| 1. |
WRD 13(33084) |
Design of cross drainage works - Code of practice: Part 1 general features (Second Revision) |
N/A |
|
93.160 |
|
| 2. |
WRD 13(33083) |
Criteria for design of lined canals and guidance for selection of type of lining (First Revision) |
N/A |
|
93.160 |
|
| 3. |
WRD 13(33082) |
Glossary of terms relating to river valley projects: Part 15 canal structures: Sec 4 regulating works |
N/A |
|
93.160 |
|
| 4. |
WRD 13(33081) |
Code of practice for construction of cross drainage works (Second Revision) |
N/A |
|
93.160 |
|
| 5. |
WRD 29(32805) |
Small Hydropower Projects - Vocabulary |
N/A |
|
93.160 |
|
| 6. |
WRD 3(28241) |
GUIDELINES FOR SURFACE RUNOFF HARVESTING USING SMALL STRUCTURES PART 3 SURFACE RUNOFF HARVESTING |
N/A |
|
93.025 |
|
| 7. |
WRD 3(27724) |
GUIDELINES FOR SURFACE RUNOFF HARVESTING USING SMALL STRUCTURES PART 2 IN-SITU MOISTURE CONSERVATION |
N/A |
|
93.025 |
|
| 8. |
WRD 3(27384) |
GUIDELINES FOR SURFACE RUNOFF HARVESTING USING SMALL STRUCTURES PART 1 GENERAL AND DESIGN CONCEPT |
N/A |
|
93.025 |
|
| 9. |
WRD 16(27379) |
Surveillance and Performance Monitoring of Hydraulic Structures - Guidelines |
N/A |
|
93.160 |
|
| 10. |
WRD 12(27378) |
Design of Lock Gates |
N/A |
|
93.160 |
|
| 11. |
WRD 12(27377) |
Recommendations for Structural Design of Stoplog |
N/A |
|
93.160 |
|
| 12. |
WRD 29(27373) |
Small Hydropower Projects Design of Civil Works |
N/A |
|
93.160 |
|
| 13. |
WRD 14(27048) |
CRITERIA FOR HYDRAULIC DESIGN OF HYDROPOWER INTAKES GUIDELINES Second Revision of IS 9761 |
N/A |
|
93.160 |
|
| 14. |
WRD 10(25683) |
METHODS FOR DETERMINATION OF EVAPORATION FROM RESERVOIRS Second Revision of IS 6939 |
N/A |
|
93.160 |
|
| 15. |
WRD 13(24526) |
UNDER-DRAINAGE OF LINED CANALS - CODE OF PRACTICE |
N/A |
|
93.160 |
|