×


WRD Standards List



Aspect : Publication Date :


Total Standards :  464

Revised Standards   
S.No IS Number IS Title Amendment Reaffirmation Year Document Action
1 SP 55 : 1993

Design aid for anchorages for spillway piers, training walls and divide walls 0 Download
2 IS 1191 : 2016
ISO 4006:1991
(Third Revision)
Hydrometry - Vocabulary and symbols(Third Revision) 0 Mar, 2021 Buy
3 IS 1192 : 2013
ISO 748:2007
(Second Revision)
Hydrometry - Measurement of liquid flow in open channels using current - Meters or floats (Second Revision) 0 Jan, 2018 Buy
4 IS 1194 : 1960

Forms for recording measurement of flow of water in open channels 0 Aug, 2020 Download
5 IS 2912 : 1999
ISO 1070:1992
(First Revision)
Liquid flow measurement in open channels - Slope - Area method (First Revision) 1 Feb, 2020 Buy
6 IS 2951 : Part 1 : 1965

Recommendation for estimation of flow of liquids in closed conduits: Part i head loss in straight pipes due to frictional resistance 0 Sep, 2017 Download
7 IS 2951 : Part 2 : 1965

Recommendation for estimation of flow of liquids in closed conduits: Part 2 head loss in valves and fittings 1 Sep, 2017 Download
8 IS 3872 : 2002

(First Revision)
Lining of canals with burnt clay tiles - Code of practice (First Revision) 1 Aug, 2017 Download
9 IS 3873 : 1993

(Second Revision)
Laying .cement concrete/stone slab lining on canals - Code of practice (Second Revision) 1 Nov, 2019 Download
10 IS 3910 : 2013
ISO 2537:2007
(Second Revision)
Hydrometry - Rotating - Element current - Meters (Second Revision) 0 Jan, 2018 Buy
11 IS 3911 : 1994

(First Revision)
Surface floats - Functional requirements (First Revision) 0 Feb, 2020 Download
12 IS 3912 : 2013
ISO 3454:2008
(Second Revision)
Hydrometry - Direct depth sounding and suspension equipment (Second Revision) 0 Jan, 2018 Buy
13 IS 3913 : 2014

(Second Revision)
Hydrometry - Functional requirements and characteristics of suspended - Sediment samplers (Second Revision) 0 Mar, 2020 Buy
14 IS 3917 : 2003
ISO 4364
(First Revision)
Scoop type bed material samplers - Specification (First Revision) 0 Buy
15 IS 3918 : 1966

Code of practice for use of current meter (Cup Type) for water flow measurement 1 Aug, 2020 Download
16 IS 4008 : 1985

(First Revision)
Guide for presentation of project report for river valley projects (First Revision) 0 Jan, 2021 Download
17 IS 4073 : 1967

Specification for fish weights 0 Aug, 2020 Download
18 IS 4078 : 1980

(First Revision)
Code of practice for indexing and storage of drill cores (First Revision 0 Download
19 IS 4080 : 1994

(First Revision)
Vertical staff gauges - Functional requirements (First Revision) 0 Feb, 2020 Download
20 IS 4186 : 1985

(First Revision)
Guide for preparation of project report for river valley projects (First Revision) 0 Jan, 2021 Download
21 IS 4247 : Part 1 : 1993

(Third Revision)
Structural design of surface hydroelectric power stations: Part 1 data for design - Code of practice (Third Revision) 1 Nov, 2018 Download
22 IS 4247 : Part 2 : 1992

(Second Revision)
Code of practice for structural design of surface hydroelectric power station: Part 2 superstructure (Second Revision) 1 Nov, 2018 Download
23 IS 4247 : Part 3 : 1998

(Second Revision)
Code of practicefor structural design of surfacehydel power stations: Part 3 sub - Structure (Second Revision) 0 Nov, 2018 Download
24 IS 4410 : Part 1 : 1991

(First Revision)
Glossary of terms relating to river valley projects: Part 1 irrigation practice (First Revision) 0 Mar, 2019 Download
25 IS 4410 : Part 2 : 1967

Glossary of terms relating to river valley projects: Part 2 project planning 0 Jan, 2021 Download
26 IS 4410 : Part 3 : 1988

(First Revision)
Glossary of terms relating to river valley projects: Part 3 river and river training (First Revision) 0 Mar, 2021 Download
27 IS 4410 : Part 4 : 1982

(First Revision)
Glossary of terms relating to river valley projects: Part 4 drawings (First Revision) 0 Jan, 2021 Download
28 IS 4410 : Part 5 : 1982

(First Revision)
Glossary of terms relating to river valley projects: Part v canals (First Revision) 0 Download
29 IS 4410 : Part 6 : 1983

(First Revision)
Glossary of terms relating to river valley projects: Part 6 reservoirs (First Revision 0 Mar, 2021 Download
30 IS 4410 : Part 7 : 1982

(First Revision)
Glossary of terms relating to river valley projects: Part 7 engineering geology (First Revision) 0 Feb, 2020 Download
31 IS 4410 : Part 8 : 1992

(First Revision)
Glossary of terms relating to river valley projects: Part 8 dams and dam: Section (First Revision) 0 Download
32 IS 4410 : Part 9 : 1982

(First Revision)
Glossary of terms relating to river valley projects: Part 9 spillways and siphons (First Revision) 0 Mar, 2021 Download
33 IS 4410 : Part 10 : 1988

(First Revision)
Glossary of terms relating to river valley projects: Part 10 hydro - Electric power station including water conductor system (First Revision) 0 Nov, 2018 Download
34 IS 4410 : Part 11 : Sec 1 : 1972

Glossary of terms relating to river valley projects: Part 11 hydrology: Sec 1 general terms 0 Oct, 2020 Download
35 IS 4410 : Part 11 : Sec 2 : 1972

Glossary of terms relating to river valley projects: Part 11 hydrology: Sec 2 precipitation and run off 0 Oct, 2020 Download
36 IS 4410 : Part 11 : Sec 3 : 1973

Glossary of terms relating to river valley projects: Part 11 hydrology: Sec 3 0 Oct, 2020 Download
37 IS 4410 : Part 11 : Sec 4 : 1973

Glossary of terms relating to river valley projects: Part 11: Sec hydrology hydrograph 0 Oct, 2020 Download
38 IS 4410 : Part 11 : Sec 5 : 1977

Glossary of terms relating to river valley projects: Part 11 hydrology: Sec 5 floods 0 Mar, 2019 Download
39 IS 4410 : Part 11 : Sec 6 : 2018

(Second Revision)
Glossary of terms relating to river valley projects: Part 11 hydrology: Sec 6 groundwater (Second Revision) 0 ---- Download
40 IS 4410 : Part 11 : Sec 7 : 1984

Glossary of terms relating to river valley projects: Part 11 hydrology: Sec 7 quality of wate 0 Mar, 2016 Download
41 IS 4410 : Part 12 : 1993

(First Revision)
Glossary of terms relating to river valley projects: Part 12 diversion works (First Revision) 0 Mar, 2021 Download
42 IS 4410 : Part 13 : 1985

Glossary of terms relating to river valley projects: Part 13 Operation, Maintenance and Repair of River Valley Projects 0 Feb, 2020 Download
43 IS 4410 : Part 14 : Sec 1 : 1977

Glossary of terms relating to river valley projects: Part 14 soil conservation and reclamation: Sec 1 soil conservation 0 Mar, 2019 Download
44 IS 4410 : Part 14 : Sec 2 : 1977

Glossary of terms relating to river valley projects: Part 14 soil conservation and reclamation: Sec 2 reclamation 0 Mar, 2019 Download
45 IS 4410 : Part 15 : Sec 1 : 1973

Glossary of terms relating to river valley projects: Part 15 Canal structures Section 1 General terms 0 Feb, 2020 Download
46 IS 4410 : Part 15 : Sec 2 : 1973

Glossary of terms relating to river valley projects: Part 15 canal structures: Sec 2 transitions 0 Download
47 IS 4410 : Part 15 : Sec 3 : 1977

Glossary of terms relating to river valley projects: Part 15 canal structures: Sec 3 flume. 0 Download
48 IS 4410 : Part 15 : Sec 4 : 1977

Glossary of terms relating to river valley projects: Part 15 canal structures: Sec 4 regulating works 0 Download
49 IS 4410 : Part 15 : Sec 5 : 1992

(First Revision)
Glossary of terms relating to river valley projects: Part 15 canal structures: Sec 5 cross - Drainage works (First Revision) 0 Aug, 2017 Download
50 IS 4410 : Part 16 : Sec 1 : 1999

(First Revision)
Glossary of terms relating to river valley projects: Part 16 gates and valves: Sec 1 gateb andTerms related with gates (First Revision) 0 Download
51 IS 4410 : Part 16 : Sec 2 : 1981

Glossary of terms relating to river valley projects: Part xvi gates and valves: Sec 2 valves 0 Download
52 IS 4410 : Part 17 : 1977

Glossary of terms relating to river valley projects: Part 17 water requirements of crops 0 Mar, 2019 Download
53 IS 4410 : Part 18 : 1983

Glossary of terms relating to river valley projects: Part 18 energy dissipation devices (Stilling Basins) 0 Mar, 2021 Download
54 IS 4410 : Part 19 : 1996

Glossary of terms relating to rivervalley projects: Part 19 grouting 0 Apr, 2021 Download
55 IS 4410 : Part 20 : 1983

Glossary of terms relating to river valley projects: Part 20 tunnels 0 Download
56 IS 4410 : Part 21 : 1987

Glossary of terms relating to river valley projects: Part 21 flood control 1 Mar, 2020 Download
57 IS 4410 : Part 22 : 1994

Gloss4ry of terms relating to river valley projects: Part 22 barrages and weirs 0 Mar, 2021 Download
58 IS 4410 : Part 23 : 1999

Glossary of terms relating to river valley projects 0 Mar, 2018 Download
59 IS 4453 : 2009

(Second Revision)
Subsurface exploration by pits, trenches, drifts and shafts - Code of practice (Second Revision) 0 Feb, 2020 Download
60 IS 4461 : 1998

(Second Revision)
Code of practice for joints in surface hydroelectric power stations (Second Revision) 0 Nov, 2018 Download
61 IS 4464 : 2020

(Second Revision)
Code of Practice for Presentation of Drilling Information and Core Description in Geotechnical Investigation ( Second Revision ) 0 ---- Download
62 IS 4477 : Part 2 : 1975

Method of measurement of fluid flow by means of venturi meters: Part ii compressible fluids 0 Aug, 2020 Download
63 IS 4515 : 2002

(Second Revision)
Stone pitched lining for canals - Code of practice (Second Revision) 0 Aug, 2017 Download
64 IS 4558 : 1995

(Second Revision)
Under - Drainage of lined canals - Code of practice (Second Revision) 1 Apr, 2021 Download
65 IS 4622 : 2020

(Fourth Revision)
Recommendations for Structural Design of Fixed-Wheel Gates ( Fourth Revision ) 0 ---- Download
66 IS 4623 : 2000

(Third Revision)
Recommendations for structural design of radial gates (Third Revision) 0 Feb, 2019 Download
67 IS 4701 : 1982

(First Revision)
Code of practice for earthwork on canals (First Revision 0 Nov, 2019 Download
68 IS 4720 : 2020

(Second Revision)
Ventilation of Surface Hydel Power Stations — Code of Practice ( Second Revision ) 0 ---- Download
69 IS 4721 : 2014

(Second Revision)
Code of practice for drainage and dewatering of surface/ underground hydroelectric power stations (Second Revision) 0 Aug, 2019 Download
70 IS 4839 : Part 1 : 1992

(Second Revision)
Maintenance of canals code of practice: Part 1 unlined canals (Second Revision) 1 Aug, 2017 Download
71 IS 4839 : Part 2 : 1992

(Second Revision)
Maintenance of canals - Codb of practice: Part 2 lined canals (Second Revision) 1 Apr, 2021 Download
72 IS 4839 : Part 3 : 1992

(Second Revision)
Code of practice for maintenance of canals: Part 3 canal structures, drains, outlets, jungle, clearance, plantation and regulation f second revision) 1 Aug, 2017 Download
73 IS 4851 : 1987

(Second Revision)
Proforma for estimating unit rate of concrete used in mechanized construction of river valley projects (Second Revision) 0 Jan, 2018 Download
74 IS 4852 : 1987

(Second Revision)
Proforma for estlMating unit rate of random rubble masonry used in construction of river valley projects (Second Revision) 0 Jan, 2018 Download
75 IS 4858 : 1968

Specification for velocity rods 0 Aug, 2020 Download
76 IS 4877 : 1968

Guide for preparation of estimate for river valley projects 0 Mar, 2021 Download
77 IS 4880 : Part 1 : 1987

(First Revision)
Code of practice for design of tunnels conveying water: Part 1 general design (First Revision) 1 Mar, 2018 Download
78 IS 4880 : Part 2 : 1976

(First Revision)
Code of practice for design of tunnels conveying water: Part 2 geometric design (First .revision) 0 Download
79 IS 4880 : Part 3 : 1976

(First Revision)
Code of practice for design of tunnels conveying water: Part 3 hydrauijc design (First Revision) 0 Download
80 IS 4880 : Part 4 : 1971

Code of practice for design in tunnels conveying water: Part 4 structuml design of concrete lning in rock 2 Download
81 IS 4880 : Part 5 : 1972

Code of practice for design of tunnels conveying water: Part 5 structural design of concrete lining lIu soft strata and soils 2 Download
82 IS 4880 : Part 6 : 1971

Code of practice for design of tunnels conveying water: Part 6 tunnel supports 0 Download
83 IS 4880 : Part 7 : 2014

(First Revision)
Code of practice for design of tunnels conveying water: Part 7 structural design of steel lining (First Revision) 0 Download
84 IS 4890 : 1968

Methods for measurement of suspended sediment in open channels 1 Aug, 2020 Download
85 IS 4986 : 2002

(Second Revision)
Installation of raingauge (Non - Recording Type) and measurement of rain - Code of practice (Second Revision) 0 Sep, 2017 Download
86 IS 4987 : 1994

(First Revision)
Recommendations for establishing network of raingauge stations (First Revision) 0 Feb, 2020 Download
87 IS 4997 : 1968

Criteria for dbsign of hydraulic jump type stilling basins with horizontal and sloping apron 1 Download
88 IS 4999 : 1991

(First Revision)
Recommendations for grouting of pervious soils (First Revisign) 2 Mar, 2018 Download
89 IS 5050 : 1992

(First Revision)
Code ofpractice for design, construction and maintenance of relief wells (First Revision) 1 Apr, 2021 Download
90 IS 5186 : 1994

(First Revision)
Design of chute and side channel spillways - Criteria (First Revision) 1 ---- Download
91 IS 5256 : 1992

(First Revision)
Sealing expansion joints in concrete lining of canals - Code of practice (First Revision) 0 Aug, 2017 Download
92 IS 5313 : 2020

(Second Revision)
Guide for Core Drilling Observations ( Second Revision ) 0 ---- Download
93 IS 5330 : 1984

(First Revision)
Criteria for design of anchor blocks for penstocks with expansion joints (First Revision) 0 Download
94 IS 5477 : Part 1 : 1999

(First Revision)
Fixing the capacities of reservoirs methods: Part 1 general requirements (First Revision) 0 Feb, 2019 Download
95 IS 5477 : Part 2 : 2020

(Second Revision)
Methods for Fixing the Capacities of Reservoirs Part 2 Dead Storage ( Second Revision ) 0 ---- Download
96 IS 5477 : Part 3 : 2002

(First Revision)
Fixing the capacities of reservoirs - Methods: Part 3 live storage (First Revision) 0 Download
97 IS 5477 : Part 4 : 2019

(First Revision)
Methods for fixing the capacities of reservoirs: Part 4 surcharge storage (First Revision) 0 ---- Download
98 IS 5496 : 1993

(First Revision)
Guide for preliminary dimensioning and layout of elbow type draft tubes for surface hydroelectric power stations (First Re Vision) 1 Nov, 2018 Download
99 IS 5497 : 2008

(Second Revision)
Guide to topographical surveys for river valley projects (Second Revision) 0 Download
100 IS 5510 : 1969

Guide for soil surveys for river valley projects 0 Jan, 2021 Download
101 IS 5529 Part 1 : 2013

(Second Revision)
In-situ permeability test Part 1 Test in overburden - Code of practice 0 Download
102 IS 5529 : Part 2 : 2006

(Second Revision)
In - Situ permeability test: Part 2 tests in bedrock (Second Revision) 1 Feb, 2020 Download
103 IS 5542 : 2003

(First Revision)
Guide for storm analysis (First Revision) 0 Feb, 2020 Download
104 IS 5620 : 2020

(Third Revision)
Recommendations for Structural Design Criteria for Low Head Slide Gates ( Third Revision ) 0 ---- Download
105 IS 5690 : 1982

(First Revision)
Guide for laying combination lining for existing unlined canals (First Revision) 1 Nov, 2019 Download
106 IS 5878 : Part 1 : 1971

Code of practice for construction of tunnels conveying water: Part 1 precision survey and setting out 2 Mar, 2018 Download
107 IS 5878 : Part 2 : Sec 1 : 1970

Code of practice for construction of tunnels: Part 2 underground excavation in rock: Sec 1 drilling and blasting 1 Download
108 IS 5878 : Part 2 : Sec 2 : 1971

Code of practice for construction of tunnels: Part 2 underground excavation in rock: Sec 2 ventilation, lighting, mucking and dewatering 1 Download
109 IS 5878 : Part 2 : Sec 3 : 1971

Code of practice for construction of tunnels conveying water: Part 2 underground excavation in rock sectlon:l tunnellins method for steeply inclined tunnels. shafts and und.,..round power houses 2 Download
110 IS 5878 : Part 3 : 1972

Code of practice for construction of tunnels: Part 3 underground excavation in soft strata 1 Download
111 IS 5878 : Part 4 : 1971

Code of practice for construction of tunnels conveying water: Part iv tunnel supports 2 Download
112 IS 5878 : Part 5 : 1976

(First Revision)
Code of pracrIce for construcrIon of tunnels conveying water: Part 5 concrete lining (First Revision) 1 Download
113 IS 5878 : Part 6 : 1975

Code of practice for construction of tunnels: Part 6 steel lining 1 Download
114 IS 5878 : Part 7 : 1972

Code of practice for construction of tunnels conveying water: Part 7 grouting 2 Download
115 IS 5968 : 1987

(First Revision)
Guide for planning and layout of canal system for krrlGatlOn (First Revision) 0 Aug, 2017 Download
116 IS 6004 : 1980

(First Revision)
Criteria for hydraulic design of sediment ejector for irrigation and power channels (First Revision) 0 Nov, 2019 Download
117 IS 6062 : 1971

Method of measurement of flow of water in open channels using standing wave flume - Fall 0 Feb, 2020 Download
118 IS 6063 : 1971

Method of measurement of flow of water in open channels using standing wave flume 0 Feb, 2020 Download
119 IS 6064 : 1971

Specification for sounding and suspension equipment 0 Aug, 2020 Download
120 IS 6066 : 1994

(Second Revision)
Pressure grouting of rock foundations in river valley projects - Recommendations (Second Revision) 1 Download
121 IS 6330 : 2012
ISO 3847:1977
(First Revision)
Liquid flow measurement in open channels by weirs and flumes - End - Depth method for estimation of flow in rectangular channels with a free overfall (First Revision) 0 Jan, 2017 Buy
122 IS 6339 : 2013

(First Revision)
Hydrometry - Sediment in streams and canals - Determination of concentration, particle size distribution and relative density (First Revision) 0 Jan, 2018 Download
123 IS 6512 : 2019

(Second Revision)
Criteria for design of solid gravity dams (Second Revision) 0 Download
124 IS 6518 : 2017

(Second Revision)
Guidelines for control of sediment in reservoirs (Second Revision) 0 ---- Download
125 IS 6522 : 1972

Criteria for design of silt vanes for sediment control in offtaking canals 0 Nov, 2019 Download
126 IS 6524 : 1972

Code of practice for installation and observation of instruments for temperature measurements inside dams : resistance type thermometers 1 Mar, 2018 Download
127 IS 6531 : 1994

(Second Revision)
Canal head regulators criteria for design Second Revision 0 ---- Download
128 IS 6532 : 1972

Code of practice for design, installation, observation and maintenance of uplift pressure pipes for hydraulic structures on permeable foundations 0 Mar, 2020 Download
129 IS 6748 : Part 1 : 1973

Recommendations for watershed management relating to soil conservation: Part 1 agronomic aspects 0 Jan, 2021 Download
130 IS 6926 : 1996

(First Revision)
Diamond core drilling - Site investigation for river valley projects - Code of practice (First revision) 0 Feb, 2020 Download
131 IS 6934 : 2014

(Second Revision)
Hydraulic design of high ogee overflow and orifice spillways - Recommendations (Second Revision) 0 Download
132 IS 6935 : 1973

Method for determination of water level in a bore hole 0 Download
133 IS 6936 : 1992

(First Revision)
Guide for location, selection and hydraulic design of canal escapes (First Revision) 0 Aug, 2017 Download
134 IS 6938 : 2005

(Second Revision)
Design of rope drum and chain hoists for hydraulic gates - Code of practice (Second Revision) 2 Download
135 IS 6939 : 1992

(First Revision)
Methods for determination of evaporation from reservoirs (First Revision) 0 Apr, 2017 Download
136 IS 6955 : 2008

(First Revision)
Subsurface exploration for earth and rockfill dams - Code of practice (First Revision) 0 Feb, 2020 Download
137 IS 6966 : Part 1 : 1989

(First Revision)
Hydraulic design of barrages and weirs - Guidelines: Part 1 alluvial reaches (First Revision) 1 Mar, 2021 Download
138 IS 7112 : 2002

(First Revision)
Criteria for design of cross -: Sec for unlined canals in alluvial soil (First Revision) 0 Aug, 2017 Download
139 IS 7113 : 2003

(First Revision)
Soil - Cement lining for canals - Code of practice (First Revision) 1 Aug, 2017 Download
140 IS 7114 : 1973

Criteria for hydraulic destgn of cross regulators for canals 0 Nov, 2019 Download
141 IS 7207 : 1992

(First Revision)
Criteria for design of generator foundation for hydroelectric powe rstations (First Revision) 0 Nov, 2018 Download
142 IS 7323 : 1994

(First Revision)
Operation of reservoirs - Guidelines (First Revision) 1 Jan, 2018 Download
143 IS 7326 : Part 1 : 1992

(First Revision)
Penstock and turbine inlet butterfly valves for hydropower stations and systems: Part 1 criteria for structural and hydraulic design (First Revision) 0 Download
144 IS 7326 : Part 2 : 1992

(First Revision)
Penstock and turbine inletbutterfly valves for hydro - Power stations and systems: Part 2 guidelines for design and selection of control 0 Download
145 IS 7326 : Part 3 : 1976

Penstock and turbine inlet butterfly valves for hydropower stations and systems: Part 3 recommendations for operations and maintenance 0 Download
146 IS 7331 : 1981

(First Revision)
Code of practice for inspbction and maintenance of cross drainage works (First Revision) 0 Aug, 2017 Download
147 IS 7332 : Part 1 : 1991

(First Revision)
Spherical valves for hydropower stations and systems: Part 1 criteria for structural and hydraulic design (Fl"rsl Revision) 1 Download
148 IS 7332 : Part 2 : 1993

(First Revision)
Spherical valves for hydropower stations and systems: Part 2 selection of control equipment (First Revision) 0 Download
149 IS 7332 : Part 3 : 1994

(First Revision)
Spherical valves for hydropower stations and systems: Part 3 recommendations for operation and maintenance of spherical valves (First Revision) 0 Download
150 IS 7349 : 2012

(Second Revision)
Barrages and weirs - Operation and maintenance - Guidelines (Second Revision) 0 Mar, 2021 Download
151 IS 7356 : Part 1 : 2002

(Second Revision)
Code of practice for installation, maintenance and observation of instruments for pore pressure measurements in earth dams and rockfill dams - Part 1 : porous 1 May, 2021 Download
152 IS 7356 : Part 2 : 2003

(Second Revision)
Installation, observation and maintenance of instruments for pore pressure measurements in earth and rockfill dams - Code of practice: Part 2 twin tube hydraulic piezometers (Second Revision) 0 Mar, 2018 Download
153 IS 7357 : 1974

Code of practice for structural design of surge tanks 0 Download
154 IS 7365 : 2010

(Second Revision)
Criteria for hydraulic design of bucket type energy dissipators (Second Revision) 0 Download
155 IS 7396 : Part 1 : 1985

(First Revision)
Criteria for hydraulic design of surge tanks: Part 1 simple, restricted orifice and differential surge tanks (First Revision) 0 Download
156 IS 7396 : Part 2 : 1985

(First Revision)
Criteria for hydraulic design of surge tanks: Part 2 tail race surge tanks (First Revision) 0 Download
157 IS 7396 : Part 3 : 1990

Criteria for hydraulic design of surge tanks: Part 3 special surge tanks 0 Download
158 IS 7396 : Part 4 : 1983

Criteria for hydraulic design of surge tanks: Part 4 multiple surge tanks 0 Download
159 IS 7418 : 1991

(First Revision)
Criteria for design of spiral casing (Concrete And Steel) (First Rewsion) 0 Download
160 IS 7422 : Part 1 : 1974

Symbols and abbreviations for use in geological Maps: Section and subsurface exbloratory logs: Part 1 abbreviations 0 Download
161 IS 7422 : Part 2 : 1974

Symbols and abbreviations for use in geological maps: Section and subsurface exploratory logs: Part 2 igneous rocks 0 Download
162 IS 7422 : Part 3 : 1974

Symbols and abbreviations for use in geological maps: Sections and subsurface exploratory logs: Part 3 sedimentary rocks 0 Download
163 IS 7422 : Part 4 : 1985

Symbols and abbreviations for use in geological maps: Sections and subsurface exploratory logs: Part 4 metamorphic rocks 0 Download
164 IS 7422 : Part 5 : 1992

Symbols and abbreviations for use in geological maps: Sections and sub - Surface exploratory logs: Part 5 line symbols for formation contacts and structural features 0 Feb, 2020 Download
165 IS 7436 : Part 1 : 1993

(First Revision)
Guide fort ypes of measurements for structures in river valley projekts and critbria for choice and location of measuring instruments: Part 1 for earth and rockfill dams (First Revision) 0 Mar, 2018 Download
166 IS 7436 : Part 2 : 2019

(Second Revision)
Guide for types of measurements for structures in river valley projects and criteria for choice and location of measuring instrument: Part 2 concrete and masonry dams (Second Revision) 1 ---- Download
167 IS 7495 : 1974

Criteria for hydraulic design of silt selective head regulator for sediment control in offtaking canals 0 Download
168 IS 7500 : 2000

(First Revision)
Code of practice for installation and observation of cross arms for measurement of internal vertical movement in earth dams (First Revision) 0 Mar, 2020 Download
169 IS 7560 : 1974

Guidelines for allocation of cost among different purposes of river valley projects 0 Mar, 2019 Download
170 IS 7563 : 1986

(First Revision)
Code of practice for structural design of cut and cover concrete conduits (First Revision) 1 Download
171 IS 7718 : 2018

(Second Revision)
Recommendations for inspection, testing and maintenance of fixed wheel and slide gate (Second Revision) 0 ---- Download
172 IS 7720 : 1991

(First Revision)
Criteria for investigation, planning and layout for barrages and weirs (First Revision) 0 Mar, 2021 Download
173 IS 7784 : Part 1 : 2013

(Second Revision)
Design of cross drainage works - Code of practice: Part 1 general features (Second Revision) 0 Nov, 2019 Download
174 IS 7784 : Part 2 : Sec 1 : 1995

(First Revision)
Design of cross drainage works code of practice: Part 2 specific requirements: Sec 1 aqueducts (First Revision J 0 Download
175 IS 7784 : Part 2 : Sec 2 : 2000

(First Revision)
Code of practice for design of cross drainage works: Part 2 specific requirements: Sec 2 superpassages (First Revision) 1 Oct, 2019 Download
176 IS 7784 : Part 2 : Sec 3 : 1996

(First Revision)
Code of practice for design of cross drainage works: Part 2 specific requirements: Sec 3 canal slrphons (First Revision) 0 Apr, 2021 Download
177 IS 7784 : Part 2 : Sec 4 : 1999

(First Revision)
Design of cross drainage works - Code of practice: Part 2 specific requirements: Sec 4 level crossings (First Revision) 0 Download
178 IS 7784 : Part 2 : Sec 5 : 2000

(First Revision)
Code of practice for design of cross drainage works part2 specific requirements: Sec 5 syphon aqueducts (First Revision) 1 Nov, 2019 Download
179 IS 7871 : 1975

Criteria for hydraulic design of groyne walls (Curved Wing) for sediment distribution at offtake points in a canal 0 Mar, 2019 Download
180 IS 7873 : 1975

Code of practice for limb concrete lining for canals 1 Mar, 2019 Download
181 IS 7880 : 1975

Criteria for hydraulic design qf skimming platform for sediment control in offtaking canal 0 Nov, 2019 Download
182 IS 7894 : 1975

Code of practice for stability analysis of earth dams 1 Download
183 IS 7916 : 1992

(First Revision)
Open power channels - Code of practice (First Revision) 0 Mar, 2018 Download
184 IS 7986 : 1976

Code of practice for canal outlets 1 Nov, 2019 Download
185 IS 8226 : 2017

(First Revision)
Installation and observation of base plate apparatus for measurement of foundation settlement in embankments - Code of practice (First Revision) 0 ---- Download
186 IS 8237 : 1985

(First Revision)
Code of practice for protection of slope for reservoir embankment (First Reoision) 0 Feb, 2017 Download
187 IS 8282 : Part 1 : 1976

Code of practice for installation, maintenance and observations of pore pressure measuring devices in concrete and masonry dams: Part 1 electrical resistance type cell 0 Mar, 2018 Download
188 IS 8282 : Part 2 : 1996

Installation, maintenance and observations of pore pressure measuring devices in concrete and masonry dams - Code of practice: Part 2 vibrating wire type cell 0 Mar, 2020 Download
189 IS 8389 : 2003

(Second Revision)
Installation and use of raingauges, recording - Code of practice (Second Revision) 0 Download
190 IS 8408 : 1994

(First Revision)
Planning and design of groynes in alluvial river - Guidelines (First Revision) 0 Mar, 2021 Download
191 IS 8414 : 2014

(First Revision)
Guidelines for design of under seepage control measures for earth and rockfill dams (First Revision) 1 Mar, 2019 Download
192 IS 8605 : 1977

Code of practice for construction of masonry in dams 1 Mar, 2019 Download
193 IS 8826 : 1978

Guidelines for design of large earth and rockfill dams 1 Download
194 IS 8835 : 1978

Guidelines for planning and design of surface drains 0 Nov, 2019 Download
195 IS 9097 : 1979

Guide for laying lining of canals with hot bitumen or bituminous felts 0 Mar, 2019 Download
196 IS 9108 : 2020
ISO 1438:2017
(Second Revision)
Hydrometry — Open Channel Flow Measurement Using Thin-Plate Weirs ( Second Revision ) 0 ---- Buy
197 IS 9115 : 2002

(First Revision)
Method for estimation of incompressible fluid flow in closed conduits by bend meters (first Revision) 0 Sep, 2017 Download
198 IS 9116 : 2002

(First Revision)
Water stage recorder (Float Type) - Specification (First Revision) 0 Sep, 2017 Download
199 IS 9118 : 1979

Method for measurement of pressure by means of manometers 1 Aug, 2020 Download
200 IS 9119 : 1979

Method of flow estimation by jet characteristics (Approximate Method) 0 Mar, 2021 Download
201 IS 9120 : 1979

Guidelines for planning, layout and design of cavities in underground hydroelectric power stations 0 Nov, 2018 Download
202 IS 9296 : 2001

(First Revision)
Inspection and maintenance of dams and appurtenant structures - Guidelines (First Revision) 0 Mar, 2019 Download
203 IS 9297 : 1979

Recommendations for lighting, ventilation and other facilities inside dams 2 Mar, 2019 Download
204 IS 9349 : 2006

(Second Revision)
Recommendations for structural design of medium and high head slide gates (Second L?evision) 0 Download
205 IS 9401 : Part 1 : 1999

(First Revision)
Method of measurement of works in river valley projects (Dams And Appurtenant Structures): Part 1 excavation for foundation (First Revision) 0 Mar, 2021 Download
206 IS 9401 : Part 2 : 2003

(First Revision)
Method of measurement of works in river valley projects (Dams And Appurtenant Structures): Part 2 dewatering (First Revision) 0 Jan, 2018 Download
207 IS 9401 : Part 3 : 2003

(Second Revision)
Method of measurement of works in river valley projects (Dams And Appurtenant Structures): Part 3 grouting (Second Revision) 0 Jan, 2018 Download
208 IS 9401 : Part 4 : 2018

(First Revision)
Method of measurement of works in river valley projects (dams and appurtenant structures): Part 4 Concrete work 0 ---- Download
209 IS 9401 : Part 5 : 2014

(First Revision)
Method of measurement of works in river valley projects (Dams And Appurtenant Structures): Part 5 masonry (First Revision) 0 May, 2019 Download
210 IS 9401 : Part 6 : 2013

(First Revision)
Method of measurement of works in river valley projects (Dams And Appurtenant Structures): Part 6 ventilation pipes and other embedded materials (First Revision) 0 Jan, 2018 Download
211 IS 9401 : Part 7 : 2013

(First Revision)
Method of measurement of works in river valley projects (Dams And Appurtenant Structures): Part 7 joints (First Revision) 0 Jan, 2018 Download
212 IS 9401 : Part 8 : 1985

Method of measurement of works in river valley projects (Dams And Appurtenant Structures): Part 8 instrumentation 1 Feb, 2020 Download
213 IS 9401 : Part 9 : 1987

Method of measurement of works in river valley projects (Dams And Appurtenant Structures): Part 9 lining 0 Jul, 2017 Download
214 IS 9401 : Part 10 : 1990

Method ofmeasurementofworks in river valley projects(Dams - And Appurtenant Structures): Part 10 formwork 0 Jul, 2017 Download
215 IS 9401 : Part 11 : 1998

(First Revision)
Methods of measurement of work in river valley projects (Damsand Appurtenantstructures): Part 11 diaphragm walls (First Revision) 0 Jul, 2017 Download
216 IS 9401 : Part 12 : 1992

Method of measurement of works in river valley projects (Dams And Appurtenant Structures) 1 Jul, 2017 Download
217 IS 9401 : Part 13 : 1992

Method of measurement of works in river valley projects (Dams And Appurtenant Structures): Part 13 earth and fill dams 0 Jul, 2017 Download
218 IS 9401 : Part 14 : 1992

Method of measurement of works in river valley projects (Damsand Appurtenantstructures): Part 14 canal works 0 Jul, 2017 Download
219 IS 9401 : PART 15 : 2010

Method of measurement of works in river valley projects (Dams And Appurtenant Structures): Part 15 investigation works - Drilling of bore holes and exploratory drifting and logging 0 Feb, 2020 Download
220 IS 9401 : Part 16 : 1999

Method of measurement of works in river valley projects (Dams And Appurtenant Structures): Part 16 tunneling 0 Mar, 2021 Download
221 IS 9401 : Part 17 : 1999

Method of measurement of works in river valley projects (Dams And Appurtenant Structures): Part 17 hydromechanical and related metal works 0 Mar, 2021 Download
222 IS 9401 : Part 18 : 2000

Method of measurement of work in river valley projects (Dams And Appurtenant Structures): Part 18 sheet pilcng 0 Mar, 2021 Download
223 IS 9401 : Part 19 : 2009

Method of measurement of works in river valley projects (Dams And Appurtenant Structures): Part 19 electro - Mechanical works 0 Jan, 2018 Download
224 IS 9401 : Part 20 : 2013

Method of measurement of works in river valley projects (Dams And Appurtenant Structures): Part 20 protection works 0 Jan, 2018 Download
225 IS 9429 : 1999

(First Revision)
Drainage system for earth and rockfill dams - Code of practice (First Revision) 0 Download
226 IS 9447 : 1980

Guidelines for assessment of seepage losses from canals by analytical method 0 Apr, 2021 Download
227 IS 9451 : 1994

(Second Revision)
Guidelines for lining of canals in expansive soils (Second Revision) 3 Nov, 2019 Download
228 IS 9452 : Part 1 : 1993

(First Revision)
Measurement of seepage losses from canals - Code of practice: Part 1 Ponding method 0 Mar, 2019 Download
229 IS 9452 : Part 2 : 1980

Code of practice for measurement of seepage losses from canals: Part 2 inflow - O - utflow method 0 Mar, 2019 Download
230 IS 9452 : Part 3 : 1988

Code of practice for measurement of seepage losses from canals: Part 3 seepage meter method 0 Mar, 2019 Download
231 IS 9461 : 1980

Guidelines for data required for design of temporary river diversion worrs 1 Mar, 2021 Download
232 IS 9698 : 1995

(First Revision)
Lining of canals with polyethylene film - Code of practice (First Revision) 1 Download
233 IS 9761 : 1995

(First Revision)
Hydropower intakes - Criteria for hydraulic design (First Revision) 0 Download
234 IS 9795 : Part 1 : 1981

Guidelines for the choice of the type of diversion works: Part 1 coffer dams 1 Mar, 2021 Download
235 IS 9913 : 2000

(First Revision)
Code of practice for construction of cross drainage works (First Revision) 1 Nov, 2019 Download
236 IS 10021 : 2000

(First Revision)
Guidelines for de - Icing system for hydraulic installations (First Revision) 0 Download
237 IS 10060 : 2013

(First Revision)
Geotechnical investigation for power house sites - Code of practice (First Revision) 0 Download
238 IS 10061 : 1991

(First Revision)
Proforma for analysis of unit rate of excavation of tunnels by cyclic drilling and blasting (First Revision) 0 Mar, 2021 Download
239 IS 10062 : 1991

(First Revision)
Proforma for analysis of unit rate of quarryinc rock by mechanical means (First Revision 0 Mar, 2021 Download
240 IS 10084 : Part 1 : 1982

Criteria for design of diversion works: Part 1 coffer dams 0 Mar, 2021 Download
241 IS 10084 : Part 2 : 2014

Design of diversion works - Criteria: Part 2 diversion channel and open cut or conduit in the body of dam (First Revision) 0 Download
242 IS 10096 : Part 1 : Sec 1 : 2014

(First Revision)
RecommendanOns for inspection; testing and maintenance of radial gates and their hoists: Part i inspection, testing and assembly at the manufacturing stage: Sec i gates 0 Download
243 IS 10096 :Part 1 : Sec 2 : 2014

(First Revision)
Recommendations for inspection, testing and maintenance of radial gates and rope drum hoists: Part 1 inspection, testing and assembly at the manufacturing stage: Sec 2 rope drum hoists (First Revision) 0 Jun, 2019 Download
244 IS 10096 : Part 2 : 1983

Recommendations for inspection, testing and maintenance of radial gates and their hoists: Part 2 inspection, testing and assembly at the time of erection 2 Download
245 IS 10096 : Part 3 : 2002

(Second Revision)
Recommendations for inspection, testing and maintenance of radial gates and rope drum hoists: Part 3 after erection (Second Revision) 1 Download
246 IS 10135 : 1985

(First Revision)
Code of practice for drainage system for gravity dams, their foundations and abutments (First Revision) 0 Mar, 2019 Download
247 IS 10137 : 2015

(First Revision)
Guidelines for selection of spillways and energy dissipators (First Revision) 0 Download
248 IS 10160 : 1982

Proforma for analysis of unit rate of earthwork used in construction of river valley projects 0 Mar, 2021 Download
249 IS 10210 : 1993

(First Revision)
CrlTeria for design of hydraulic hoists for gates (First Revision) 1 Download
250 IS 10290 : 1982

Code of practice for photogeological interpretation and mapping of river valley project sites 0 Download
251 IS 10334 : 1982

Code of practice for selection, splicing, installation and providing protection to the open ends of cables used for connecting resistance type measuring devices in concrete and masonry dams 0 Mar, 2020 Download
252 IS 10336 : 1982

Guidelines for preparation of completion reports of multipurpose river valley projects 0 Jan, 2021 Download
253 IS 10386 : Part 1 : 2013

(First Revision)
Safety code for construction, operation and maintenance of river valley projects: Part 1 general aspects (First Revision) 0 Jan, 2018 Download
254 IS 10386 : Part 2 : 2013

(First Revision)
Safety code for construction, operation and maintenance of river valley projects: Part 2 amenities, protective clothing and equipment (First Revision) 0 Jan, 2018 Download
255 IS 10386 : Part 3 : 2014

Safety code for construction, operation and maintenance of river valley projects: Part 3 plant and machinery (First Revision) 0 Download
256 IS 10386 : Part 4 : 2013

Safety code for construction, operation and maintenance of river valley projects: Part 4 handling, transportation and storage of explosives (First Revision) 0 Jan, 2018 Download
257 IS 10386 : Part 5 : 2014

(First Revision)
Safety code for construction, operation and maintenance of river valley projects: Part 5 electrical aspects (First Revision) 0 Download
258 IS 10386 : Part 6 : 1983

Safety code for construction, operation and maintenance of river valley projects: Part 6 construction 1 Feb, 2020 Download
259 IS 10386 : Part 7 : 2020

(First Revision)
Construction, Operation and Maintenance of River Valley Projects — Safety Code Part 7 Fire Safety Aspects ( First Revision ) 0 ---- Download
260 IS 10386 : Part 8 : 1995

Safety code for construction, operation and maintenance of riveir valley projects: Part 8 open excavation 1 Feb, 2020 Download
261 IS 10386 : Part 9 : 1998

Safety codefo roperationand maintenance of river valley projects: Part 9 canals and cross drainage works 1 Jan, 2018 Download
262 IS 10386 : Part 10 : 1983

Safety code for construction, operation and maintenance of river valley projects: Part 10 Storage, handling, detection and safety measures for gases, chemicals and flammable liquids 0 Feb, 2020 Download
263 IS 10386 : PART 11 : 2012

Safety Code for Construction, Operation and Maintenance of River Valley Projects: Part 11 Underground Excavation 0 Download
264 IS 10421 : 1983

Proforma for analysis of unit rate of shuttering/formwork for concrete items 0 Mar, 2021 Download
265 IS 10430 : 2000

(First Revision)
Criteria for design of lined canals and guidance for selection of type of lining (First Revision) 1 Nov, 2019 Download
266 IS 10434 : Part 1 : 2003

(First Revision)
Installation, maintenance and observation of deformation measuring devices in concrete and masonry dams - Guidelines: Part 1 resistance type jointmeters (First Revision) 0 Mar, 2018 Download
267 IS 10434 : Part 2 : 1996

Guidelines for installation, maintenance and observation of preformation measuring devices in concrete and mas - Onry dams: Part 2 vibrating, wire type jointmeter 1 Mar, 2020 Download
268 IS 10635 : 2014

(Second Revision)
Freeboard requirement in dams - Guidelines (Second Revision) 0 Download
269 IS 10646 : 1991

(First Revision)
Canal linings - Cementconcrete tiles - Specification (First Revision) 3 Nov, 2019 Download
270 IS 10751 : 1994

(First Revision)
Planning and design of guide banks for alluvial rivers - Guidelines (First Revision) 0 Mar, 2021 Download
271 IS 10777 : 1994

(First Revision)
Proforma for analysis of unit rate of rock excavation by mechanical means including blasting for open excavation (First Revision) 0 Mar, 2021 Download
272 IS 10788 : Part 1 : 1984

Code of practice for construction of diversion works: Part 1 cellular coffer dams 0 Mar, 2021 Download
273 IS 10824 : 1984

Code of practice for amenities in hydroelectric power houses 0 Mar, 2021 Download
274 IS 11105 : 2004

(First Revision)
Design and Construction of Tunnel Plugs - Code of Practice 0 Download
275 IS 11130 : 1984

Criteria for structural design of barrages and whrs 1 Mar, 2021 Download
276 IS 11150 : 1993

(First Revision)
Construction of concrete barrages - Code of practice (First Revision) 1 Mar, 2021 Download
277 IS 11155 : 2019

(Second Revision)
Construction of spillways and similar overflow structures - Code of practice (Second Revision) 0 ---- Download
278 IS 11216 : 1985

Code of practice for permeability test for masonry during and after construction 0 Mar, 2019 Download
279 IS 11223 : 1985

Guidelines for fixing spillway capacity 2 Download
280 IS 11228 : 1985

Recommendations for design of screw hoists for hydraulic gates 0 Download
281 IS 11293 : 2018

Guidelines for the design of grout curtains for earth and rock fill dams, masonry dams and concrete gravity dams 0 ---- Download
282 IS 11293 : Part 1 : 1985

Guidelines for the design of grout curtains: Part 1 earth and rockfill dams 2 Download
283 IS 11293 : Part 2 : 1993

Guidelines for the design of grout curtains: Part 2 masonry and concrete gravity dams 1 Apr, 2021 Download
284 IS 11385 : 2008

(First Revision)
Subsurface exploration for canals and cross drainage works - Code of practice (First Revision) 0 Feb, 2020 Download
285 IS 11388 : 2012

(Second Revision)
Recommendations for design of trash racks for intakes (Second Revision) 0 Download
286 IS 11399 : Part 1 : 1985

Guidelines for estimating output norms of items of work in construction of river valley projects pzyxwvutsrqponmlkjihgfedcbaZyxwvutsrqponmlkjihgfedcba: Part 1 earthwork excavation 2 Mar, 2021 Download
287 IS 11485 : 2014

(First Revision)
Criteria for design of sluices in concrete and masonry dams (First Revision) 0 Download
288 IS 11527 : 2013

(First Revision)
Structural design of energy dissipators for spillways - Criteria (First Revision) 0 Download
289 IS 11532 : 1995

(First Revision)
Construction and maintenance of river embankments (Levees) - Guidelines (First Revision) 1 Mar, 2021 Download
290 IS 11570 : 1985

Criteriafor hydraulic design of irrigation intake structures 1 Nov, 2019 Download
291 IS 11590 : 1995

(First Revision)
Guidelines for working out unit rate cost of the construction equipment used for river valley projects (First Revision) 0 Mar, 2021 Download
292 IS 11625 : 1986

Criteria for hydraulic design of penstocks 0 Download
293 IS 11638 : 2000

(First Revision)
Proforma for estimation of unit rate of construction of embankment by mechanical means (First Revision) 0 Mar, 2021 Download
294 IS 11639 : Part 1 : 1986

Criteria for struc design of penstocks: Part 1 surface penstocks 1 Download
295 IS 11639 : Part 2 : 1995

Structural destgn of penstocks - Criteria: Part 2 buried/embedded penstocks in rock 0 Download
296 IS 11639 : Part 3 : 1996

Structural design of penstock - Criteria: Part 3 specials for penstocks 4 Mar, 2018 Download
297 IS 11772 : 2009

(First Revision)
Design of drainage arrangements ofenergy dissipators and training walls of spillways - Guidelines (First Revision) 0 Mar, 2019 Download
298 IS 11793 : 1986

Guidelines for design of float driven hoisting mechanism for automatic gated control 0 Download
299 IS 11809 : 1994

(First Revision)
Lining for canals by stone masonry - Code of practice (First Revision) 2 Nov, 2019 Download
300 IS 11855 : 2017

(Second Revision)
Design and use of rubber seals for hydraulic gates - Recommendations (Second Revision) 0 ---- Download
301 IS 11973 : 1986

Code of practice for treatment of rock foundations, core and abutment contacts with rock, for embankment dams 1 Apr, 2021 Download
302 IS 12094 : 2018

(Second Revision)
Planning and design of river embankments (Levees) - Guidelines (Second Revision) 0 ---- Download
303 IS 12169 : 1987

Criteria for design of small embankment dams 1 Download
304 IS 12182 : 1987

Guidelines for determination of effects of sedimentation in planning and performance of reservoirs 0 Feb, 2017 Download
305 IS 12200 : 2001

(First Revision)
Provision of water - Stops at transverse contraction joints in masonry and concrete dams - Code of practice (First Revision) 0 Mar, 2019 Download
306 IS 12331 : 1988

General requirements for canal outlets 1 Aug, 2017 Download
307 IS 12379 : 1988

Code of practice for lining of water - Courses and field channels 2 Aug, 2017 Download
308 IS 12584 : 1989

Bentonite for grouting in civil engineering works - Specification 1 Download
309 IS 12633 : 1989

First filling and emptying of pressure tunnels - Guidelines 2 Mar, 2018 Download
310 IS 12720 : 2004

(Second Revision)
Criteria for structural design of spillway training walls and divide walls (Second Revision) 0 Download
311 IS 12731 : 1989

Hydraulic design of impact type energy dissipators - Recommendations 0 Download
312 IS 12752 : 2013
ISO 8368:1999
(First Revision)
Hydrometric determinations - Flow measurements in open channels using structures - Guidelines for selection of structure (First Revision) 0 Jan, 2018 Buy
313 IS 12800 : Part 1 : 1993

Guideltnbs for selectjon of turbines, preliminary dimensioning and layout of surface hydro - Electric powerhouses: Part 1 medium and large power houses 0 Nov, 2018 Download
314 IS 12800 : Part 2 : 1989

Guidelines For Selection Of Turbines, Preliminary Dimensioning And Layout Of Surface Hydro-electric Power House Part 2 Pumped Storage Power Houses 2 Mar, 2021 Download
315 IS 12800 : Part 3 : 1991

Guidelines for selection of hydraulic turbine,preliminary dimensioning and layout of surface hydroelectric power houses: Part 3 small, mini 0 Nov, 2018 Download
316 IS 12804 : 1989

Criteria for estimation of aeration demand for spillway and outlet structures 0 Download
317 IS 12837 : 1989

Hydraulic turbines for medium and large power houses - Guidelines for selection 0 Oct, 2016 Download
318 IS 12892 : 1989

Safety of barrage and weir structures - Guidelines 1 Mar, 2021 Download
319 IS 12926 : 1995

(First Revision)
Construction and maintenance of guide banks in alluvial rivers - Guidelines (First Revision) 0 Mar, 2021 Download
320 IS 12949 : 2013

(First Revision)
Installation, maintenance and observation of instruments for pore pressure measurements in earth and rockfill dams - Vibrating wire type electrical pore pressure cell - Code of practice (First Revision) 0 Mar, 2018 Download
321 IS 12966 : Part 1 : 1992

Code of practice for galleries and other openings in dams: Part 1 general requirements 0 Download
322 IS 12966 : Part 2 : 1990

Code of practice for galleries and other openings in dams: Part 2 structural design 0 Mar, 2019 Download
323 IS 12967 : Part 1 : 1990

Analysis of hydraulic transients in hydro - Electric and pumping plants - Code of practice: Part 1 criteria for analysis 0 Download
324 IS 13028 Part 1 : 2014

(First Revision)
Guidelines for integrated planning, development and management of river basins: Part 1 overall planning (First Revision) 0 Aug, 2019 Download
325 IS 13041 : 2013

Recommendations for inspection, testing and maintenance of hydraulic hoist (After Erection) (First Revision) 0 Download
326 IS 13048 : 1991

Recommendations for hydraulic design of duck bill spillways 0 Download
327 IS 13073 : Part 1 : 2002

(First Revision)
Installation, maintenance and observation of displacement measuring devices in concrete and masonry dams - Code of practice: Part 1 deflection measurement using plumb lines (First Revision) 0 Mar, 2018 Download
328 IS 13073 : Part 2 : 2000

Code of practice for installation, maintenance and observation of displacement measuring devices for concrete and masonry dams: Part 2 geodetic observation - Crest collimation 0 Mar, 2020 Download
329 IS 13083 : 2017
ISO 4377:1990
(First Revision)
Liquid flow measurement in open channels ? flat - V weirs 0 ---- Buy
330 IS 13084 : 1991
ISO 4374:1990
Liquid flow measurement in open channels - Round - Nose horizontal broad - Crested weirs 0 Sep, 2017 Buy
331 IS 13142 : 1991

Proforma for reporting progress of benefits created by river valley projects 2 Mar, 2019 Download
332 IS 13143 : 1991

Jointsin concreteliningofcanals - Sealing compound - Specification 0 Mar, 2019 Download
333 IS 13144 : 1991

Recommendations for provision of facilities outside the dams 0 Mar, 2019 Download
334 IS 13195 : 1991

Preliminary design, operation and maintenance of protection works downstream of spillways - Guidelines 0 Download
335 IS 13216 : 1991

Code of practice for geological exploration for reservoir sites 2 Download
336 IS 13218 : Part 1 : 1992

Proforma for reporting progress during construction for river valley projects: Part 1 irrigation works 0 Mar, 2019 Download
337 IS 13218 : Part 2 : 1991

Proforma for reporting progress during construction for river valley projects: Part 2 hydel works 0 Mar, 2019 Download
338 IS 13218 : Part 3 : 1992

Proforma for reporting progress during construction for river valley projbcts: Part 3 flood control 0 Mar, 2019 Download
339 IS 13232 : 1992

Installation, maintenance and observations of electrical strain measuring devices in concrete dams - Code of practice 0 Mar, 2018 Download
340 IS 13371 : 2014

(First Revision)
Hydrometry - Calibration of current - Meters in straight open tanks (First Revision) 0 Buy
341 IS 13418 : 1992

Proforma for analysis of unit rate of grouting used in river valley projects 0 Jan, 2018 Download
342 IS 13419 : 1992

Proforma for analysis of unit rate of shotcreting/guniting used in river ivalley projects 0 Jan, 2018 Download
343 IS 13495 : 1992

Design of sediment excluders - Guidelines 0 Mar, 2018 Download
344 IS 13551 : 1992

Structural design of spillway pier and crest - Criteria 0 Mar, 2019 Download
345 IS 13578 : 2008

(First Revision)
Subsurface exploration forbarrages and weirs - Code of practice (First Revision) 0 Feb, 2020 Download
346 IS 13591 : 2019

(First Revision)
Criteria for design of lifting beams (First Revision) 0 ---- Download
347 IS 13623 : 1993

Criteria for choice of gates and hoists 1 Download
348 IS 13645 : 1993

Guniting the upstream face of masonry dams - Guidelines 1 Mar, 2019 Download
349 IS 13665 : 2017
ISO 6421 : 2012
(First Revision)
Hydrometry - Methods for assessment of reservoir sedimentation (First Revision) 0 ---- Buy
350 IS 13668 : 1993

Guidelines for fixing intensity of irrigation 0 Mar, 2019 Download
351 IS 13739 : 1993

Guidelines for estimation of flood damages 0 Mar, 2019 Download
352 IS 13877 : 1993

Planning and design of fish pass - Guidelines 0 Mar, 2021 Download
353 IS 13912 : 1993

Closure of diversion channel and open cut or conduit inthe body of the dam - Code of practice 1 Download
354 IS 13969 : Part 11 : 2018
Identical
Water quality - Sampling: Part 11 guidance on sampling of groundwaters (First Revision) 0 ---- Buy
355 IS 14177 : 1994

Guidelines for painting system for hydraulic gates and hoists 0 Feb, 2019 Download
356 IS 14248 : 1995

Guidelines for instrumentation of barrages and weirs 0 Mar, 2020 Download
357 IS 14262 : 1995

Planning and design of revetment - Guidelines 0 Mar, 2021 Download
358 IS 14278 : 1995

Stress measuring devlCes ln concrete and masonry dams - Installation, commissioning and observations - Code of practice 1 Mar, 2020 Download
359 IS 14330 : 1996

Ground water investigation for hydraulic structures - Guidelines 0 Feb, 2020 Download
360 IS 14343 : 1996

Choice of grouting, materials for alluvial grouting - Guidelines 1 Apr, 2021 Download
361 IS 14344 : 1996

(First Revision)
DESIGN AND CONSTRUCTION OF DIAPHRAGMS FOR UNDER SEEPAGE CONTROL CODE OF PRACTICE 0 ---- Download
362 IS 14359 : 2014
ISO 4366:2007
(First Revision)
Hydrometry - Echo sounders for water depth measurements (First Revision) 0 Buy
363 IS 14371 : 2016
ISO 9826:1992
(First Revision)
Measurement of liquid flow in open channels - Parshall and saniiri flumes (First Revision) 0 Mar, 2021 Buy
364 IS 14476 : Part 1 to 9 : 1998

Test pumping of water wells - Code of practice 0 Jan, 2018 Download
365 IS 14519 : 1998

Guidelines for fixing rates for irrigation water 0 Mar, 2019 Download
366 IS 14573 : 2014
ISO 1088:2007
(First Revision)
Hydrometry - Velocity - Area methods using current - Meters - Collection and processing of data for determination of uncertainties in flow measurement (First Revision) 0 Buy
367 IS 14574 : 1998
ISO 4371:1984
Measurement of liquid flow in open channels by weirs and flumes - End depth method for estlMation of flow in non - Rectangular channels with a free overfall (Approximate Method) 0 Feb, 2020 Buy
368 IS 14590 : 1998

Proforma for analysis of unit rate of dewatering 0 Jan, 2018 Download
369 IS 14591 : 1999

Temperature control of mass concrete for dams - Guidelines 0 Download
370 IS 14592 : Part 1 : 1998

Planningand design ofbarrage powerhouses - Guidelines: Part 1 investigation, planning and layout 0 Download
371 IS 14615 : Part 1 : 2018
ISO 5167-1:2003
(First Revision)
Measurement of fluid flow by means of pressure differential devices inserted in circular crossSection conduits running full: Part 1 : general principles and requirements (First Revision) 0 ---- Buy
372 IS 14615 : Part 2 : 2018
ISO 5167(Part 1):2003
Measurement of fluid flow by means of pressure differential devices inserted in circular cross -: Sec conduits running full: Part 2 orifice plates 0 ---- Buy
373 IS 14615 : Part 3 : 2018
ISO 5167(Part 2):2003
Measurement of fluid flow by means of pressure differential devices inserted in circular crossSection conduits running full: Part 3 nozzles and venturi nozzles 0 ---- Buy
374 IS 14615 : Part 4 : 2018
ISO 5167(Part 4):2003
Measurement of fluid flow by means of pressure differential devices inserted in circular crossSection conduits running full: Part 4 venturi tubes 0 ---- Buy
375 IS 14615 : Part 5 : 2019
ISO 5167-5:2016
Measurement of Fluid Flow by Means of Pressure Differential Devices Inserted in Circular Cross-Section Conduits Running Full Part 5 Cone Meters 0 ---- Buy
376 IS 14654 : 1999

Minimising evaporation losses from reservoirs - Guidelines 0 Feb, 2019 Download
377 IS 14673 : 2014
ISO 4360:2008
(First Revision)
Hydrometry - Open channel flow measurement using triangular profile weirs (First Revision) 0 Buy
378 IS 14690 : 1999

Quality control during construction of earth and rockfill dams - Recommendations 0 Download
379 IS 14749 : 2000

Proforma for analysis of unit rate of underground excavation by cyclic drilling and blasting 0 Mar, 2021 Download
380 IS 14750 : 2014

(First Revision)
Code of practice for installation, maintenance and observation of seepage measuring devices for concrete/masonry and earth/ rockfill dams (First Revision) 0 Mar, 2020 Download
381 IS 14793 : 2013

(First Revision)
Installation, maintenance and observation of the instruments for vibration studies other than earthquakes on hydraulic structures and machines - Code of practice (First Revision) 0 Mar, 2018 Download
382 IS 14815 : 2000

Design flood for river diversion works - Guidelines 0 Mar, 2021 Download
383 IS 14835 : 2000

Guidelines for estimating unit rate of items of works in construction of rubble masonry for river valley projects 0 Mar, 2021 Download
384 IS 14869 : 2016
ISO 4359:2013
(Second Revision)
Flow measurement structures - Rectangular, trapezoidal and u - Shaped flumes (First Revision) 1 Mar, 2021 Buy
385 IS 14954 : 2001

Distress and remedial measures in earth and rockfill dams - Guidelines 0 Mar, 2021 Download
386 IS 14955 : 2001

Guidelines for hydraulic model studies of barrages and weirs 0 Mar, 2021 Download
387 IS 14973 : 2019
ISO 3966: 1997
(First Revision)
Measurement of fluid flow in closed conduits - Velocity area method using pitot static tube (First Revision) 0 ---- Buy
388 IS 14974 : 2018
ISO 3846: 2008
(First Revision)
Hydrometry - Open channel flow measurement using rectangular broad crested weirs (First Revision) 0 ---- Buy
389 IS 14975 : 2001
ISO 9827:1994
Measurement of liquid flow in open channels - Streamlined triangular profile weirs 0 Jan, 2017 Buy
390 IS 15058 : 2002

PVC water - Stops at transverse contraction joints for use in masonry and concrete dams - Specification 1 Mar, 2019 Download
391 IS 15087 : 2001

Plannig and design of drainage in irrigation projects - Guidelines 0 Mar, 2019 Download
392 IS 15117 : 2018
ISO 4375:2014
(First Revision)
Hydrometry - Cableway systems for stream gauging (First Revision) 0 ---- Buy
393 IS 15118 : 2014
ISO 4373:2008
(First Revision)
Hydrometry - Water level measuring devices (First Revision) 0 Buy
394 IS 15119 : Part 2 : 2014
ISO 1100-2:2010
(First Revision)
Hydrometry - Measurement of liquid flow in open channels: Part 2 determination of the stage - Discharge relationship (First Revision) 0 Buy
395 IS 15122 : 2014
ISO 2425:2010
(First Revision)
Measurement of liquid flow in open channels under tidal conditions 0 Buy
396 IS 15123 : 2002
ISO 4362:1999
Hydrometric determinations - Flow measurement in open channels using structures - Trapezoidal broad - Crested weirs 0 Sep, 2017 Buy
397 IS 15124 : 2002
ISO 9195:1992
Liquid flow measurement in open channels - Sampling and analysis of gravel - Bed material 0 Sep, 2017 Buy
398 IS 15310 : 2003

Eiydrauljc design of pump sumps and intakes - Guidelines 0 Mar, 2018 Download
399 IS 15352 : 2018
ISO 6420:2016
(First Revision)
Hydrometry - Position fixing equipment for hydrometric boats (First Revision) 0 ---- Buy
400 IS 15353 : 2003
ISO 8333:1985
Liquid flow measurement in open channels by weirs and flumes - V - Shped broad - Crested weirs 0 Buy
401 IS 15358 : 2003
ISO 9196:1992
Liquid flow measurement in open channels - Flow measurements under ice conditions 0 Buy
402 IS 15359 : 2003
ISO 11329:2001
Hydrometric determinations - Measurement of suspended sediment transport in tidal channels 0 Buy
403 IS 15360 : 2003

Measurement of liquid flow in open channels - Bed material sampling 0 Download
404 IS 15362 : 2003
ISO 14139:2000
Hydrometric determinations - Flow measurements in open channels using structures - Compound gauging structures 0 Buy
405 IS 15442 : 2004

Parameters for environmental impact assessment of water resources projects 1 Sep, 2020 Download
406 IS 15454 : 2004

Liquid flow measurement in open channels - Velocity - Area method using a restricted number of verticals 0 Feb, 2020 Buy
407 IS 15466 : 2004

Rubber seals for hydraulic gates - Specification 0 Download
408 IS 15472 : 2004

Guidelines for planning and design of low level outlets for evacuating storage reservoirs 0 Feb, 2019 Download
409 IS 15527 : 2020
ISO 9210:2017
(First Revision)
Hydrometry - Measurement in Meandering River and in Streams with Unstable Boundaries ( First Revision ) 0 ---- Buy
410 IS 15646 : 2017
ISO 9824:2007
Hydrometry - Measurement of free surface flow in closed conduits (First Revision) 0 ---- Buy
411 IS 15662 : 2006

Geological exploration for gravity dams and overflow structures - Code of practice 2 Feb, 2020 Download
412 IS 15681 : 2006

Geological exploration by geophysical method (Seismic Refraction) - Code of practice 0 Feb, 2020 Download
413 IS 15686 : 2006

Recommendations for preparation of geological and geotechnical maps for river valley projects 0 Feb, 2020 Download
414 IS 15736 : 2007

Geological exploration by geophysical method (Electrical Resistivity) - Code of practice 1 Download
415 IS 15755 : 2007

Hydrometry - Geophysical logging of boreholes for hydrogeological purposes - Considerations and guidelines for making measurements 0 Buy
416 IS 15772 : 2014

(First Revision)
Hydrometry - Field measurement of discharge in large rivers and rivers in flood (First Revision) 0 Download
417 IS 15792 : 2008

Artificial recharge to ground water guidelines 1 Jan, 2018 Download
418 IS 15797 : 2008

Roof top rainwater harvesting - Guidelines 0 Jan, 2018 Download
419 IS 15822 : 2008

Measurement of liquid flow in open channels - Equipment for the measurement of discharge under ice conditions 0 Sep, 2017 Download
420 IS 15823 : 2009

Hydrometry - Computing stream flow using an unsteady flow model 0 Buy
421 IS 15832 : 2008

Glossary of technical terms related to environmental impact 0 Download
422 IS 15840 : 2009

Determination of volume of water and water level in lakes and reservoirs 0 Jan, 2018 Buy
423 IS 15845 : 2009

Environment management plan for hydropower/irrigation/flood control/ multipurpose river valley projects 0 Download
424 IS 15847 : 2020
ISO 9123:2017
(First Revision)
Hydrometry - Stage-fall-discharge Relationship ( First Revision ) 0 ---- Buy
425 IS 15873 : 2010

Hydrometric determination - Unstable channels and ephemeral streams 0 Feb, 2020 Buy
426 IS 15896 : 2011

Manual methods for measurement of ground water level in a well 0 Oct, 2020 Download
427 IS 15897 : 2011

Surface geophysical surveys for hydro geological studies 0 Oct, 2020 Download
428 IS 15898 : Part 1 : 2012
ISO 9555-1:1994
Measurement of liquid flow in open channels - Tracer dilution methods for the measurement of steady flow: Part 1 general 1 Jan, 2017 Buy
429 IS 15898 : Part 3 : 2011
ISO 9555-3:1992
Measurement of liquid flow in open channels - Tracer dilution methods for the measurement of steady flow: Part 3 chemical tracers 0 Mar, 2021 Buy
430 IS 15898 : Part 4 : 2012
ISO 9555-4:1992
Measurement of liquid flow in open channels - Tracer dilution methods for the measurement of steady flow: Part 4 fluorescent tracers 0 Jan, 2017 Buy
431 IS 16091 : 2013

Measurement of liquid flow in open channels - Method of specifying performance of hydrometric equipment 0 Buy
432 IS 16094 : 2018

Hydrometry - Measuring the water level in a well using automated pressure transducer methods - Guidelines 0 ---- Download
433 IS 16115 : 2013

Evaluation of completed irrigation projects (Major And Medium) - Guidelines 0 Mar, 2019 Download
434 IS 16138 : 2013
ISO/TS 15768:2000
Measurement of liquid velocity in open channels - Design, selection and use of electromagnetic current meters 0 Buy
435 IS 16173 : 2014

Criteria for hydraulic design of sediment removal devices for hydro power projects (First Revision) 0 Download
436 IS 16222 : 2018
ISO 9212 :2015
(First Revision)
Hydrometry - Methods of measurement of bedload discharge (First Revision) 0 ---- Buy
437 IS 16223 : 2014
ISO 15769:2010
Hydrometry - Guidelines for the application of acoustic velocity meters using the doppler and echo correlation methods 0 Buy
438 IS 16238 : 2017

Planning of parallel canals - Guidelines 0 ---- Download
439 IS 16274 : 2018
ISO 24155:2016
(First Revision)
Hydrometry - Hydrometric data transmission systems - Specification of system requirements (First Revision) 0 ---- Buy
440 IS 16364 : 2017

Hydrometric uncertainity - Guidance (Hug) 0 ---- Buy
441 IS 16472 : 2016

Design and construction of water courses - Guidelines 0 Apr, 2021 Download
442 IS 16547 : 2017

Investigations for foundation of existing earth and rock fill dams - Guidelines 0 ---- Download
443 IS 16571 : 2017
ISO 4369: 1979
Measurement of liquid flow in open channels - Moving - Boat method 0 ---- Buy
444 IS 16696 : 2018
ISO 11657: 2014
Hydrometry - Suspended sediment in streams and canals - Determination of concentration by surrogate techniques 0 ---- Buy
445 IS 16697 : 2018
ISO 13550:2002
Hydrometric determinations - Flow measurements in open channels using structures - Use of vertical underflow gates 0 ---- Buy
446 IS 16698 : 2019
ISO 18365:2013
Hydrometry - Selection, establishment and operation of a gauging station 0 ---- Buy
447 IS 16275 : 2014

Hydrometry — Acoustic Doppler Profiler — Method and Application for Measurement of Flow in Open Channels 0 ---- Download
448 IS 16804 : 2018
ISO 26906:2015
Hydrometry - Fish passes at flow measurement structures 0 ---- Buy
449 IS 16849 : 2018
ISO/TR 11651:2015
Estimation of sediment deposition in reservoir deposition using one dimensional simulation models 0 ---- Buy
450 IS 17158 : 2019

Guide for type of measurement, choice of location and type of instruments for underground power house 0 ---- Download
451 IS 17271 : 2020
ISO 6416:2017
Hydrometry — Measurement of Discharge by Ultrasonic Transit Time ( Time of Flight ) Method 0 ---- Buy
452 IS 17272 : 2021
ISO 19234:2016
Hydrometry - Low Cost Baffle Solution to Aid Fish Passage at Triangular Profile Weirs that Conform to ISO 4360 0 ---- Buy
453 IS 17273 : 2021

Measurement of Fluid Flow in Closed Conduits - Vocabulary and Symbols 0 ---- Download
454 IS 17287 : 2021
ISO 4185:1980
Measurement of Fluid Flow in Closed Conduits - Weighing Method 0 ---- Buy
455 IS 17288 : 2021
ISO 5168:2005
Measurement of Fluid Flow - Procedures for Evaluation of Uncertainties 0 ---- Buy
456 IS 17289 : 2021
ISO 8316:1987
Measurement of Liquid Flow in Closed Conduits - Method by Collection of the Liquid in a Volumetric Tank 0 ---- Buy
457 IS 17290 : Part 1 : 2021
ISO 9368:1990
Measurement of Liquid Flow in Closed Conduits by Weighing Method - Procedures for Checking Installations Part 1 Static Weighing Systems 0 ---- Buy
458 IS 17422 : 2021

Guidelines for assessment of the environmental heath impacts of river valley projects 0 ---- Download
459 IS 17484 : 2020
ISO 18481:2017
Hydrometry - Liquid Flow Measurement Using End Depth Method in Channels with a Free Overfall 0 ---- Buy
460 IS 17485 : 2020
ISO 2975 Part 1: 197
Measurement of Water Flow in Closed Conduits - Tracer Method Part 1 General 0 ---- Buy
461 IS 17485 : Part 2 : 2021
ISO 2975 Part 2: 197
Measurement of water flow in closed conduits- Tracer Method Part 2 : Constant rate injection method using non-radioactive tracers Adoption of ISO 2975-2:1975 0 ---- Buy
462 IS 17485 : Part 3 : 2021
ISO 2975 -3 :1976
Measurement of water flow in closed conduits- Tracer Method Part 3 : Constant rate injection method using radioactive tracers Adoption of ISO 2971-3:1976 0 ---- Buy
463 IS 17485 : Part 6 : 2021
ISO 2975 Part 6: 197
Measurement of water flow in closed conduits- Tracer Method Part 6 : Transit time method using non-radioactive tracers Adoption of ISO 2971-6:1977 0 ---- Buy
464 IS 17485 : Part 7 : 2021
ISO 2975 Part 7: 197
Measurement of water flow in closed conduits- Tracer Method Part 7 : Transit time method using radioactive tracers Adoption of ISO 2971-7:1977 0 ---- Buy