FOR MEASUREMENT OF FLOW IN OPEN CHANNELS 20-12-2023 17.120.20
3. WRD 1(23843) Methods for Measurement of Suspended Sediment in Open Channels 17-01-2024 17.120.20
4. WRD 1(23721) FLOW MEASUREMENT STRUCTURES RECTANGULAR TRAPEZOIDAL AND U-SHAPED FLUMES 20-12-2023 17.120.20
5. WRD 24(23488) GUIDELINES FOR ENVIRONMENTAL IMPACT ASSESSMENT AND ENVIRONMENTAL MANAGEMENT PLAN EIA EMP FOR RIVER VALLEY AND HYDRO-ELECTRIC PROJECTS 03-11-2023 93.160
6. WRD 6(22645) RECOMMENDATIONS FOR WATERSHED MANAGEMENT RELATING TO SOIL CONSERVATION PART 1 AGRONOMIC ASPECTS First Revision of IS 6748 Part 1 20-11-2023 93.160
7. WRD 6(22547) PROFORMA FOR REPORTING PROGRESS DURING CONSTRUCTION FOR RIVER VALLEY PROJECTS PART 3 FLOOD CONTROL First Revision of IS 13218 Part 3 30-12-2023 93.160
8. WRD 22(22125) CONSTRUCTION AND MAINTENANCE OF RIVER EMBANKMENTS LEVEES GUIDELINES Second Revision of IS 11532 16-05-2023 93.140
9. WRD 22(22124) SAFETY OF BARRAGE AND WEIR STRUCTURES — GUIDELINES (First Revision of IS 12892) 16-05-2023 93.160
10. WRD 22(22122) PLANNING AND DESIGN OF REVETMENT – GUIDELINES (First Revision of IS 14262) 16-05-2023 93.160
11. WRD 1(22080) Measurement of fluid flow by means of pressure differential devices inserted in circular cross -: Sec conduits running full: Part 2 orifice plates 13-06-2023 17.120.20
12. WRD 1(22064) Measurement of Fluid Flow by Means of Pressure Differential Devices Inserted In Circular Cross Section Conduits Running Full Part 4 Venturi Tubes 31-05-2023 17.120.20
13. WRD 1(22063) Measurement of Fluid Flow by Means of Pressure Differential Devices Inserted In Circular Cross Section Conduits Running Full Part 1 : General Principles And Requirements 31-05-2023 17.120.10
14. WRD 1(22021) VERTICAL STAFF GAUGES-FUNCTIONAL REQUIREMENTS 27-04-2023 17.120.01
15. WRD 3(21909) HYDROMETRY GEOPHYSICAL LOGGING OF BOREHOLES FOR HYDROGEOLOGICAL PURPOSES CONSIDERATIONS AND GUIDELINES FOR MAKING MEASUREMENTS 21-05-2023 93.020
16. WRD 15(21609) GUIDELINES FOR PLANNING LAYOUT AND DESIGN OF CAVITIES IN UNDERGROUND HYDROELECTRIC POWER STATIONS 03-03-2023 93.160
17. WRD 1(21458) HYDROMETRIC DETERMINATIONS FLOW MEASUREMENTS IN OPEN CHANNELS USING STRUCTURES GUIDELINES FOR SELECTION OF STRUCTURE 08-02-2023 17.120.20
18. WRD 8(21401) GLOSSARY OF TERMS RELATING TO RIVER VALLERY PROJECTS PART 19 GROUTING 07-03-2023 93.160
19. WRD 5(21364) SYMBOLS AND ABBREVATIONS FOR USE IN GEOLOGICAL MAPS SECTIONS AND SUBSURFACE EXPLORATORY LOGS PART 1 ABBREVATIONS 04-02-2023 93.160, 07.060
20. WRD 10(21163) OPERATION OF RESERVOIRS GUIDELINES 06-01-2023 93.160
21. WRD 1(20512) HYDROMETRY FUNCTIONAL REQUIREMENTS AND CHARACTERISTICS OF SUSPENDED- SEDIMENT SAMPLERS 13-12-2022 17.120.20
22. WRD 1(20496) HYDROMETRY VOCABULARY AND SYMBOLS 13-12-2022 01.040.17
23. WRD 1(20347) Measurement of Fluid Flow in Closed Conduits Velocity Area Method Using Pitot Static Tube 24-10-2022 17.120.10
24. WRD 1(20332) HHydrometry - Calibration of current - Meters in straight open tanks 24-10-2022 17.120.20
25. WRD 5(19982) GEOLOGICAL EXPLORATION FOR RESERVOIR SITES GUIDELINES (FIRST REVISION) 27-11-2022 93.160
26. WRD 14(18185) CODE OF PRACTICE FOR DESIGN OF TUNNELS CONVEYING WATER PART 4 STRUCTURAL DESIGN OF CONCRETE LINING IN ROCK 19-12-2022 93.160
27. WRD 3(17098) Guidelines for Aquifer Mapping 16-02-2023 93.160
28. WRD 23(16777) Proforma for analysis of unit rate of shuttering formwork for concrete items first revision of IS 10421 16-09-2022 93.160
29. WRD 23(16776) Guidelines for estimating unit rate of items of works in construction of rubble masonry for river valley projects First Revision of IS 14835 N/A 93.160
30. WRD 23(16774) Proforma for analysis of unit rate of dewatering first revision of IS 14590 22-07-2022 93.160
31. WRD 23(16773) Proforma for analysis of unit rate of shotcreting guniting used in river valley projects first revision of IS 13419 14-05-2022 93.160
32. WRD 23(16772) Proforma for analysis of unit rate of grouting first revision of IS 13418 22-07-2022 93.160
33. WRD 23(16771) Proforma for analysis of unit rate of construction of embankment by mechanical means Second revision of IS 11638 14-05-2022 93.160
34. WRD 23(16770) Proforma for analysis of unit rate of rock excavation by mechanical means including blasting for open excavation Second Revision of IS 10777 14-05-2022 93.160
35. WRD 24(10945) Guidelines for the preparation of catchment area treatment plan 03-11-2023 93.160